The construction unit prepares the materials in the early stage, and what information the constructi

Updated on society 2024-06-02
5 answers
  1. Anonymous users2024-02-11

    The name of the construction document.

    1. Checklist of statutory construction procedures in the early stage of project construction.

    2. Project application report and approval.

    3. Feasibility study report and approval.

    4 Environmental Impact Report, Environmental Impact Report Form or Environmental Impact Registration Form 5 Annual Plan (Permission Document) for Fixed Asset Investment Projects

    6. Planning permit for construction land.

    7. Planning permit for construction projects.

    8. Approval of construction land.

    9. Approval of construction drawing design documents.

    10. Public security fire protection design review opinion.

    11 Notice of Winning Bid.

    12. Construction contract and supervision contract.

    13. Qualification documents of each responsible entity and subcontractor.

    14. Registration form for quality and safety supervision of construction projects.

    15 Construction permits for construction projects.

    Construction. 1. Application form for engineering and technical documents.

    2. Technical disclosure record.

    3. Drawing review record.

    4. Design disclosure record.

    5. Negotiation record of design change.

  2. Anonymous users2024-02-10

    Analysis of legal cancellation: 1. Qualification certificate, business license and registration number of the construction unit (copy of the elderly);

    2. National enterprise grade certificate and credit rating certificate (copy);

    3. Construction enterprise safety qualification examination and approval certificate (copy);

    4. Certificate of enterprise legal person (copy);

    5. Quality system certification;

    6. Laboratory qualification certificate provided by the construction unit (copy);

    7. Notice of winning the bid for the project budget (copy);

    8. Qualification certificate and employment certificate of project manager, chief engineer and management personnel (copy);

    9. Special operation worker's certificate (copy); Special operations include: electrical work, boiler stoker, pressure vessel operation, lifting operation, blasting operation, metal welding (gas cutting) reed bucket lifting, motor vehicle driving, motor vessel driving, marine engine operation, construction elevated, coal mine underground gas detection, etc.

    10. The self-examination procedures of the project are complete, and the construction organization design (construction plan) is targeted and has special measures (such as winter and rainy season construction) with the visa of the person in charge of each department.

    Legal basis: Article 77 of the Civil Code of the People's Republic of China A for-profit legal person shall be registered and established in accordance with law.

  3. Anonymous users2024-02-09

    The following preparations need to be made in the early stage of the construction unit:

    1. Construction enterprise qualification certificate, business license and registration number;

    2. National enterprise grade certificate and credit rating certificate;

    3. Safety qualification examination and accreditation certificate of construction enterprises;

    4. ** certificate of enterprise legal person;

    5. Quality system certification;

    6. Laboratory qualification certificate of the construction unit;

    7. Project pre-bidding document and project bid price schedule;

    8. Qualification certificate and employment certificate of project manager, chief engineer and management personnel;

    9. A copy of the examination form and the employment certificate of special types of personnel in construction projects;

    10. Review records of leveling points and coordinate points provided by the construction unit;

    11. Submit for review and approval of construction organization design, and design plan of construction organization;

    12. Report on the commencement of construction projects.

    First, the importance of the construction unit in the early stage of construction.

    The basic task of construction preparation is to establish the necessary technical and material conditions for the construction of the proposed project, and to make overall arrangements for the construction force and the construction site. Construction preparation is also an important basis for construction enterprises to do a good job in target management and implement technical and economic contracting, and construction preparation is also the fundamental guarantee for the smooth progress of civil construction and equipment installation.

    Therefore, it is of great significance to conscientiously do a good job in construction preparations, to give full play to the advantages of enterprises, to bring reasonable resources, to speed up construction, to improve the quality of projects, to reduce project costs, to increase the economic benefits of enterprises, to win the social reputation of enterprises, and to realize the modernization of enterprise management.

    Practice has proved that if we attach importance to the preparation for construction and actively create all the construction conditions for the proposed project, the construction of the project will be carried out smoothly; Anyone who does not pay attention to the construction preparation work will bring trouble and loss to the construction of the project, and even bring disaster to the construction of the project, and the consequences are unimaginable.

    2. The legal basis for building construction.

    Article 7 of the Construction Act.

    Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the state, apply to the people's construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department. Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit.

    Article 8. To apply for a construction permit, the following conditions shall be met:

    A) has gone through the approval procedures for the construction project land;

    B) in accordance with the law shall handle the construction project planning permit, has obtained the construction project planning permit;

    3) If it is necessary to demolish, the demolition progress meets the construction requirements;

    4) The construction enterprise has been determined;

    5) There are financial arrangements, construction drawings and technical information to meet the needs of the construction;

    6) Specific measures for the quality and safety of the project. Construction administrative departments shall, within seven days from the date of receipt of the application, issue a construction permit to eligible applications.

  4. Anonymous users2024-02-08

    Data clerk workflow.

    Part 1: Pre-construction information.

    1. Notice of winning the bid and construction permit.

    2. Construction contract.

    3. The supervision contract of the entrusted supervision project.

    4. Construction drawing review approval letter and potato Min construction drawing review report.

    5. Quality supervision registration.

    6. Key points of quality supervision and quality supervision work plan.

    7. Geotechnical engineering investigation report.

    8. Construction drawing review record.

    9. The construction organization is approved by the supervisor (or the owner) to set up a plan or construction plan.

    10. Commencement report.

    11. Quality management system registration form.

    12. Construction site quality management inspection records.

    13. Technical disclosure records.

    14. Measurement and positioning records.

  5. Anonymous users2024-02-07

    Legal analysis: any project from construction to completion is required to have perfect construction data and process, the specific information required includes pre-start data, quality acceptance data, experimental data, materials, products, components and other certificate information, construction process data, if necessary, should be supplemented consultation, completion data, construction project quality supervision and management archive data. Construction enterprises shall comply with the provisions of laws and regulations on environmental protection and production safety, and take measures to control and deal with the pollution and harm to the environment caused by various dust, waste gas, waste water, solid waste, noise and vibration on the construction site.

    During the construction process, construction enterprises and operators shall abide by the laws and regulations related to production safety and the safety rules and regulations of the construction industry, and shall not command or operate in violation of regulations. Workers have the right to put forward suggestions for improving the operating procedures and working conditions that affect personal health, and have the right to obtain the protective equipment required for safe production. Workers have the right to criticize, report and accuse behaviors that endanger life safety and personal health.

    Legal basis: Construction Law of the People's Republic of China

    Article 38 When preparing the construction organization design, the construction enterprise shall formulate corresponding safety technical measures according to the characteristics of the construction project; For projects that are more professional than Tongdan, special safety construction organization design should be prepared, and safety technology measures should be taken.

    Article 39 Construction enterprises shall take measures such as maintaining safety, preventing dangers, and preventing fires at the construction site; If conditions permit, the construction site shall be closed for management. If the construction site may cause damage to adjacent buildings, structures and special working environments, the construction enterprise shall take safety protection measures.

Related questions
5 answers2024-06-02

The supervision of the archival documents and the construction unit are different, they will collect their own, even if you give him a copy is useless, the archiving materials must be the original, and like the application form and the inspection form, you have reported during the construction process, he must also have it. >>>More

10 answers2024-06-02

The constructor is the technical organization and management personnel at the grassroots level. The main work content is to go deep into the construction site under the leadership of the project manager. >>>More

7 answers2024-06-02

Answer: Construction qualifications are divided into three categories: 12 general contracting qualifications, 36 professional contracting qualifications, and 1 labor service qualification. There are multiple levels for each qualification.

9 answers2024-06-02

The work of a data clerk is definitely not very easy to do at the beginning, because I don't know how to start, I only started to contact this area last year, I will tell you some of my experience, I hope to give you some help. >>>More

9 answers2024-06-02

Comment one by one, write affirmation if you need to affirm, write some improvement opinions if you need to improve, and put forward good suggestions if you need to improve. This should be commented on according to the specific situation, such as: equipment condition, personnel status, environmental status, emphasis on safety precautions, etc.