1. In order to ensure the unification of the position of the switch and socket in the future, the hydropower master will play the line on the wall before slotting, and also use the cup to connect it uniformly, so that there will be no different levels of the socket in the future. Another point must be paid attention to in the process of hydropower transformation, the wire must be covered with insulating pipes.
2. Pay attention to the quality of decoration water pipes and choose credible big brands as decoration materials, so as not to cause unnecessary trouble to daily life in the future. At the same time, you should communicate with the hydropower renovation master, place the faucets at home, and try to make the spacing between the sewage pool and the faucet reasonable. Renovation of water and electricity renovation is a work that requires special details, in order to have fewer water and electricity problems at home in the future, spend more time learning now.
3. The water pipe through the living room walks from the top, the kitchen and bathroom are covered by an aluminum gusset ceiling, and the corner is walked through the living room, wrapped with gypsum wire, and if there is a water leak, it can be found immediately. The hydropower renovation master will make two holes when slotting, and the two water pipes will be naturally separated when laying the pipes, so as to ensure the spacing of the hot and cold water pipes and reduce the potential safety hazards of the water pipes.
Fourth, the direction of the pipeline must be kept horizontal and vertical. Although a slight oblique point does not have any impact on life, professional hydropower renovation should insist on doing better. Sometimes the hollowing phenomenon on the ground is not caused by improper masonry construction, but is caused by the spacing of the ground line pipe.
The floor pipes of the floor tiles laid by the hydropower renovation master are required to be more than 3 side by side, with a spacing greater than 20mm, and there is an appropriate distance, and the cement can be filled in, so there will be no hollowing.
Fifth, the preparation for hydropower transformation is done.
-
The renovation of water and electricity in the new house is generally based on the suggestions of the hydropower master and the personal preferences of the owner to carry out a comprehensive transformation, including waterway transformation and circuit transformation, generally depends on whether the water and electricity of the decoration house is enough, it is expected that if it is enough, it is not necessary to change, if it is not enough, it is best to change it before the decoration, and once the construction is completed, it will be very troublesome to change the water and electricity again, and the project is relatively large and the loss is large.
-
However, in the actual operation, it is calculated according to the actual engineering quantity, so some customers do not understand the situation, dismantle and change the water and electricity at will, and when the cost is settled, they find that it is far from what they imagined, which leads to disputes between the two sides, resulting in a stalemate in the relationship, and it is difficult to continue the work behind. Therefore, in the hydropower renovation project, the purpose should be clear, and it is best to keep the original pipeline unchanged and change it according to the designer's design, so that you can also know it. In addition, you should pay attention to the engineering quality of hydropower, and now introduce several precautions for installing and modifying hydropower.
Regarding the precautions for installing and modifying water and electricity, first look at the construction method of the wire
Whether the electrical products are qualified products that meet the relevant standards.
The electrical wire is laid with flame-retardant dark pipe, and the wire should not have knots and kinks in the pipe.
It is forbidden to bury the wire directly in the plastering layer.
The live wire enters the switch, and the zero wire enters the lamp head", and the socket wiring should comply with the provisions of "left zero and right fire grounding".
Air conditioners and high-power electrical appliances should be separately piped (flame retardant pipe treatment).
Precautions for installation and modification of water and electricity, power cords, TV cables, and ** wires shall not be installed in the same pipeline.
The switch and socket are firmly installed, the position is correct, the cover plate is upright, close to the wall, and there is no gap around.
After the installation of electrical engineering, electrical energization, lighting test of lamps and lanterns, switch control, etc. should be carried out. After the completion of the project, the customer should be provided with wiring construction drawings, indicating the specifications and direction of the wire.
Precautions for installation and modification of water and electricity Secondly, the installation of pipelines should:
Precautions for installation and modification of water and electricity, the pipeline arrangement is reasonable, the laying is firm, horizontal and vertical, the switch and valve are installed smoothly, and the use is flexible and convenient.
The water supply pipes and accessories are tightly connected, there is no leakage in the water pressure test, the water outlet is smooth, and the water meter is in normal operation.
The drainage pipe should be unblocked, no blockage, no leakage, the bottom of the bathtub should be higher than the drain bend, and the floor drain grate should be slightly lower than the ground.
Precautions for installation and modification of water and electricity, sanitary ware is installed firmly, and the appearance is smooth and clean without damage.
-
In the process of our home decoration, the renovation of home decoration water and electricity can be described as a key project, because it is closely related to the daily life after decoration, for us, if we do not understand what problems need to be paid attention to in the installation and modification of water and electricity, it will bring a lot of difficulties to the decoration or acceptance after decoration. Generally, the square socket is enough, and high-power appliances such as air conditioners, water heaters, and other high-power appliances need to be connected to 4 square wires separately. Embedded wires in new homes are generally yes.
Each house is different, if necessary, you can ask the developer or open the wiring box yourself to measure. If yes, it's useless to take 4 squares. Unless you come from the bus.
If the room is reserved, if it can meet the needs, don't have more wiring. Generally, the socket, lighting, air conditioner single circuit, or kitchen single circuit are separated in the distribution box, so as to be ready for later maintenance or independent shutdown without affecting the lighting or use of other rooms. What you are talking about should be a single line in a tube, and it is rare to walk a line in a tube.
The location of the socket in the kitchen is done according to the custom pattern of the cabinet and the functional division area, and one should be left under the sink in case the kitchen treasure needs to be installed. The smoke machine can be reserved above the smoke machine. Such as microwave ovens, ovens, induction cookers or rice cookers.
To be placed in the operation area. Generally, in the middle of the cabinet countertop and the wall cabinet, 4 sockets in a row should be enough, and these can be considered to take a 4 square line alone. It doesn't matter if the switch has a spacing, it can be neat.
If you need to be wired separately, you can connect it separately, such as the socket you want to add. Hydropower renovation is a hidden project in decoration, which is directly related to the comfort and safety performance of future living. We should also try to choose big brands when choosing to avoid unnecessary troubles in the future.
I hope you also understand what problems need to be paid attention to when installing and modifying water and electricity, and you can come in handy when the time comes.
-
Concealed content requirements, electrical trunk and weak current embedded using welded steel pipes, electrical sockets and lighting line pipelines using PVC pipes, requiring material specifications and parts should meet the design requirements.
The specific attention and acceptance requirements can be queried by yourself (building electrical acceptance specifications in construction engineering quality control) is very detailed.
-
The main thing is that the wire pipe interface should be formal to ensure the smooth flow of threading. The acceptance is mainly to see whether the wire is a national standard line. The wires reserved are not in place.
-
Hydropower renovation is a hidden project in the decoration, and it is also the most important part of the decoration! If the quality of hydropower renovation is not up to standard, it will cause great trouble to our lives! If there is a problem after the house is renovated, it will take a lot of effort to repair, and it will cause a lot of inconvenience to home life, so we must pay special attention to the renovation of water and electricity when carrying out household appliance projects, and supervise the workers to construct carefully.
Precautions for hydropower renovation of new house decoration: 1. Shielded cables should be used for weak current, and the secondary decoration line layout needs to be re-slotted wiring, most of the strong and weak currents can only be piped from the ground, and it is very common for strong and weak current pipes to cross and be parallel in close proximity. If the weak current uses unshielded cables, it may cause signal interference.
2. The design principle of circuit routing grasps the principle of "the shortest distance between the two ends", does not deliberately wind, and maintains a relative degree of "live wire" 3. In principle, if the strong electric pipe provided by the developer is a PVC pipe, it is advisable to use PVC pipe during the secondary hydropower transformation, and it is not appropriate to use JDG pipe (sleeve tight galvanized steel conduit), otherwise it is difficult to realize the overall grounding connection, which will leave future troubles. If the strong electric pipe provided by the original developer is a JDG pipe itself, both pipes can be used. 4. Hydropower design needs to grasp whether the water circuit transformation design scheme required by itself matches the actual hydropower system (especially for second-hand houses, which will be explained below), such as if the new residential building uses instantaneous electric water heaters, air conditioners and other electrical appliances with particularly high power, it is necessary to consider a new route from the distribution box for use.
5. Kitchen water and electricity design needs cabinet design drawings to cooperate with safety assessment 6. When designing water and electricity, we must master the size and characteristics of furniture, electrical equipment in the kitchen, bathroom and other functional rooms, so as to make accurate positioning of the hydropower transformation plan. 7. The functional reference configuration of ordinary residential water and electricity design equipment, taking the ordinary configuration of three bedrooms, one living room, one bathroom and one kitchen as an example, and so on for large apartments. The above is the sharing of 7 precautions for hydropower transformation, I hope it will have a certain reference role for you!
In addition, when decorating, it is recommended to visit the building materials market more and understand the decoration materials, which is very important for the owners who use half package or clear package repairs!I wish you a smooth renovation and a speedy move into your new house!If you are satisfied, please give it a thumbs up!
The space area of the villa is relatively large, so the whole hydropower design process involves a lot of hydropower line transformation, if the location of the hydropower line is not renovated, it will directly affect the normal life of the owners. What are the precautions for hydropower transformation? Let's explain it to you! >>>More
3,4,5,6 months decoration is better, decoration cost is not luxury decoration, 100 square meters or so 150,000 or so. Please comment on me, thanks.
It is not easy to decorate a house, both the owner and the construction personnel have paid a lot, so it is particularly important to accept the house after the decoration. Many owners do not know how to accept after the decoration, which has a lot to pay attention to, today we will talk about how to accept the house after the decoration? What are the precautions for acceptance? >>>More
It is necessary.
In fact, when it comes to hydropower retrofits, most users retain the water circuits that developers are equipped with. On the other hand, the quality of the water and electricity pipelines equipped by the developer is basically up to standard (especially **), and even better than the products purchased by some users. >>>More
Hydropower installation refers to the decoration process of replacing all or part of the waterways and circuits used by the original developer according to the decoration configuration, family population, living habits, and aesthetic concepts. Hydropower transformation is divided into waterway transformation and circuit transformation. Hydropower projects are hidden projects, so they must not be sloppy! >>>More