-
The work content of the surveyor surveyor: the surveyor must carry out the selection of control points and burying rocks in the engineering survey, and carry out the observation and bookkeeping of the engineering construction lofting, industrial and civil building construction surveying, linear engineering surveying, bridge engineering surveying, underground engineering construction surveying, hydraulic engineering surveying, geological surveying, ** surveying, mine underground surveying, building deformation surveying and other special surveys, as well as the surveying and mapping of engineering topographic maps; Inspect the measurement results and provide measurement data and measurement drawings.
Note: The premise is to be proficient in the use of total station, level and other measuring instruments for engineering surveying and mapping work; Proficient in using AutoCAD and other software to process measurement results; Need to adapt to field surveying work.
-
There are two categories. 1. Geographic and geological survey, working for map agencies or national agencies, mainly measuring geographic and geomorphological information, and these data are mainly used for making maps.
2. Surveyors of construction enterprises, including infrastructure and real estate, are mainly engaged in the construction of infrastructure projects such as roads, railways, and reservoirs, and the real estate class is well understood. Surveyors of such enterprises need to measure geographical landforms, determine the location and direction of construction, draw scale maps, survey geology, etc.
Both types of work need to be carried out in the field, and it may be necessary to travel for a long time and be stationed at the construction site, and the measuring tool level, total station or something is quite heavy, and it is indeed necessary to carry the instrument around.
However, construction surveying is very important in the construction of the project, which is related to the progress and safety of the entire project, and the future will be good.
I don't know how your academic qualifications are, if it's not very good, it is recommended to take a self-study exam or something to go to university, a diploma is very important for your future promotion and development, after working for a period of time, you should pay attention to applying for a job title, if you graduate from a bachelor's degree, you should evaluate assistant engineers, engineers, senior engineers or something, if your academic qualifications are not good, you have to take the technician or technician or something.
-
Surveyor refers to the use of various professional measuring instruments to measure and set off the project.
Professional and technical personnel in elevation surveying and mapping and data collection related to surveying.
The job responsibilities of the surveyor are:
1. Responsible for the engineering survey before the implementation of the project, including the survey, the selection of control points, etc., and according to the calculation of the corresponding required measurement data, understand the design intent and construction plan of the project, and formulate specific measurement plans.
2. Summarize, sort out and calculate the observation data of construction lofting and engineering surveying of project construction, and provide specific measurement data for design implementation and project change;
3. Before the construction of each main stage, it is necessary to carry out preventive measurement and pay-off work, and cooperate with the implementation process of the project, and carry out the surveying and mapping work in the process of project implementation according to the needs of the site;
4. During the implementation of the whole project, do a good job in the pay-off and line inspection of each main part, conduct strict review, and avoid project rework.
6. Responsible for the accuracy of the measuring instruments to the approved search and calibration, and plan and report the instruments that need to be certified and professionally adjusted in advance;
7. During the completion and acceptance of the project, provide relevant measurement data in a timely manner to ensure the normal acceptance progress of the project;
8. Complete other related work formulated by the leader during the project process.
-
1. Organize the design and formulation of the project construction plan 2, cooperate with the relevant departments to do a good job in the design of equipment installation, the estimated budget of the spine, the audit of the bidding engineering quantity, installation and commissioning, etc. 3. Cooperate with the construction unit to complete the civil engineering and equipment installation tasks in accordance with the relevant management system, installation drawings, operation specifications and schedule requirements 4, timely deal with the different points and complaints that occur in the project management, and continuously improve service satisfaction 5. Supervise and manage the construction site, and do a good job in safety and on-site management 6. Establish progress records and ledgers for civil construction, do a good job of handing over and archiving equipment installation drawings and other materials with the construction unit7, conduct statistics and report analysis on relevant data such as civil engineering and equipment installation operations, and recommend countermeasures according to the analysis data and feedback to the department manager.
-
Closely cooperate with the construction, adhere to the facts, serious and responsible work style.
Before measuring, it is necessary to understand the design intent, learn and check the drawings; Understand the construction deployment and formulate a plan for measuring the socks and pay-off.
Together with the construction unit, the parallel red line pile measurement control points will be surveyed and surveyed.
Verification and calibration of measuring instruments.
-
Do you want to write job responsibilities, or do you want to understand job responsibilities, if you want to write, just find a template on the Internet, if you want to know what a surveyor should do, you must be learning architecture, in fact, it is to do what you learned in surveying class, that is, to take the instrument to go out of the Yanqin field.
-
The main job of a surveyor, as the name suggests, is to carry out surveying, supervision, acceptance, and warehousing.
-
Surveyor Job Responsibilities:
1. It is necessary to understand the design intent, learn and check the drawings, understand the construction deployment, and formulate the measurement and pay-off plan.
2. Together with the construction unit, the red line pile measurement control point will be calibrated on the spot.
3. Cooperate closely with the design, construction, etc., and make full preparations in advance, and formulate a practical and feasible measurement and pay-off plan synchronized with the construction.
4. It is necessary to do a good job of pay-off and line inspection at all stages and main parts of the whole construction, and strengthen the work in reviewing the measurement pay-off plan and guiding the inspection and measurement pay-off work to avoid rework.
-
Engineering surveyors are surveying professionals who are engaged in surveying and management of engineering. Responsible for the measurement of all stages of the project from start-up, construction and operation.
Usually non-surveying and mapping majors, such as: industrial and civil construction, roads and bridges, etc., the full name of the certificate is: surveying and pay-off certificate or through some provincial training institutions and construction departments to obtain engineering surveyors, surveying and mapping engineers and other certificates.
However, these certificates are completely different from the engineering surveyor certificates issued by the National Surveying and Mapping Vocational Skills Appraisal Center, and can be said to be non-professional surveying and mapping skills appraisal certificates.
-
Mapping is all about surveying and mapping. Based on computer technology, optoelectronic technology, network communication technology, space science DAO, and information science, and with global navigation satellite positioning system (GNSS), remote sensing (RS), and geographic information system (GIS) as the technical core, the existing feature points and boundaries on the ground are obtained through measurement means to obtain graphics and location information reflecting the current situation of the ground, which is used for the planning, design, and administrative management of engineering construction.
Construction Engineering Surveying and Mapping specializes in the establishment of the national land control network, land, sea, space precision positioning and navigation, large-scale digital mapping and cadastral map surveying and mapping and the establishment of information systems, various projects, large buildings at all stages of surveying and mapping and deformation monitoring, resources (land, minerals, ocean, etc.) rational development, utilization and environmental remediation.
-
Mapping is all about surveying and mapping. Based on computer technology, optoelectronic technology, network communication technology, space science and information science, and with global navigation satellite positioning system (GNSS), remote sensing (RS) and geographic information system (GIS) as the technical core, the existing feature points and boundaries on the ground are obtained through measurement means to obtain graphics and location information reflecting the current situation of the ground, which are used for the planning, design and administrative management of engineering construction. Construction Engineering Surveying and Mapping specializes in the establishment of the national land control network, land, sea, space precision positioning and navigation, large-scale digital mapping and cadastral map surveying and mapping and the establishment of information systems, various projects, large buildings at all stages of surveying and mapping and deformation monitoring, resources (land, minerals, ocean, etc.) rational development, utilization and environmental remediation.
-
Summary. Dear, hello, I am happy to answer for you: what are the main professional positions in engineering surveying?
Hello dear dear, engineering surveyor, real estate surveyor, photogrammator There are exams every month. Engineering Surveyor, Real Estate Surveyor, Cadastral Surveyor, Cartographer, Photogrammatist. According to the level, it is divided into:
Elementary, Intermediate, Senior, Technician, Senior Technician. Engineering Surveyor: Level 5, Level 4, Level 3, Level 2, Level 1 Real Estate Surveyor:
Cadastral surveyors of the fifth, fourth, third, second, and first grades: fifth, fourth, third, second, and first class cartographers: fifth, fourth, third, second, and first class photogrammegraphers:
Level 5, Level 4, Level 3, Level 2, Level 1 Thank you for your patience. The above is my full reply, if you are satisfied with my service, please give a thumbs up, and I wish you all the best! Peace and joy!
Good. Hello, dear, I am glad to answer for you: what are the main occupations of engineering surveying and slow burial positions
Hello dear dear, engineering surveyor, real estate surveyor, photogrammator There are exams every month. Engineering Surveyor, Real Estate Surveyor, Cadastral Surveyor, Cartographer, Photogrammatist. According to the level of lead, it is divided into:
Elementary, Intermediate, Senior, Technician, Senior Technician. Engineering Surveyor: Level 5, Level 4, Level 3, Level 2, Level 1 Real Estate Surveyor:
Cadastral surveyors of the fifth, fourth, third, second, and first grades: fifth, fourth, third, second, and first-class cartographers: fifth, fourth, third, second, and first-class photogrammegraphers:
Level 5, Level 4, Level 3, Level 2, Level 1 Thank you for your patience. The above is my full reply, if you are satisfied with my service, please give a thumbs up, and I wish you all the best! Peace and joy!
There are two types of development directions for engineering surveying.
As the basic position of the construction industry, in each project is indispensable or respectful, at present, the job gap of surveyors in China is still very large, generally speaking, technicians are starting from the survey, on the construction site, first of all, you have to have the heart to learn, this is the most critical, generally speaking, you complete with a big project, you can be a technician, the technician does a good job, the working life of five years can be evaluated as an engineer, You can also develop into the position of project manager, generally speaking, you should have seven or eight years to become a project manager.
-
An engineering surveyor is a surveying professional who is engaged in surveying and management of engineering. Responsible for the measurement of all stages of the project from start-up, construction and operation.
The only issuing authority for the engineering surveyor certificate is: Vocational Skills Appraisal and Guidance Center of the National Administration of Surveying, Mapping and Geoinformation. This certificate is issued by the Beijing National Surveying, Mapping and Geographic Information Vocational Skills Appraisal Guidance Center, and there is no certificate issuing agency in each province.
The conditions for obtaining the engineering surveyor certificate are: college degree or above in surveying and mapping majors such as engineering surveying and mapping engineering.
-
Summary. Hello dear, the survey work is the assembly of survey, exploration and surveying work, the survey work is mainly field surveying, on-site investigation, survey and measurement of the field before construction, mainly to find out the topography and various natural geological phenomena of the construction site of the project, etc., generally by the survey department to carry out practical work. In a broad sense, survey and survey have basically the same meaning, both including engineering geological exploration and surveying and mapping, but survey is mainly based on surveying and mapping work.
Hello, dear friend, hello, I have received your question, it is expected to take 3 minutes to finish the cherry blossoms, please wait for a while, no, please be patient and wait! ❤
Hello dear, the survey work is the assembly of survey, exploration and surveying work, the survey work is mainly field surveying, now the field survey, before the construction of the field to answer the survey and measurement, mainly to find out the construction site of the topography and various natural geological phenomena, etc., generally by the survey department to carry out practical work. In a broad sense, survey is basically the same as survey, which includes engineering geological exploration and surveying and mapping, but survey is mainly based on surveying and mapping work.
I also worked as a surveyor, and I didn't know anything at first, but after two months of study, I was able to do it myself. >>>More
Because there's a benchmark for everything. Most of the earth is seawater, and many valleys, basins, flatlands, grasslands, and so many valleys, basins, flatlands, grasslands, and so many grasslands in the world are often very large, and there are so many valleys, basins, flatlands, grasslands, or something in the world. Come to think of it, the sea is not flat, but the sea is the best, so it seems like that's it. >>>More
Duties of the Superintendent. 1) Responsible for the preparation of the supervision of the implementation rules of the profession; >>>More
Analysis and purchase of the amount of productive materials (to ensure that there is no sluggish material without continuous supply). >>>More
The most important thing in this work is to be familiar with the drawings, to be familiar with the current price list, comprehensive and various quotas, building materials must be familiar, in addition to the calculation formula of the engineering quantity, the structural practice of the project, the concealed engineering, the change and other professional to be familiar with the use, analysis of materials and calculation of engineering materials; For the sub-items in the quota, especially the corresponding high ones that should be applied, the ability to convince Party A, the supervision party, the audit department and other departments; When bidding, the budget estimate of the project and the rules of the bidding can be mastered comprehensively; The final accounts are not missing, and how to control the project quantity, fees, sub-items and other aspects is the most critical. and master related professional knowledge such as auditing, accounting, materials, design, etc.; The others are dedication, commuting time, work positivity, etc. >>>More