How to make the construction schedule simple and practical?

Updated on society 2024-06-22
5 answers
  1. Anonymous users2024-02-12

    1. Engineering quantity and list: first of all, the engineering quantity, is to divide the project you design into several construction units (processes) according to the construction sequence or construction nature, and calculate the materials and labor required for each construction unit (process), which is the so-called engineering quantity, listed into a schedule, that is, the engineering scale, and the total engineering quantity of each process is the total engineering quantity of the project. The list is to apply the engineering quantity of each process to the project cost quota promulgated by the local cost department (convert the physical engineering quantity into cost), such as material costs, labor costs, other costs, etc., listed into a detailed list, that is, the list (cost), the cost of each process is summed up, is the total cost of the project.

    2. Construction schedule: also known as the Gantt diagram, using the right-angle coordinate system (the origin is taken in the lower left corner), the longitudinal coordinates represent the process, the horizontal coordinates represent the time (date), the process is arranged from top to bottom, and each process is drawn a horizontal line from the start date to the end date of the process, and a horizontal line is formed after all the processes are completed, and the total number of work, what time should be done which work is clear at a glance, and this Gantt chart is also called the construction schedule.

  2. Anonymous users2024-02-11

    There are two books on the bill of quantities. You refer to the 09 list and the 08 quota. That's it.

    Have you seen the construction progress network diagram and Gantt chart? It's for you to do one of these two things, and choose for yourself.

  3. Anonymous users2024-02-10

    Here's how to make a construction schedule in a word document or excel:

    1. Open Excel, fill in each cell in ** by week, and then insert it every four weeks for one month.

    2. Then switch to column A and enter the text in column A according to the specific build process.

    3. Click the "Insert" button at the top of the interface, and then click the rectangle under "Shape".

    4. Then, use the mouse to drag the method in the corresponding process.

    Draw a rectangle within the desired time.

    5. Then adjust the position and size of the rectangle.

  4. Anonymous users2024-02-09

    The <> construction schedule is a table of time and resources required during the construction of the project in detail, which plays an important role in controlling the construction schedule, optimizing the allocation of resources and coordinating the various construction units. Construction engineering refers to the civil engineering based on the use of reinforced concrete structure, in accordance with certain design and process requirements, from the foundation to the roof to the wheel rock and interior decoration of the whole process, which involves the construction of the project including foundation engineering, main structure engineering, decoration engineering and other stages. In the process of construction engineering, the establishment and update of the schedule is very important, which can effectively grasp the construction progress, reduce the delay of the construction period, and ensure the quality and safety of the project.

  5. Anonymous users2024-02-08

    The construction schedule of the project indicates the method of dismantling:

    1.The Gantt chart method (also known as the Gantt chart method), leaking Yuzen, it makes up for the defects of the Gantt chart, so that the construction management personnel can concentrate on the key, and in the implementation of the situation, the impact of changes in the situation on the construction period and the future work, so as to take countermeasures in time.

    2.Engineering Network Plan.

    Dual-coded network plan.

    Single-coded network plan.

    Dual-coded time-scale network plan.

    Single-code lap network plan.

Related questions
5 answers2024-06-22

If you don't know how to prepare a construction plan at all, then the above ** is completely useless to you. Learn how to prepare a construction plan first. This is not something that can be explained in a sentence or two.

13 answers2024-06-22

*Project Department. The progress of your project is lagging behind. The construction was not completed according to the construction schedule. You are now asked to increase it. Person. Machine. The input of materials ensures the progress.

4 answers2024-06-22

Steps for the preparation of the general schedule of the construction of the construction profession: >>>More

5 answers2024-06-22

The name of the construction document.

1. Checklist of statutory construction procedures in the early stage of project construction. >>>More

3 answers2024-06-22

The maximum score of the summary table is 100 points. The full score of each sub-checklist in the summary table should be: 10 points for safety management, 20 points for civilized construction, 10 points for scaffolding, 10 points for foundation pit support and formwork engineering, 10 points for "three treasures" and "four mouths" protection, 10 points for construction electricity for source water, 10 points for material hoist and external elevator, 10 points for tower cranes, 5 points for lifting and hoisting and 5 points for construction equipment. >>>More