The most complicated part of the installation of wall-mounted panels is when the surface plate (compact panel) is fixed together with the keel. Then on the installation process and steps of the entire wall-mounted panel, I will make some introductions:
1. Installation:
There are two types of installation methods: dry-mounted and wet-mounted.
Dry-hung type: the keel and the surface plate are fixed by screws, corner codes, adjustable hang-ups, etc.
Wet hanging type: It is glued between the two by strong glue, so as to fix.
Second, the advantages of installation:
Most contractors will use the dry hanging type, which has the advantages of durability, smoothness and not easy to deform, and detachability. The wet-hung type has the advantages of simple, fast and economical construction, but it is easy to be damaged.
3. Installation steps:
1. Pay-off measurement, according to the instructions of the drawing, measure the interval between the horizontal and vertical keels, the fixed point of the corner code and other positions. Wall Panel Accessories:
2. Fix the keel, after the measurement is completed, the vertical keel is installed in turn according to the size of the drawing, and the horizontal keel is installed on the outside. Through the corner code, buckle and other accessories, the horizontal and vertical keel is fixed.
3. Install the plate, the principle of the installation sequence of the plate is from the bottom to the top, from the edge to the inside, and finally to close the window sill. When installing, pay attention to inserting the insert into the vertical groove in time, and pay attention to whether the sealing direction is correct.
-
In this regard, as long as it is implemented according to his specific plan, under normal circumstances, the corresponding installation conditions are selected according to its functionality, and there is no problem.
-
900 900 strips, right? How to install? I think that like this debug version, its installation method is very easy, you can follow its instructions to install it.
-
The 900 900's debug board is installed by means of his nut.
-
The 900 900 debugging board is installed directly according to the instructions.
-
If you don't know how to install this yourself, you must find a professional master, otherwise it is easy to be dangerous.
-
If it is impersonated with a Smick negative ion health board, then put it directly on the oblique side of the ceiling, and the wall gun nails and keels are OK
-
In this case, his installation method is relatively simple, as long as the installation is carried out according to his specific plan, there is no problem to achieve the effect is better.
-
If you want to install the floor of this debugger, you can install it according to the manual.
-
How about the debug version of the motherboard on the motherboard, it should really be the person who directly finds the special installer should be he to give you the position you get on.
-
If you want to install it, I think it must be the size of it, and there is a good ratio.
-
0090 jump to eat how to install this, you should go to find a professional to help you install it.
-
Why the debug version of Android? In fact, if you can find a tutorial on the Internet, there should be one on station b.
-
It's easier to install the slate at night.
-
At that time, how to install, the specific situation of on-site operation or not to take.
-
It avoids the air conditioning wind blowing directly on people, so that you can reduce air conditioning sickness.
of occurrences. And the air conditioner wind shield can also prevent dust from entering the inside of the air conditioner. Here's how to install the air conditioner wind shield:
1. First of all, check whether the accessories of the wind deflector are complete, including a panel, two adhesive plates, and two connecting rods, as shown in the figure below.
2. Press the movable end of the connecting rod to 90 degrees from the groove, and both of them are operated in the same way.
3. Next, press the end of the connecting rod to 90 degrees and the convex spherical part of the adhesive plate until the ball enters the connecting rod, as shown in the figure below.
4. Then, put the wind deflector flat on the ground, and push the other end of the connecting rod into the corresponding groove of the wind deflector by hand, and put both connecting rods into the wind deflector. The part with the adhesive plate is facing inward.
5. Next, go to the air conditioner in the room, wipe the positions to be glued on both sides of the air conditioner, and it is recommended to use a dry towel, so that you don't have to wait for the water to dry.
6. Compare the length of the air conditioner and adjust the wind deflector to the appropriate length.
7. Tear off the stickers on the sticky board, and glue the two sticky boards to the suitable position on both sides of the air conditioner. If the height is not enough, you can move a stool and stand on it.
8. Finally, after determining the position, press the sticky plate tightly to prevent it from falling off in the future.
-
Air conditioner is an indispensable household appliance in our family life, and we also know that air conditioner has many parts, among which the function of air conditioning wind deflector is also relatively powerful. In fact, the benefits of air conditioning wind deflector are very many, first of all, it avoids the air conditioning wind blowing directly on people, so as to reduce the occurrence of air conditioning disease. And the air conditioner wind shield can also prevent dust from entering the inside of the air conditioner.
-
The use of the air conditioning wind shield is still very simple. Generally, when you buy an air conditioner wind shield, you will come with an instruction manual. You can follow the instruction manual of the air conditioner's wind deflector to install and turn on the air conditioner, and then adjust the blowing direction of the air conditioner according to your needs.
This kind of thing is still very convenient. Pay attention to the air conditioner windshield when buying. Don't buy haphazardly.
Be sure to choose the right aircon windshield according to the size and specifications of the air conditioner in your home. At the same time, pay attention to the choice of the best windshield to avoid inferior plastic is easy to fall off, causing injuries to family members. And the air conditioner windshield must be installed in place.
Only by installing it in place can you avoid the air conditioner wind shield from accidentally falling off and injuring your family. In summer, it is relatively hot, and the elderly and children at home turn on the air conditioner to worry about catching a cold, which is very hot. Then try the air conditioner wind deflector.
-
1. The humidifier should be installed close to the back of the air heating cooler, and its width should be equal to the width of the heating cooler, and the height should be equal to the height of the air conditioning box;
2. The specific piping method when using DC water supply and circulating water supply is shown on page 1613 of the second edition of the "Practical Heating and Air Conditioning Design Manual".
3. The mass flow rate of air through the windward side of the wet film medium should be maintained to avoid the installation of water baffles;
4. It is advisable to use demineralized water, and the selection of products with sterilization measures should be considered;
5. It should be cleaned regularly;
6. An air filter must be set up in front of the humidifier, and a manual gate valve and water filter must be installed on the water supply pipe.
-
The base frame of the humidifier should be located on the foundation, the foundation plane should be flat, and the foundation bolts should be fixed with the base. (or the base is directly welded with the embedded plate of the foundation plane) to avoid the vibration of the equipment during operation.
A quantitative feeder should be installed above the material inlet to avoid affecting the mixing effect of the equipment.
A plug-in door should be installed below the wet ash discharge port to avoid frequent opening and closing of the machine when discharging.
The water inlet of the humidifier should be equipped with a flow control valve, and the amount of water inlet can be appropriately adjusted to achieve controllable humidity of stirring under the condition of water pressure and instability.
After the on-site installation is completed, it should be checked whether there is a hard material accumulation in the tank, and if there is one, it should be removed, so as not to jam the rotating shaft during operation and damage the parts, and it is strictly forbidden to carry out the tank with 10mm hard materials during operation.
The fan blade of the main motor should be hand-plated to check whether the passive shaft is running easily and normally.
The following sequence should be followed when the humidifier is turned on and off.
-
The construction site is clean and tidy, the construction condition is basically dry work, equipped, civilized, fast and simple.
1. Pay-off and lifting the board: The baseline of the wall panel installation site is perpendicular to the bottom of the board or the bottom of the beam, so as to ensure that the installation of the wall board is straight, and a square wall board can be carried by two people.
2. Saw board: Cut arbitrarily with a hand-held machine according to the requirements, adjust the width and length of the wallboard, and reduce the loss rate of the wallboard.
3. Sizing: Use cement and medium sand (1:2) and construction glue to make a paste, first brush the concave and convex grooves of the wallboard with clean water, and then wipe the polymer mortar in the concave and convex grooves of the wallboard and the floor baseline.
4. Loading: Move the wall board with good mortar to the assembly position and stand up, up and down to the baseline position, and pry the wall board from the bottom with an iron pry to make the board close to each other.
5 In place: Put the wall panel firmly together so that the mortar is extruded from the joints to ensure that the mortar is full, and use a wooden wedge to temporarily fix it.
6. Correction: Use a straight ruler with a straightening of 2 meters to check the flatness and verticality: adjust the correction with an iron skid, and then fix it up and down with a wooden wedge and steel bar.
7 Nailing: The connection between the wall panel and the wall board must be anchored with 6 200mm steel bars obliquely 45 °.
8 fixing: After correcting both sides with 30 30mm wooden wedges, drill holes in the middle of the tenon or tongue and groove surface with a percussion drill at an angle of 45 °, and then anchor with 6 200mm steel bars.
9. Grouting : Install the calibration of the wall board with cement mortar (1:2) and then add construction glue to make a polymer slurry to fill the upper and lower joints and the joints between the boards, and pull out the wooden wedges and fill them with mortar.
10. Slotted buried pipe: If you want to bury hidden pipelines, switch boxes, etc., you can use a percussion drill or a portable chainsaw to cut the trunking for installation, and then use mortar polymer to level it after installation.
11. Install the door frame: The door frame can be directly wrapped on the wall panel with a plywood, anchored with an iron nail and the wall, and covered with a decorative board.
12 Plastering Coating: The final coating of the top layer can be done. If you paste porcelain tiles, you can directly paste the porcelain tiles on the wall board with cement slurry, or you can directly paste wallpaper, wood veneer, etc.
-
The lightweight partition board installation foundation is laid, the board and the board are in the same plane, the male groove and the mother groove are butted according to the seam, and the cement mortar is smeared.
-
The construction technology of the integrated board of external wall insulation and decoration.
1) Prepare the design plan and construction process plan of the finished board.
Design and manufacture the floor plan of the external thermal insulation decoration system of the thermal insulation composite decorative board of the building, and record it after being approved by Party A (including the confirmation of the color of the main board, the corner board and the line).
2) The construction process and construction technical requirements of Jieyang thermal insulation and decorative integrated board.
-
1. To the grassroots.
The special layered structure of the thermal insulation decorative integrated board ensures that the thermal insulation decorative board itself is firm and smooth. When the insulation decorative board is installed normally, the base layer should meet the standard plastering, no cracking, no powder, no sand, no hollowing, no peeling, smooth surface, vertical façade, vertical yin and yang angles.
2. Put the baseline.
The baseline should be bounced on the wall with ink lines, and each connecting construction surface should be bounced on the line. The baseline line is the initial construction line that is used as the starting point of construction in both vertical and horizontal directions after the construction starts, and the standard line that keeps the graphics of the four walls in relative positions unchanged. Generally, the longitudinal datum of construction should be placed on top of the building, and the transverse datum of construction should be placed at the contour line of yin and yang angles and characteristic contours.
3. Cutting. The size and quantity of the thermal insulation decorative integrated board are consistent with the typesetting, and the position and number are marked on the back of each board to ensure the accuracy of the construction. Configure special binders. Choose a suitable container, pour the adhesive mortar into the container first, then pour in water, stir while pouring, and stir well.
The agitated adhesive mortar should be used up within two hours.
4. Paste. The thermal insulation and decorative integrated board is divided into two kinds, one is the direct keel dry pendant installation, and the other is the light board, which is smaller than the overall weight of the national EPS XPS thin plastering system of on-site operation, so it only needs a special mortar to paste it directly to the wall, and it can meet the specified bonding strength requirements.
5. Anchoring. In order to completely eliminate the phenomenon of layered peeling of the thermal insulation decorative board and improve the overall safety of the thermal insulation decorative board, the anchor is used, the finishing layer is tightly fastened, and the thermal insulation decorative integrated board is firmly connected with the wall again.
6. Seam treatment.
Joints are generally sealed with polyurethane foam or silicone.
-
Generally speaking, the installation of integrated board is divided into three steps: gluing the board, anchoring, and gluing.
Specifically, in detail, the picture above:
The picture is from the official website of Baffley,**Zoom in,It's not clear to see this way.,I'm sorry.。
This refers to the construction of large walls, and there are many node practices. The specifics are not listed one by one. There is a specific node to send me a private message.
-
1) The flatness of the exterior wall civil wall engineering should meet the acceptance requirements, and the installation of the external doors and windows shall be completed and the acceptance of the relevant departments shall be qualified.
2) The thickness of the insulation and decoration integrated board should be reserved for the connection between the door and window frame and the wall, and the gaps should be filled tightly in layers to protect the doors and windows.
3) The rainwater pipe card on the exterior wall, the embedded iron parts, and the equipment through the wall pipe are installed in advance, and the installation and coordination with the thermal insulation and decoration integrated board are coordinated in advance.
4) The erection of hanging baskets and double-row external scaffolding for construction should be firm and reliable, and meet the requirements of relevant specifications and regulations. The distance between the horizontal and vertical rods of the scaffold and the wall and the corner of the wall is moderate, and the laying of the scaffold board is suitable for the installation grid.
5) The joint position of the preset concrete exterior wall panel should be handled in place in advance according to the requirements of the civil construction drawings and construction acceptance specifications.
6), the ambient temperature of the wet paste system should not be lower than 5, the construction binder in winter must take anti-freezing measures, and the dry hanging system does not make the above restrictions. If the wind force is greater than level 5, the operation shall be stopped, and the wind speed shall not be greater than 10m s during installation. Rainproof measures should be taken for construction in the rainy season.
Wet-paste integrated board construction procedure.
1) Base wall treatment: the wall should be smooth, firm, no hollowing, cracking and other phenomena. The wall surface is flat, reaching the intermediate plastering standard, and the yin and yang angles are vertical;
2) According to the design requirements, the baseline and the grid positioning line are bounced on the wall with ink lines;
3) The special anchor is pre-installed on the integrated board;
4) According to the position of the grid positioning line, drill holes in the wall and install the expansion anchor on the wall;
5) Deploy inorganic bonding mortar and paste the integrated board on the wall, and fix the plate on the wall with expansion screws.
6) Fill the caulk with foam strips, clean the seams of the board and paste masking tape;
7) Pouring silicone weather-resistant sealant;
8) Tear off the protective film and masking paper.
1. The top note (or head fragrance, head note, first fragrance) is the first information revealed by the perfume Xiaolianghuai, that is, when you come into contact with the perfume, it smells between tens of seconds and minutes, and goes straight to the ambiguous channel in the nose. The top notes are usually made up of volatile essential oils and are generally fresher, mostly floral or citrus. >>>More
If you are very familiar with C major chords, then you clip the capo clip on the 2nd fret is D major, the 4th fret is E major, and the 5th fret is F major,,, remember to play the chords in C major, and sandwich the capo clip on the 5th fret, which is F major,,, you must not use 6 lines anymore, it will ruin your ** future, please study the staff carefully, that is the only way to ** home... You first find a regular classical guitar book, learn the guitar scales while learning the staff, and compare the notes of the staff with the position of the guitar fretboard. There are many friends who learn guitar, but most of the methods are wrong, and it is a waste of time and energy. >>>More
C key fingering, the song is C or Am minor, including the main chord C, the genus chord F, the subordinate chord G, and the main chord relation minor chord AM, the genus chord relation minor chord DM, the subordinate chord relation minor key EM and so on. If you master these fingerings, you can basically accompaniment songs in C key. >>>More
Ingredients: sesame sauce, oil, cold soy sauce, rice vinegar, wei dami, chicken essence. >>>More
First of all, the first step is to adjust the seat of the car, which the coach has taught when taking the driver's license, you must adjust it to the most comfortable position, you can clearly see the situation around the car and whether you can easily step on the accelerator, brake and clutch. >>>More