Construction organization design of a six-storey brick-concrete apartment building.
One. Project Overview:
The 2nd floor project of Anhui Fuhuang Group staff apartment is a six-story brick and concrete structure with a construction area of 3,110 square meters. For residential buildings, the high-rise roof is mainly a sloping roof, and some of them are flat roofs. It is divided into four units.
There are four reinforced concrete staircases. The south façade has an outward-mounted balcony.
Foundation and structural design.
This project is a brick-concrete strip foundation. The elevation of the bottom of the foundation is a specific structure: 200mm C15 plain concrete. M10 cement mortar, MU10 mechanism clay brick masonry. The height is C25 reinforced concrete foundation ring beam.
Wall: The following wall is M10 cement mortar, MU10 clay solid brick masonry; The above to four layers are M10 mixed mortar. The fifth layer is a mixed mortar. The sixth floor to the roof is M5 mixed mortar, MU10 clay hollow brick masonry.
Architectural decoration and decoration.
Doors and windows: mainly steel doors, casement wooden doors, half-slope PVC swing doors, half-slope PVC sliding doors, windows are mainly plastic steel with insulating glass (6+12+6) provided by Party A.
Floor: The ground is plain soil tamping, 100mm thick gravel cushion, 60mm thick C20 concrete with pounding and plastering, plain cement slurry, 20mm thick 1:2 cement mortar surface layer.
The floor is a plain cement slurry with a 20mm cement mortar surface layer. The kitchen and bathroom floors are covered with polyurethane waterproof coating film, and 150mm high concrete waterstops are added along the walls, and the floor elevation of the kitchen and bathroom is 20mm lower than that of other rooms
Inner stucco: 14mm thick 1:3 cement slurry bottom, 6mm thick 1:2 cement slurry surface, full scraping putty, two interior wall paints.
Ceiling: 8mm thick 1:1:4 cement lime mortar bottom, 7mm 1:2 cement mortar surface, one full scraping putty, two interior wall paints.
Exterior decoration: the exterior walls are all cement mortar whitewash; High-grade exterior paints (color owner-determined).
Roofing: cast-in-situ reinforced concrete flat and sloped roofs. The flat roof is 100mm thick lime coke slag, 40mm thick polystyrene insulation, 20mm 1:
3. Cement mortar screed. 30mm thick self-adhesive waterproofing membrane, 35mm thick steel waterproof roof (Master roof plus 25mm cement mortar surface layer); The sloping roof is 15mm 1:3 cement mortar screed, thick BAC self-adhesive waterproofing membrane, 40mm thick expanded EPS polystyrene board, 20mm 1:
3. Cement mortar screed, 30 thick 1:2 waterproof mortar pasted with mud water tile.
Paint: wooden doors, stair handrails with blended paint; Pre-embedded wood bricks are water-asphalted and anti-corrosion.
Hydropower installation. The water and electricity installation of this project includes domestic drainage system, electrical lighting and seismic grounding system.
Construction site conditions.
The construction site has three links and one level, and the construction conditions are met.
The water and electricity used for construction are connected to the construction site by the owner.
The construction period of this project is 150 days, and it is required to be a qualified project. And adopt a supervision and management supervision system.
-
Is it appropriate to send it to you upstairs.
If it's not suitable.
I've got you here, I'll send it to you.
-
Construction plan of an office building of a police station 117
Organization design of curtain wall construction of a high-rise office building in Hefei 34
Organizational design for the construction of the comprehensive office building 197
Office building engineering construction organization design (Chinese and English) 412 Guangzhou office building curtain wall engineering construction organization design 154
Construction organization design of the renovation and renovation project of a high-rise office building in Beijing (won the bid) 215 Blasting demolition and blasting construction plan of a high-rise office building in Jiangsu 216 Organization design of stone curtain wall construction of an office building in Beijing (striving for the Great Wall Cup) 238 Construction organization design of the curtain wall project of an office building in Anhui (Huangshan Cup Luban Award) 221 Organization design of office building renovation construction 215
Organizational design for the construction of the framework of the teaching office building 763
Full set of office building construction plan 226
Office Building Construction Organization Design Template 1029
Shaanxi Provincial Petrochemical Bureau Office Building Construction Project Management Implementation Plan 316 Reinforced Concrete Frame Structure Office Building Construction Plan 741
Construction organization design of an office building 947
Construction organization design of an office building 1288
Frame structure office building construction organization design 1716
Organizational design of the construction of frame-cut structure of multi-functional commercial office building, 534 Construction plan of fire protection system of external liaison office building, 312 Construction organization design of multi-storey brick-concrete structure office building, 1979
Machinery Factory Office Building Engineering Foundation Assessment Report 166
Construction organization design of a comprehensive office building 611
Construction plan for ventilation and heating of an office building in Beijing 338
Construction plan of the three-story reinforced concrete frame structure office building of the police station.
-
Table of Contents.
Engineering Overview 4
Construction Deployment 4
Preparation for construction 4
Construction section division 5
Workforce Staffing 5
The main construction machinery and equipment configuration 6
Construction site layout 6
General construction process 7
Construction technology and technical measures of main sub-projects 7
Engineering positioning, pay-off 7
Earthworks 8
Foundation construction 8
Masonry Works 9
Reinforced concrete works 10
Reinforcement Works 10
Formwork Engineering 12
Concrete works 14
Decoration Engineering Construction 15
Door and window works 16
Roofing and waterproof and moisture-proof works 16
Construction of coiled roofing engineering 16
Toilet moisture-proof engineering construction 17
Plumbing, fire protection and electrical installation works 17
Plumbing and Fire Protection Installation Works 17
Electrical Engineering 18
Duration Guarantee Measures 19
Duration Assurance Management Measures 19
Technical measures for the guarantee of the construction period 20
Promote new technologies and materials 21
New Technologies 21
New Materials 21
Quality Assurance System and Quality Assurance Measures 21
Quality Assurance System 21
Quality Management System 22
Quality Assurance Measures 24
Quality assurance measures in preparation 24
Quality assurance measures during construction 24
Major sub-item quality assurance measures 24
Finished product protection measures 26
Seasonal construction measures 28
Typhoon Season Construction Measures 29
Rainy season construction measures 29
Measures to ensure safe production and civilized construction 32
Work Safety 32
Civilization-building measures 32
Environmental protection measures 34
Measures to prevent air pollution 34
Prevent noise pollution 35
Garbage control 36
Schedule 37 Construction Schedule Network Diagram 37
Construction Floor Plan 38
Company Commitment 39
I just tried to send you the whole Shi group degree, but there are too many words to send, this is what I spent a long time carefully selecting from the Internet, I read it from beginning to end, and it meets your requirements.
I can only send you a directory, if you want to send me your email address, I'll send you directly in your mailbox.
Six-storey brick-concrete structure construction organization design. >>>More
I'm the opposite! After Goethe finished speaking, he smiled and retreated to the side of the road. >>>More
It depends on the steel you choose, and the cross-section of the beam. >>>More
From Nanjing Railway Station, take No. 13 to go up (Nanjing Railway Station - Nanhu), transfer to No. 134 to go down (Stone Town Park - Cotton Embankment) at Tuas Tea Pavilion to arrive at Lushan Road. Approx. km. >>>More
Two acupuncture points to relieve toothache in one minute!