How to calculate the score of the construction safety inspection score summary table

Updated on educate 2024-03-19
7 answers
  1. Anonymous users2024-02-06

    The scoring of each score sheet shall comply with the following requirements:1

    The full score of the sub-examination score table and the inspection score summary table should be 100 points, and the actual score value of the score sheet should be the sum of the scores of each inspection item;

    The method of deducting the score value shall be adopted, and the sum of the deducted points shall not exceed the value of the examination item;

    When scoring according to the sub-check mark sheet, if there is an item in the guarantee item that is not scored or the subtotal score of the guarantee item is less than 40 points, this item check mark sheet should not be scored;

    The actual score value of each sub-item in the check score summary table should be calculated as follows:

    where: the actual score of each sub-item in the A1 summary table;

    b. The full score for this item in the summary table;

    c. Check the actual score value of the score sheet.

    When the score is missing, check the total score value of the score sheet or the score summary table for each item.

    where: the total score value of A2 when there is a missing item;

    d. The sum of the actual score values of the actual items in the table;

    e The sum of the full score values of the actual items in the table.

    The actual score value of scaffolding, material hoist and construction hoist, tower crane and hoisting project shall be the arithmetic average of the actual score value of the sub-item inspection score table of the corresponding specialty.

  2. Anonymous users2024-02-05

    In order to scientifically evaluate the safety production of construction sites and prevent production safety accidents.

    to ensure the safety and health of construction personnel, improve the level of construction management, and realize the safety inspection work, according to the "Construction Safety Inspection Standards.

    JGJ59-2011), using the construction safety inspection score**, to quantitatively measure the safety implementation of the construction site.

  3. Anonymous users2024-02-04

    In the construction safety inspection score sheet, a score of 75 or more is qualified, a score of 80 or more is excellent, and a score of 75 or less is unqualified.

    The standard is applicable to the construction site of China's construction projects, is the code of conduct for construction practitioners, and is the guarantee for the safety and health of construction workers in the construction process. Therefore, it is necessary to make all practitioners understand the "Standards", be familiar with the "Standards", and apply the "Standards", so that the earnest implementation of the "Standards" has become a conscious action of construction workers.

  4. Anonymous users2024-02-03

    The actual score value of each sub-item in the check score summary table should be calculated as follows:

    a1=b*c 100 where:

    a1 - the actual score of each sub-item in the summary table;

    b. The full score for this item in the summary table;

    c. Check the actual score value of the score sheet.

    The actual score of each sub-item in the summary table = the full score of the item in the summary table The actual score of the check score sheet is 100

    The total score of the summary table shall be the sum of the actual scores of each sub-item in the table, and the total score of the summary table = (the sum of the corresponding actual score values of the actual items in the summary table in the summary table) 100

  5. Anonymous users2024-02-02

    a1=b*c 100 where:

    a1 - the actual score of each sub-item in the summary table;

    b. The full score for this item in the summary table;

    c. Check the actual score value of the score sheet.

    The actual score of each sub-item in the summary table = the full score of the item in the summary table The actual score of the check score sheet is 100

    The total score of the summary table shall be the sum of the actual scores of each sub-item in the table, and the total score of the summary table = (the sum of the corresponding actual score values of the actual items in the summary table in the summary table) 100

    Hope it helps.

    Ask what ABC means.

    Please write a formula to see.

    b. The full score for this item in the summary table;

    c. Check the actual score value of the score sheet.

    In other words, the score in your table is A, which is equal to B C 100, you know?

    Question: Now the construction has not done item C.

  6. Anonymous users2024-02-01

    There are definitely scoring rules, and the total score is generally calculated after the weighted average.

  7. Anonymous users2024-01-31

    The sum of the scores is sufficient, and there is no weighted sum.

Related questions
3 answers2024-03-19

Construction Safety Inspection Standards>> The summary table has a full score of 100 points. The full score of each itemized checklist in the summary table should be: >>>More

8 answers2024-03-19

Sign up for free on the "Tiangong Network".

10 answers2024-03-19

During the construction period, the supervisors should have a comprehensive understanding of the use of building materials, and do a good job in the corresponding quality control work, through the fine management of process quality collection points to support the full control of the pile foundation inspection process, and improve the progress of construction personnel, saving time and reducing costs for enterprises. Zhijian Cloud construction safety management software provides a multi-party collaboration system for problem handling of construction enterprises from quality, safety and equipment, and all participating units can record problems as inspectors, and the rectification units repair and feedback the problems, and then the inspectors review and cancel the problems.

6 answers2024-03-19

GB 50656-2011 Construction enterprise safety production management standard status: current. >>>More

9 answers2024-03-19

Seek truth from facts according to the situation on the spot.