-
First of all, it is necessary to clarify the area of the decoration of the rough house: the size of the ground, the size of the wall, the size of the doors and windows, the size of the usable area of each house, and then according to these data, the number of decoration materials that need to be used, the size of the purchased furniture and the area to be reached, and finally a reasonable overall decoration plan for the design of the blank house.
After you have the overall decoration plan, it is time to consider the specific decoration. Some owners will demolish and modify the main wall before decoration, including wall demolition, wall building, shoveling wall skin, plastic steel windows, etc., and clean up the garbage in time after the demolition and modification to facilitate subsequent construction. Spell Dog Tips:
All demolition and renovation projects need to be planned by the designer, and can only be implemented without affecting the overall safety of the house and normal life in the future.
After the renovation of the house layout is completed, it is the most basic and important water and electricity layout of the house. Before making the layout of water and electricity, it is necessary to make a preliminary plan for the approximate placement and size of furniture and appliances in the house, so as to reasonably plan the number of sockets and save costs. In addition, the water and electricity engineering of the kitchen and bathroom is the top priority, and it is necessary to measure the basic good size and precise placement of cabinets, range hoods, electrical appliances, lamps, basins, bathtubs, washing machines, switches, etc.
After the completion of the water and electricity layout, it is necessary to start the basic decoration of the house, there are many steps of basic decoration, and the time point of entry is different, so it is necessary to plan out the order of the decoration workers in advance. Generally speaking, the basic principle of which dirty is followed in the basic decoration is which is the first field. So the approximate order is:
First of all, the mason master does the tile paving of the ground and wall; Then there is the carpentry to design the furniture according to the size; Finally, the painters come in. Spell dog warm reminder: If the furniture is customized and purchased according to the size of the mall, the carpentry step can be basically omitted.
After the completion of the house foundation decoration project, it is the final installation of the house doors and windows, and the cabinets need to be installed together in this process. Installing cabinets is a coordinated project, and it is best to make an appointment in advance for a range hood, stove and sink so that they can be installed on the same day. Spell dog warm reminder:
The installation of doors and windows is more complicated, and there are many tools used, which are easy to bump, so you should be careful.
Rough house decoration is a laborious thing, most people will choose to hand over to the whole decoration company to do, I hope the content of this article can help you!
-
The steps and methods of water and electricity decoration of the blank room are as follows:
1. Circuit installation.
1. Before the installation of hydropower, there must be strong and weak electricity, and the design and construction drawings of water supply and drainage.
2. It is forbidden to set the wires without any protection directly in the wall, in the floor, under the floor or on the ceiling.
3. Lines with different voltages, different circuits, and different signals are strictly forbidden to wear in the same pipe.
4. The installation of lamps and lanterns should be completed after the paint construction, and the switchgear should be installed on the phase line, otherwise after the switch is off, the lights will still be charged and the electrical equipment will be electrified, which is easy to cause electric shock. If the luminaire uses a screw head, the reed tongue of the screw head should be connected to the control phase wire.
5. Remember not to connect the wire in the conduit, that is, if the length of the wire is not enough to be wired, the connector of the wire cannot be in the conduit, and it should generally be wired in the junction box such as switches, sockets, lamp head boxes, etc.
6. The power system should take appropriate protective measures, grounding protection and zero protection, generally take grounding protection, and it is strictly forbidden to use two protection measures at the same time.
7. The interface of the line should be smooth, the connecting plate should be firm, and it is strictly forbidden to block the wire to block the conduit.
Second, the installation of waterways.
1. The hot water faucet in the cold and hot water faucet should be installed on the left side. The electric water heater should have a grounding protection device, which can remove the air in the bile when it is first used, and it can be energized after being filled with water.
2. The horizontal pipe of the drainage pipe should have a certain slope, and the socket connection should be tight to ensure that there is no leakage. Fixed pipe brackets, elevator spacing reasonable, firm.
3. The installation of the waterway must be firm and accurate, and the installation position of toilet appliances must also be accurate and firm.
The villa master provides you with local building policies, building drawings, and villa design drawings;
Villa appearance renderings service, thousands of popular drawings for you to choose.
Villa Master.
-
How to decorate the rough house? What are the steps? Before decorating the rough house, you need to choose a suitable decoration company.
It doesn't mean that you have to choose a well-known brand, you only need to have a good reputation and good service. At this time, it is generally necessary to shop around, and clearly give the best decoration company with good service in place. Carry out the design plan for the decoration of the house, including the wardrobe, household appliances, switching power supply parts, each space planning of the house, and the interior decoration style in the room, how to complete the construction of the project in an orderly manner, and prevent temporary rectification and endanger the progress of the project.
Carry out the arrangement of water pipes and cables. Because the water pipes and cables are buried deep in the walls and pavement, it is necessary to choose the best water and wire pipes, and arrange them horizontally, so that the quality of the replaceable maintenance pipe fittings is easier to solve once there is a problem in the middle and later stages. Then, it is the entry of bricklayers and carpenters, and the actual construction time depends on the difference in processing technology and location, and the order of bricklayers and carpenters is determined according to the actual situation.
Because the moisture-proof and base layer are carried out in a cross-type manner, the waterproof coating should be entered in time.
Paint walls, suspended ceilings and ceilings. Note that before purchasing paint, it is necessary to accurately measure the approximate area that must be painted, and then select the total amount of paint to prevent relatively large consumption. After the above work is done, it is necessary to clean the room and clean up the garbage.
After the room is cleaned, you can carry out the assembly of each spare part, lighting fixture, panel switch, wardrobe, etc., pay attention, it is best not to damage the opposite side and wall pavement to avoid endangering the application.
Then there is the installation of water and electricity, which is also a crucial stage. After all, it is a decoration concealment project, if not dealt with well, it may lead to the burial of safety risks in the middle and later stages, and endanger the settlement. After the hydropower project is completed, the waterproof project should be done to avoid the problem of water seepage in the future, which will cause the same to the living home.
If you prepare for the installation of floor heating or air conditioning in advance, you need to assemble it after installing it in a moisture-proof manner.
-
First of all, it is necessary to measure the rough house, and then gradually decorate it. If you don't go, you can change the door first, then change the water and electricity, then lay the floor tiles, then lay the wall tiles, and then customize the cabinet and install the furniture.
-
When decorating the rough house, you should first make a reasonable design according to your overall space, make a decoration budget, and then carry out water and electricity renovation and the laying of walls and floors.
-
This requires finding a suitable renovation company first, then the work of water pipes and wires, the work of bricklayers and carpenters, and finally the design of the interior decoration.
-
Many homeowners and friends receive a rough house after receiving the house, so there will be more steps for renovation and there can be more room for conversion. So how do we decorate a rough house? Something has been written for you and a general approach to decorating has been introduced.
1. How to decorate the walls of a rough house.
1. Acceptance of the wall.
The wall is generally a rough house with cement mortar on the wall, and we should carry out a decoration on the wall to carefully check and see whether the cement on the wall is firm and flat. If not, you need to change it in time.
2. Finished product protection.
Other items should be thoroughly protected until the wall is renovated. When decorating walls, it should be caused by dust or paint, putty, etc. from other places. Wait, once it is turned on, it will add unnecessary hassle to the passengers.
3。Preparation before scraping putty.
Before putty putty, it should be high to ensure that the walls are strong, firm and level. If you notice unevenness, you need to use a tool. Clean up in a timely manner.
If the wall is uneven, it can be filled with cement to make the wall appear a kind of soil that does not float, floating and sinking. On the wall rollers, once the concrete interface is applied, roll as evenly as possible. After drying, you can apply putty from the wall.
4. Putty. After the wall acceptance is completed, the step of scraping putty on the wall must be carried out. Usually, putty can only be used twice, so it can make the background color of the wall very high. Uniform.
5. Brush. There are two main ways of brushing. The first one is the primer.
After polishing the walls, the dust on the walls is removed, and then a brush can be applied. The paint only needs to be brushed once, but it must be very even. Once it is completely dry, you can move on to the next step.
Another way is to brush the topcoat. The topcoat needs to be applied twice at a time. About 2-4 hours.
After the second coat is completed, wait 1-2 days to dry thoroughly. Before the paint dries completely, be sure to take care of waterproofing, drought, sun protection, and to prevent the film from appearing. 。
Second, how to decorate the walls of a rough house.
The coatings commonly used in our lives mainly include latex paints, water-soluble paints and color paints. The effects of these three methods are different. You can buy it according to your preference.
Veneer such as marble slab, granite slab, etc., but the purchase ** is higher, generally used for exterior wall enamel finish, indoor enamel finish is especially rarely used for home decoration. Wall upholstery fabrics are currently the most widely used wall materials in China. Wall decoration is popular among users for its diverse patterns, rich colors, imitation of traditional materials, and special effects of soft and unique soft decoration.
You can get it for free
-
1. Design, bai is what kind of du do you want? How much are you going to spend? zhi can find a decoration company. dao
2, construction, the first to go to the property management for the construction of the permit procedures, and then please the construction unit to enter, here is a lot of fame, some contractors, some only contractors, some only say the total price, after the start of construction and then add, make it difficult for you halfway, some cut corners, can not be prevented, it is very important to find a reputable company, too cheap often unreliable.
3. Acceptance and settlement, in fact, the acceptance should be carried out in the construction, check whether each process is standardized, and it is best to have an expert friend to help.
-
If you plan to find a decoration company, don't think about the process, because they will help you arrange it, if you want to decorate yourself, find different workers at different stages, you need to arrange the process yourself, and the materials you need to buy. If it's the second option, I can tell you the process.
-
I don't do decoration, you still find a decoration company, save trouble.
-
For the decoration of the house, I think every family attaches great importance to it. Especially in the rough interior decoration process, when the designer designs the drawings, it is difficult for the owner to participate in the imagination of the decoration concept, and can only follow the designer's concept to plan. New homeowners should take some time to plan the renovation steps to avoid the hassle of a later renovation.
Rough renovation steps and processes, project submission, designer, decorator and owner are present for the project planning process before the house is renovated. The simple point is to customize the decoration work for the decorators. It is mainly to explain the needs of house decoration and craftsmanship to users, but designers often focus on design in some special places, such as background wall design.
The rough decoration steps and processes are also that the owner must check whether there are problems with the contract.
When the house begins, the entire space must simply be chiseled and cabled.
Hydraulic engineering, the construction of hydropower projects depends on the craftsmanship of the engineering company before the decoration. Attention should be paid to the later decoration.
Arrangement of ice hot water pipes, right principles for laying hot and cold pipes. If the floor heating is used, you can connect the pressure test pump to check whether the pipeline is leaking and other problems, otherwise there will be problems in the later stage, which is very troublesome.
In the circuit pipeline, we must pay attention to safety. This phrase applies to some self-modifying owners. After the configuration is laid, the power cord should be of better quality.
The hydropower project is followed by bricks, which is the biggest test of experience and craftsmanship for the construction master. For example, the cutting process of wall and floor tiles, laid before the wet and dry laying process, the level of the wall, such as floor tiles, such a process is not difficult, emphasized"Okay"Word. The real focus is on things like tile gaps, uneven tile walls, and the other is too big, and any problems that arise will affect the aesthetics.
The carpenter enters in front of the painter. The main function was to design a sturdy lining on the walls to facilitate the painter's construction. Solid walls or design walls for ceilings, as well as carpentry may require early entry for unloading.
From a craft point of view, these are mainly rust- or moisture-resistant woods, timber or timber building materials that allow for long-term use in the home.
Blank decoration steps and processes, the painting process of wall paint is usually placed last. Painting the walls first can easily cause indoor formaldehyde, which can pose a health risk to decorators.
The above are the suggestions for the steps and processes of the rough decoration of the new house.
The steps and methods of water and electricity decoration of the blank room are as follows: >>>More
The renovation process consists of three stages. At first, it is the design stage, which requires the main decoration designer to communicate to understand the style that the owner likes, and integrate the popular trends into it, and determine the design plan before starting to screen the decoration company. >>>More
The decoration cost of the rough house is 50,000 yuan, and whether it can be decorated well mainly depends on the standards and requirements of the decoration. Generally speaking, the decoration cost of 50,000 yuan can meet the basic decoration needs to a certain extent, but it may not be able to achieve a high standard of decoration effect. >>>More
Steps to clean a new house:
1. Clean the bathroom first, because this place may be the first thing you need when cleaning the room; Then clean the kitchen, because it is a "big water user", so it is better to clean it first, and this is related to health, so it must be thoroughly cleaned, 360 degrees without dead ends. >>>More
** I haven't heard of it here in Shenyang.