The construction cost of a 10,000 square meter office building not only depends on the size of the area, but also depends on many other factors, such as geographical location, type of building structure, building quality requirements, etc. Taking a 10,000-square-meter office building as an example, generally speaking, the construction cost is about 5,000-15,000 square meters, and the specific price depends on the factors mentioned above. As a result, the construction cost range for this office building could be between 5,000 trillion.
It is important to note that this is only a fraction of the cost of construction. In addition to the cost of the building itself, there are other expenses to consider, such as land acquisition fees, design fees, construction management fees, renovation fees, taxes, etc. As a result, the final cost of an office building is likely to be much higher than the cost of construction.
-
According to the general ordinary office building ten construction (800-1200 yuan square) + ordinary water and electricity installation (150-200 yuan square meter) + ordinary decoration 600 yuan square) total unilateral cost about: 1600-2000 yuan square. The total cost is about 4200 * (1600-200) = 6720000--8400000 yuan, single-storey light steel structure workshop (generally no heavy equipment or crane foundation, etc., or other special requirements) civil engineering 200-300 yuan square + steel structure 600-800 yuan square + ordinary capacity hydropower installation 120-150 yuan square + ordinary decoration 200-300 yuan square, the total unilateral cost is about 1200-1600 yuan square, The total cost is about 9000000-12000000 yuan.
-
Generally, the cost of civil engineering is about 1500 yuan m2, the installation cost is 600 yuan m2, and the decoration (installation) cost is about 2500-3000 yuan.
Of course, this is in the ordinary city in the underground three floors (two-storey garage, negative one floor for business), 25 floors above ground (1-4 floors for podium, 5-25 floors for office buildings), the project in Zhengzhou, two buildings totaling 130,000 yuan, civil construction costs, installation costs, decoration costs (in the installation) currently in how many yuan.
Hangzhou is a city with relatively fast economic development in China, so Hangzhou's land price will be more expensive, and it can be seen from the above chart that Hangzhou's land price is a trend chart, which can be calculated according to the information in this chart. For example, if the land is bought in October, the land price per square meter is 14,152 yuan according to the monthly land price in Hangzhou, while the office building is generally about 800 square meters.
-
Summary. Hello dear, here is the following algorithm for you to check the construction cost of Grade A office buildings. Due to the limited construction scale and other indicators provided, only the construction and installation cost of the office building is roughly calculated (excluding land cost, second-class expenses, etc.).
Civil installation engineering: above ground: 20000 * 3500 = 70 million land t:
10000 * 3800 = 3800 5 Pile foundation and foundation pit enclosure: 13 million External wall (granite): 8100 * 2500 = 20.25 million Mechanical and electrical equipment (elevators, air conditioners, etc.) 30000 * 1200 = 36 million Decoration project:
20,000 * 1,800 = 36 million.
Hello dear, here is the following algorithm for you to check the construction cost of Grade A office buildings. Due to the limited construction scale and other indicators provided, only the construction and installation costs of the office building are roughly calculated (excluding the cost of land search and widening, state leakage, and the second class of fees, etc.): Civil engineering and installation works:
Aboveground: 20000 * 3500 = 70 million land t: 10000 * 3800 = 3800 5 pile foundation and foundation pit enclosure:
13 million external wall (granite): 8100 * 2500 = 20.25 million mechanical and electrical equipment (elevators, air conditioners, etc.) 30000 * 1200 = 36 million Decoration project: 20000 * 1800 = 36 million.
1.Determine the foundation of the project: Before calculating the cost, you need to first determine the foundation of the project, including:
civil engineering, interior decoration engineering, landscape engineering, etc.; 2.Make a budget table: summarize the content of each project determined according to the project basis, and make a budget table for the project content, including category, unit price, and project quantity; 3.
Analyze the material**: In the production budget table, focus on the analysis of the material**, clarify its individual **, and the amount of work required to purchase the material; 4.Statistics on labor costs:
Grade A office buildings are mainly affected by labor costs, so when counting, it is necessary to specifically count labor costs, such as how many people need to be used in the family hall, as well as the specific time arrangement; 5.Final statistics: According to the content of the budget table, the materials and wages in each project are added up to calculate the actual project cost, so as to obtain the final cost of Grade A office building.
-
Dear, hello, according to your description, I am giving you the answer--- how to calculate the construction cost of a Grade A office building, the construction cost calculation of a Grade A office building involves a wide range of aspects, I give the general methods and key points here: 1The cost of land.
Grade A office buildings are located in a superior environment, convenient transportation, and high land **, which usually accounts for 20-40% of the total construction cost. It is necessary to estimate the land reasonably according to the site selection conditions**. 2.
Construction costs. This includes the cost of the foundation, the cost of the main structure, the cost of the exterior wall, the cost of decoration, etc. 3.
Foundation cost: Gen Minyan reasonably determines the type and length of the retaining wall and foundation according to the soil conditions and load requirements, and calculates the amount of materials and equipment costs. 4.
Main structure cost: structure, floor height and layout decisions. Costing of steel structures or concrete frames.
6.Decoration cost: The area is calculated and the equipment material is calculated, and the design aesthetics is affected.
7.Other costs. Including design fees, supervision fees, and construction management fees, it accounts for about 5-15% of the total cost.
The cost of construction equipment depends on the type of equipment and the lease period, and accounts for about 1-5%. 8.Decoration and supporting costs.
The cost of interior decoration and office building supporting facilities (high-speed elevators, indoor parking lots, etc.) accounts for 10-25% of the bridge. You can refer to the nature of the project and the decoration grade of a reasonable budget.
-
Summary. Exterior wall insulation area: about times the construction area.
Generally, it is calculated according to the actual pasted area after completion. That is, the perimeter of the building is multiplied by the total height, and the area occupied by the openings of doors and windows, the floor plate of the balcony and the air conditioning board is obtained. If the inside of the balcony, on both sides of the balcony, on the bottom surface of the balcony on the first floor, and on the upper and lower panels of the bay window, there is an additional addition.
The floor area of the office building is 10,000 square meters, what should be the surface area?
Exterior wall insulation area: about times the construction area. Generally, it is calculated according to the actual pasted area after completion.
That is, the circumference of the building is multiplied by the total height, and the number after deducting the area occupied by the door and window openings and the balcony floor and the air conditioning board. If the balcony, both sides of the balcony, the bottom surface of the balcony on the first floor, and the upper and lower panels of the bay window are pasted, add it to the line.
Our company's office building is 10,000 square meters, and the insulation area is 6,000 square meters.
That's right. Isn't it a double.
-
The area is not indicated and the information provided is not detailed enough, according to the general ordinary office building civil construction (800-1200 yuan square) + ordinary water and electricity installation (150-200 yuan square) + ordinary decoration 600 yuan square) The total unilateral cost is about: 1600-2000 yuan square. The total cost is about 4200 * (1600-2000) = 6720000--8400000 yuan.
Single-storey light steel structure workshop (generally no heavy equipment or crane foundation or other special requirements) civil engineering 200-300 yuan square + steel structure 600-800 yuan square + ordinary water and electricity installation 120-150 yuan square + ordinary decoration 200-300 yuan square, the total unilateral cost is about 1200-1600 yuan square, the total cost is about 9000000-120000000 yuan.
-
The cost of an office building is divided according to different grades and areas, as follows:
1) Building brand standard: A-level office building is a specific space for a city to create culture and wealth, and the brand formation of office buildings requires product differentiation characteristics, business culture characteristics, service business philosophy, regional landmark properties and urban historical memory.
2) Location Criteria: Grade A Location is one of the key elements for investing in and buying an office building. Only office buildings that are located in the city's existing or potential business districts, have good locations, and have high investment value can obtain the Location Standard A grade.
3) Customer level standard: A level The customer level refers to the level of owners or tenants who have settled in an office building. Most office customers have the mentality of choosing to live next to each other, so the customer level of an office building is usually convergent.
At the same time, the level of customers also directly affects the investment decisions of new owners or tenants, because a higher level of customers has a better effect on their company image.
4) Service quality standard: A-level service quality is reflected in the efficient property management on the one hand, and on the other hand, it is reflected in the professional business services for the tenants. Both are good and will be considered to have a Class A standard for service quality.
5) Hardware Facility Standards: Level A mainly assesses the innovation of architectural design and architectural functions. As well as the building technology used, standard floor height, standard load-bearing, weak current system, fresh air system, as well as elevators, intelligence, etc.
If two or more of the above aspects cannot be excellent, the hardware facilities standard A level cannot be obtained.
-
The cost price of the frame structure is 2500 yuan m2
I'm a firefighter. I'll help you out:
You rent 2 floors and are ready to open a hotel. What are the 2 floors? What is the floor area? >>>More
Businesses convert unused office space into investment real estate. >>>More
There is a switch for each layer, so that you need 3, and then buy an 8-port switch, which is used to connect 3 switches. >>>More
You can spend 5000 gold coins to buy a card of that, and then you can make one of your stores level 0, re-select the type of store, and the high-end flower basket of that store disappears: or wait until you reach the level where you can open one more store, click on the fast rent, and then click on the yoga studio, and that's it >>>More
The graduation project is still done well by yourself, and you can still learn something.