Construction standards for epoxy flooring to cement flooring

Updated on society 2024-06-12
16 answers
  1. Anonymous users2024-02-11

    In this regard, there are strict construction standards, so in this regard, it can be carried out according to the relevant rules and regulations of the country and the construction standards.

  2. Anonymous users2024-02-10

    You can take a look at the building standards for the construction of epoxy floor paint has very strict requirements, according to the national standard construction.

  3. Anonymous users2024-02-09

    The construction standard is that it must be firm, and then it must be resistant, and the quality must be good.

  4. Anonymous users2024-02-08

    Due to the construction standard of such a cement floor, it is mainly necessary to have a certain temperature and environmental limit.

    In addition, there are requirements for humidity, so it is necessary to control the temperature and humidity of the environment.

  5. Anonymous users2024-02-07

    In this regard, it is important to note that there are strict construction standards in this case, and there is an excellent comparison table in this regard, as long as you follow the comparison table.

  6. Anonymous users2024-02-06

    Construction, there are still a lot of his flat screens, and we will all get better use, and we should take him to divide it in time. Now,

  7. Anonymous users2024-02-05

    The standard body size is not the same, and the cars that require noodles are on the back shelves, and the face without regrets is also.

  8. Anonymous users2024-02-04

    Also raising his land, average his level, his Libina construction, his standards are still very accurate, and able to bring him mobile empty numbers.

  9. Anonymous users2024-02-03

    Epoxy flooring has construction standards for cement floors, and I think there are still many standards like this, so I think you can check it on the Internet.

  10. Anonymous users2024-02-02

    The construction standard of epoxy flooring for cement flooring, I think that if there is a standard like this, there will be many requirements for this standard on the Internet, you can take a look.

  11. Anonymous users2024-02-01

    This requires some professional knowledge, and how much is the customization of a standard for this aspect of the country?

  12. Anonymous users2024-01-31

    The main materials are epoxy floor primer, intermediate paint, topcoat, quartz sand, etc., which will be configured and produced by these urban professional manufacturers, and there are many small materials to buy.

  13. Anonymous users2024-01-30

    Epoxy floor coating is a kind of high-strength, wear-resistant, beautiful floor, with no joints, solid texture, good chemical resistance, anti-corrosion, waterproof, dustproof, easy maintenance, low maintenance cost and other advantages. A variety of schemes can be designed according to different application requirements, such as epoxy thin coating flooring, epoxy thick flooring, 1 5mm thick epoxy self-leveling flooring, anti-slip and wear-resistant coating, mortar coating, anti-static, anti-corrosion coating, etc. Epoxy floor coatings have been used for functional flooring since the beginning

    Such as anti-corrosion, wear-resistant, anti-slip, developed to the general general industrial floor; In addition to the functional requirements, it also has a decorative effect.

  14. Anonymous users2024-01-29

    Since its introduction in China, epoxy resin flooring has been widely used in all walks of life, and has played a significant role in the production of enterprises with high-quality performance. Let's find out together.

    1. The cement foundation surface is required to be firm, strong and not shelled, and it is best to pour cement and concrete bottom together to prevent the mortar layer from crusting, and the concrete foundation is dry for 28 days. The ground on the first floor needs to be waterproofed.

    2. The surface layer of the cement base surface is required to be sand-free, with good hardness and no cement pulverization.

    3. The surface is flat, without unevenness, honeycomb surface, cement pimples and other phenomena.

    4. The pH value of the floor surface should be between.

    What are the benefits of making epoxy flooring?

    1. Good wear resistance, 2. Good rolling resistance, 3. Excellent anti-penetration performance, 4. Anti-corrosion performance under moderate conditions, 5. Good adhesion, ensuring that the coating does not crack and does not fall off, 6. The appearance is smooth and tidy, which is easy to clean and protect the Weilu slag bucket, 7. The cost is low, and the epoxy resin floor paint is practiced.

    First, the plain land treatment.

    The basic ground is subject to cement powder smooth surface or grinding stone ground;

    The plain land needs to be maintained for more than 28 days, and the moisture content needs to be less than 8% before the construction of the plain land, if there is unevenness or hollowness, it needs to be removed;

    leveling the ground with epoxy mortar;

    The oil stain of the plain land needs to be cleaned thoroughly;

    Before construction, it is necessary to keep the construction site dry and clean;

    Second, the bottom coat.

    Before construction, it needs to be kept clean, if there is debris adhesion, it needs to be removed, mix the main agent and hardener according to the correct proportion, and stir it fully;

    It is necessary to adjust the appropriate viscosity and mix according to the ground conditions, and the construction of the material needs to be completed within 4 hours;

    The curing time of the undercoat is about 8 hours or more.

    3. Medium coating.

    Before construction, it needs to be kept clean, if there is debris adhesion, it needs to be removed, according to the correct proportion, the main agent and hardener are mixed, and fully stirred;

    Add an appropriate amount of mixed resin to quartz sand;

    Use a trowel to evenly coat the material;

    The mixed materials need to be completed within 30 minutes, and the construction is completed;

    Do a good job of handover at the construction handover;

    The curing and hardening time of the medium coating is about 8 hours or more.

    Fourth, batch coating.

    Mix the main agent and the hardener according to the correct ratio and stir thoroughly;

    Use a batch knife to evenly coat the material;

    The construction of the mixed materials should be completed within 30 minutes;

    The curing and hardening time of soil is about 8 hours;

    Depending on the actual needs, the construction of several roads is required to be smooth and without holes, and there is no batch of knife marks and sanding marks.

    5. Topcoating.

    Before construction, it needs to be kept clean, and if there is any debris adhesion, it needs to be cleaned and removed;

    Stir well with the main agent before use;

    Mix the main agent and the hardener according to the correct ratio and stir thoroughly;

    Use a roller or trowel to evenly coat and mix the material, and the construction should be completed within 30 minutes.

    The construction handover should be handled at the handover place;

    After the construction is completed, it can be used after 24 hours, and it can be repressed after 72 hours (subject to 250C, and the opening time should be moderately extended at low temperatures).

  15. Anonymous users2024-01-28

    Epoxy flooring usually has the following criteria in the acceptance test:

    Ground flatness: epoxy self-leveling 2m ruler is not more than 2mm. The surface is clean, and there is no cracking, peeling, matte surface and sanding.

    Floor drain and ground with slope requirements, the slope should meet the design requirements, no flooding, no leakage, no water accumulation; The combination of plastering surface and floor drain (pipe) is tight and smooth.

    Adhesion: Test with the scratch method, 1 between the tools, and add transparent tape to stick and tear (according to the national standard GB T9286 1988).

    Impact resistance: The specified test refers to the distance from which the paint film can be impacted with a 1kg hammer, and the paint film is not damaged (according to the national standard GB T1732 1993).

    1. Procedures for project completion and acceptance.

    1. Application report.

    When the project meets the acceptance conditions, the contractor can submit the completion application report to the supervisor.

    2. Acceptance. After receiving the completion acceptance application report submitted by the contractor as required, the supervisor shall review the contents of the application report and deal with it according to different circumstances.

    3. Unit project acceptance.

    According to the schedule of the contract, the employer may carry out the acceptance of the unit project when it needs to use the completed unit project before the completion of all the projects, or when the contractor proposes to obtain the consent of the employer. After passing the acceptance, the supervisor shall issue the unit project acceptance certificate signed by the employer to the contractor.

    4. Operation during the construction period.

    It means that the contract project has not been fully completed, and one or several unit projects or engineering equipment installation has been completed, according to the terms of the special contract. If it is necessary to put into operation during the construction period, it can only be put into operation during the construction period after the employer agrees to pass the acceptance and proves that it can ensure safety.

    5. Test run.

    6. Completion and clearance.

    Unless otherwise agreed in the contract, after the issuance of the project acceptance certificate, the contractor shall sort out the construction site as required. Until the supervisor passes the inspection, the cost of completion and clearance shall be borne by the contractor.

    2. What are the conditions for completion acceptance.

    1. Article 16 of the Regulations on the Quality Management of Construction Projects, after the construction unit receives the completion report of the construction project, it shall organize the design, construction, engineering supervision and other relevant units to carry out the completion acceptance.

    2. The following conditions shall be met for the completion and acceptance of construction projects:

    1) Complete the construction project design and the contents agreed in the contract;

    2) Have complete technical files and construction management materials;

    3) There is an approach test report of the main building materials, building accessories and equipment used in the project;

    4) There are quality qualification documents signed by survey, design, construction, engineering supervision and other units;

    5) There is a project warranty signed by the construction unit.

  16. Anonymous users2024-01-27

    The development of today's society, the standard of living, material, living conditions are getting higher and higher, the previous mud floor, cement floor, masonry ground is difficult to meet everyone's needs, this time epoxy mortar floor came into being, this epoxy resin coating mixed with fine quartz sand proportionally blended into the epoxy mortar floor, used for industrial ground, epoxy ground construction, used to increase the floor compression, earthquake, wear resistance and other characteristics, epoxy mortar floor can greatly improve the service life and service life of the ground. Its advantages of high strength, high wear resistance, beautiful and durable, no joints, solid texture, strong chemical resistance, anti-corrosion, dustproof, easy maintenance, low maintenance cost and so on; And various substances can be added according to the needs to make it have anti-static, electrostatic conductivity, anti-slip and other characteristics. Epoxy flooring is widely used in machinery, food, electronics, chemicals, medicine, tobacco, etc., manufacturing factory workshops and warehouse floors.

    So what are the acceptance criteria for epoxy mortar flooring?

    Due to the broad prospect and high income, many builders will build, but because of experience problems, the wide application of epoxy mortar flooring has led to uneven industry standards, and the built epoxy mortar floor not only does not have high strength, high wear resistance, anti-static, electrostatic conduction, anti-slip and other characteristics. It will also crack, break, peel off after a period of use, and spend money on trouble. Now I will give you a brief explanation of the construction and acceptance criteria of epoxy mortar flooring.

    The acceptance criteria start from the following points and carry out acceptance.

    1. Hardening testing standard: when the ambient temperature is 25, it should be solid 2-3 days after construction, that is, the hardness should reach about 80% of the completed curing;

    2. Bubble detection standard: flat coating type, mortar type without bubbles, self-leveling allows 1 small bubble 10 square meters;

    3. Color detection standard: no floating color, uniform color, and extremely inconspicuous color difference is allowed at the large-area interface;

    Fourth, smoothness testing standards: the surface of the floor should be smooth and smooth, the gloss should meet the design requirements (high gloss 90, bright 70, semi-gloss 50 70), flat coating type is glossy, water-based is semi-glossy matte;

    5. Anti-slip effect testing standard: the effect of orange peel and mortar anti-slip surface should be obvious;

    6. Good leveling, no trowel marks, and the large-area interface is basically smooth;

    7. Good leveling, no trowel marks, and the large-area interface is basically smooth;

    8. No volatile organic compound emissions, widely used in the finishing of modern industrial flooring;

    9. Detail testing: no coarse impurities, but minimal defects caused by floating dust falling in the air are allowed.

    You can get it for free

Related questions
13 answers2024-06-12

It can be done. However, it depends on the cleanliness and aesthetics of the floor in your factory. If your plant only requires durability and smoothness, then it is completely OK after hardening and wear-resistant treatment. >>>More

9 answers2024-06-12

a.Confirm the construction area and construction specifications (color and construction area); >>>More

20 answers2024-06-12

1. Because foam is formed in the process of miscible stirring with other surfactants, it causes volume expansion and reduces the utilization rate of blending equipment. >>>More

6 answers2024-06-12

1. Ground grinding: Use a grinder to polish and level the parts of the ground such as cement slag above the ground to remove the ground ash. Other treatment measures are used for loose and oily ground. >>>More

7 answers2024-06-12

1. Base surface cleaning: use a motorized grinder to grind the base surface roughly, and then use a manual grinder to remove the base surface that needs to be thoroughly cleaned; >>>More