The toilet at home is leaking, how to do it waterproof?
In general, the toilet at home leaks, and a large part of the reason is that there is no secondary drainage!
Long-term bathing water in the bathroom at home will cause a lot of water accumulation in the bathroom backfill layer, and once there are some corners that are not waterproofed, it will leak downstairs, causing great trouble.
So what's the best way to do waterproofing?
First: first deal with the foundation of the lowest layer of the toilet, clean it cleanly, and then paint the corners with the plugging king, especially the position of the toilet sewer pipe, and be sure to make a slope out.
Second: Be sure to do secondary drainage! With secondary drainage, there will be no water accumulation, and there will be no water leakage.
Clay backfill, secondary drainage process.
Construction drawings of the toilet secondary drainage site, clay backfill.
Third: use the best waterproof paint for at least two times. If you have the conditions, you can brush it three times!
Fourth: try to use clay particles for backfilling, after all, construction waste is easy to destroy the waterproof layer.
Fifth: It is best to do a beautiful seam in the bathroom, because the beautiful seam can block the gap between the tiles, and the water is not easy to leak through the gap.
-
It should be brushed with a layer of waterproof paint or some waterproof material. This may be better, and it must be done all at once, otherwise it will be very sad to leak water often in the future.
-
Choose an effective waterproof material, it is best to apply it twice, and then apply it once after the first time it is dry, so that it is relatively better.
-
When choosing the material of the waterproof platform, you should choose some waterproof performance, it is best to choose marble, and you also need to lay some pebbles around, so that you can have the effect of water seepage.
-
I remember that we did a lot of waterproofing when we renovated the toilet, at the beginning of the time did not do the water in it, and then went downstairs to see if there was a leak, we didn't know, and so the workers came to do things, we have not gone to the wet water, and then temporarily hurried to go, and waited until the next day to see if the leak was leaking, at that time with the property to go, it was too dark inside, I couldn't see it at all, because the family did not decorate, vaguely saw that the pipe was a little damp, and thought it was a leak, Later, I told the property to let them rework, and after doing it again, it was still the same effect, and then the waterproofing master said that it was not a water leak, and it was normal to look like that. <>
Later, everyone thought that there was no water leakage, and then the waterproof master began to construct, after doing it again, wait for it to dry, and then wet the water again, when I went downstairs for the second time, the place was still like this, it looked like a leak, and then the flashlight was turned on, and it was waterproof not in place, this situation needed to let the property come and rework, and did it many times, the toilet waterproofing is particularly important, if there is a problem in the future, it is very troublesome, it is best to make the wall one meter high, so as not to leak in that place, Because the toilet is easy to leak when bathing water for a long time, you must go to the scene to watch it when you do it. <>
Although we don't understand, but we can tell the master, let him do a little better, so as not to rework in the back is very troublesome, like I used to only need to do toilet waterproofing, now even the balcony and kitchen have to do, in fact, those places are really very little water, invisibly and there is an extra cost, but this is a property must requirement, there is no way to do it, think about it or do it more assured, if there is a leak in the future, it is not their own consequences, the floor is all warped, it is too troublesome and the cost is too high, in short, Decoration must be done by staring at the master, otherwise there is something that is not done, and it is particularly troublesome to transform it in the later stage, and there is a place in our house that is not done, but when you go, others have finished installing, and it is too late to regret it. <>
-
1. There are two main reasons for bathroom leakage:
1. There are leaks in your own waterways.
2. The top layer of waterproofing is unqualified. You can ask the master to check whether the sewer pipe is not tightly closed, focusing on the water pipe of the basin and toilet, and the workers may damage these two places if they do not pay attention during the decoration.
2. Test whether the water inlet pipe is leaking.
1. If it keeps dripping, turn off the main gate first, and open all the faucets at home to drain all the water in the water pipe, and then turn off the faucet. (Note: Do not use any water for half a day or a full day after two or three hours.)
2. After confirming that the dripping water downstairs has stopped, open the main gate again, and do not use any water for half a day or a whole day after two or three hours.
3. If there is a drop of water downstairs, it means that the inlet pipe is leaking, and if it is not dripping for more than a day, it means that it should not be a leak in the inlet pipe.
3. Test whether the drain pipe is leaking.
Find a soft water pipe connected to the faucet at one end, and flush the water at the other end against the floor drain, and insist on more than half an hour to see if there will be water leakage downstairs. At this time, do not let any water flow outside the floor drain so that you can accurately test whether there is a leaking drain problem.
Fourth, the solution.
1.If it is a leaking water pipe, there is no good solution but to dig it up.
2.If it is only the waterproof layer of the bathroom or the surface leakage, there is no need to dig it up, as long as the surface of the bathroom is treated to a drip.
-
It's normal, waterproofing is just to coat a layer of waterproof latex paint on the wall, this waterproof effect is not necessarily very good, the real waterproofing, should be made of cement slurry concrete, and then the concrete can be done at least 20 cm, but this is very expensive and labor-intensive, so most people will not do this.
-
Hello answer, according to my query. 1. The problem of materials, waterproof coatings must be selected with high quality, do not choose inferior materials, the waterproof effect of inferior materials is really too pitiful, generally after a cycle, there is no waterproof effect. 2. The problem of the construction of the workers, the workers may be in a hurry to do the roughness, the rejection of the membrane is not dealt with well, and the uneven brushing is also the reason for the poor waterproof effect.
3. The problem of household pipes, the interface of the pipeline is also a very important place, and the water leakage may be in the pipe interface and the yin and yang angles, that is to say, the waterproofing of these points is not in place and has not been dealt with well. Therefore, the position of this node must be dealt with well, waterproofed with mortar, and then waterproofed after coating, so as to ensure that this will not happen. Hope it can help you.
Than the heart] [than the heart].
-
The bathroom is waterproof, but it still leaks, it should be waterproof and not in place.
Bathroom waterproofing should be careful and serious, the first time should be done after the try to do it, if the leakage can be repaired, and then do it again, so that the problem of water leakage can be solved.
-
Why does the bathroom leak even if it is waterproof? Waterproofing does not mean that he does not leak, but after you do waterproofing, you must do a good job of ensuring quality, which means that the quality of your waterproofing is not good, but after doing waterproofing, you must sprinkle water on it, or more than an inch and fifty or sixty years of water, or about 100 water after 24 hours, so that you can not record, so that you can start to do the next process, so as to ensure that the bathroom has to be waterproof and not leaky.
-
The bathroom is waterproof, but it will still leak, that is because the waterproofing of the bathroom is not done, and it is more troublesome to deal with it now. So you have to do it well at the beginning.
-
If you are still leaking after waterproofing, it can only mean that you are not completely waterproof. And then it happened. If there is still a leak, then you have to turn the waterproof back on to see it, or do it again.
If you can find the leakage, there is a 20cm wide area around the area, and then redo the waterproofing.
-
Generally, after doing a good job of waterproofing, it will be soaked in water for more than three days to test the waterproof effect. The time is too short, for some very slight leaks, the water has been discharged before the water leaks out, and it will slowly be revealed after a period of time after moving in.
-
In this case, it may be that the waterproof quality is not good.
-
First, the problem of waterproof materials.
Second, the construction is not careful.
3. After a long time, the pipeline leaks and ages.
-
The bathroom is waterproof or leaking, which means that the waterproofing you have done is not up to standard, and you still need to rework.
-
The waterproofing of the bathroom is not in place, such as the joints are not sealed well, and the corners are left with gaps before water leakage and seepage.
-
The bathroom is waterproof, but the waterproof is not very good, of course it will leak. It's like if you can eat two bowls of a meal, but you only eat half a bowl of this meal, and even though you eat, you still feel hungry.
-
Why does the bathroom leak even if it is waterproof? Did he not do a good job, or was the quality not good? The quality is not good, he did not do a good job of waterproofing.
-
The bathroom waterproofing must be done well, and the bathroom waterproofing should be a little higher and thicker, so as to avoid endless troubles.
-
The bathroom waterproofing is very good, and the bathroom leakage should be redone. If everyone closes the inlet valve, the leakage and dripping will stop; After opening the bathroom water inlet, the downstairs keeps leaking, indicating that the bathroom water inlet pipe is leaking; If there is no problem with the water inlet pipe, we can flush the water in the sewer pipes such as wash basins, toilets, etc. If the leakage downstairs is aggravated, it means that the sewer pipe is leaking.
If there is no problem with the bathroom plumbing, it means that the waterproof layer is leaking. During the construction of the bathroom, we should pay attention to the details and try not to destroy the original waterproof layer, otherwise it will affect the construction progress in the later stage.
1.Before the construction of the bathroom wall, it is also necessary to do a good job of waterproofing process, otherwise there will be water seepage in the later stage, which is very troublesome. Under normal circumstances, the waterproofing of the bathroom wall is needed, but by installing the bathtub, the waterproofing around it needs to be increased appropriately, no matter what, so that there is no fear of water splashing out of the bathtub in the later stage.
Try not to damage the original waterproof layer. Care should be taken at each construction site, because some waterproofing materials are relatively thin, and the slightest carelessness may damage the waterproofing layer.
2.If there is a problem with the waterproofing layer of the bathroom, a new type of penetrating waterproofing agent can be used. First clean the caulk of the bathroom tiles, then apply penetrating waterproofing, and finally fill the tile joints with waterproofing paste.
Or we can redo the waterproofing of the bathroom, and then carry out the closed water test after the waterproofing layer is completed. If the bathroom water pipe is leaking and the upper and lower pipes are on the floor, we will find the location of the leak, remove the tiles in this area, and replace the broken pipe.
3.The floor tiles in the bathroom should be waterproof. If the bathroom needs to replace the original floor tiles, after the original floor tiles are chiseled, the ground must be leveled with cement mortar first, and then waterproofed.
In this way, it can not only avoid the leakage of the waterproof coating due to uneven thickness, but also avoid the uneven base layer and affect the service life of the material, and the waterproof material plays a great role. The above is the answer to the problem of how to deal with toilet leakage and how to deal with toilet waterproofing.
-
If there is a water leak, it should be re-treated, a floor drain should be replaced, and the waterproof process should be re-done. The inlet valve needs to be turned off. It is also possible to do a waterproof layer, and water seepage can be done to check the water pipe. It may be caused by a waterproof layer, or it may be caused by a relatively humid layer.
-
Waterproofing of the bathroom is very important. If there is a leak in the bathroom, it should be repaired starting from the sewer pipe. This is a very large amount of work.
-
First close the valve, plug the leakage, then clean the water, and then find a professional to come to the door for inspection and repair.
-
The reason for this is that the construction is not standardized.
If the waterproof is done, if there is no standard closed water test inspection, it will eventually lead to water leakage.
The national standard for closed water test requires that it needs to be done twice, once after the waterproof coating is completed and the waterproof coating film is dry; The second is after the waterproof protective underlayment or finishing layer has been completed.
If only the first closed water test is done, then the waterproofing may be damaged in the subsequent process of making protective cushion or laying wall and floor tiles.
-
It is certain that the waterproof is not qualified, if you can find the hydropower installer at that time, you will find them to solve it, if you can't contact it, then find a hydropower installer to deal with it.
-
Bathroom waterproofing is one of the more important items in interior decoration, and some owners will still leak after waterproofing the bathroom. So in the face of bathroom leakage, how should everyone deal with it? Next, I will briefly introduce to you how to deal with the waterproof and leakage of the bathroom.
1. First of all, we need to analyze the cause of water leakage in the bathroom, if we turn off the water inlet valve, the leakage and dripping stop; After the bathroom water inlet is opened, the downstairs water leaks continuously, which means that the toilet inlet pipe is leaking; If there is no problem with the water inlet pipe, we can divide the sewer pipe such as wash basin and toilet to flush the water, if the leakage downstairs is aggravated, it means that the sewer pipe is leaking; If there is no problem with the bathroom plumbing, it means that the waterproof layer is leaking.
2. If there is a problem with the waterproof layer of the bathroom, you can use a new type of penetrating waterproofing agent, first clean up the caulk of the bathroom tiles, then apply the penetrating waterproofing agent, and finally fill the tile joints with waterproof paste. Or we can do the waterproofing of the bathroom again, and carry out a closed water test after the waterproofing layer is done.
3. If there is a leak in the bathroom water pipe, and the upper and lower water pipes are on the ground, we find the location of the leakage, remove the tiles in this range, and then replace the broken water pipe; Or we buy a special adhesive and apply it around the cracked water pipe, using the adhesive to bond the leaky water pipe together. Nowadays, many people are asking the decoration company to carry out interior decoration, and the general decoration company will give a certain warranty period to the project, if it is within the warranty period, the owner can ask the decoration company to deal with the problem of water leakage in the bathroom.
Summary: How to deal with the waterproof or leakage of the bathroom, I will briefly introduce it to you here. I hope that after reading this article, you will be able to understand everything about this. If there is a leak in the bathroom, we can also ask a professional to fix it.
Your practice is already very good, it should be said that use medium mortar to make a layer of internal plastering. >>>More
1. Developers use periodic waterproof materials, generally based on polypropylene, with low cost and waterproof life within 5 years. >>>More
To do waterproofing, you need to do it on the surface of the water, and you can do it yourself. >>>More
If it is the original waterproof floor drain leakage, you can first knock off the floor tiles around the floor drain, the diameter is about meters, be sure to knock on the structural layer of the house (the original waterproof layer), the floor drain is close to the structure layer around the hair, the depth is about 2-3cm, after watering and moisturizing, first use the plugging king (powder) to add water to make a thin mud, evenly smear the floor drain periphery, and maintain 2-3 times (watering) after drying; But it is worth noting that the waterproof layer is restored, it must be equivalent to the material properties of the old waterproof layer, if it is a water-type coating, you can use acrylic acid, JS polymers, if it is oily, you must wait for the plugging king material to dry completely, with 911 polyurethane paint, paint no less than 2 times, done, dry for more than 24 hours, you can do a closed water experiment, do not leak and then restore the floor tile.
1. Bathroom waterproof construction steps.
Step 1: You can use a slightly coarser cement to base the foundation first, and then brush the waterproof paint after the cement is dry. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More