*Project Department. The progress of your project is lagging behind. The construction was not completed according to the construction schedule. You are now asked to increase it. Person. Machine. The input of materials ensures the progress.
-
The reference for the specific content should be:2. The specific reasons for the lag in the on-site construction progress and the severity of the circumstances.
3. The requirements of the owner (the supervision is to provide services for the owner on the basis of laws and norms).
Originally, supervision should be consulting or engaged in project management, but due to some deep reasons, supervision has been alienated into construction supervision, supervision is an important control industry.
Construction project supervision (hereinafter referred to as engineering supervision) unit is one of the main bodies of the construction market, it is a highly intelligent paid technical service, China's engineering supervision belongs to the international owner project management category. Internationally these services are classified as engineering consultancy (engineering consultancy) services.
The word "supervision" can be understood as a noun or as a verb referring to a specific act. The corresponding noun in English is supervision, and the verb is supervise. It can be seen that supervision is a foreign combination of words, which has no clear definition in Chinese dictionaries, and how to fully and accurately explain and understand its meaning needs to be further studied.
China's construction supervision system is introduced from abroad, among them"Supervision"The term is borrowed from the appellation of countries such as Japan. Japan's Building Standards Act and the Architect Law both clearly stipulate the construction supervision system, where private owners must entrust qualified architects (i.e., the so-called architects) to serve as project supervisors, otherwise the project shall not be carried out.
-
According to the contract and the construction schedule, the construction progress of your construction site is slow, the various types of work are not coordinated, the construction personnel allocation of each team is unreasonable, the construction unit organizes forces as soon as possible, and increases the required construction personnel as soon as possible according to the needs of each type of work, in order to ensure the smooth completion and delivery of the project.
-
According to the contract and the construction schedule, the construction progress of your construction site is slow, the various types of work are not coordinated, the construction personnel allocation is unreasonable, and the materials required for the construction can not be arrived in time, the construction unit should organize forces as soon as possible, according to the needs of each type of work, reasonably arrange the construction work content, in order to ensure the smooth completion of the project, as soon as possible to increase the required construction personnel, machinery, and raw materials for all parties.
-
Then clarify which types of jobs have fewer people and how many people need to be added at least.
-
If the data lags behind or is out of sync with the construction, it is necessary to report to the supervision department for verification as soon as possible. Send a supervision notice to the construction unit (copy to Party A, collapse the draft to urge measures to speed up the progress, catch up with the lagging construction period, there is no need to give Party A a contact sheet.)
Due to organizational management.
If the progress is lagging due to ineffective, insufficient resource investment, rectification of quality and safety issues, etc., the construction period shall not be visaged, and the construction unit shall take effective measures to catch up with the lagging progress and bear its own costs. According to the contract, the reasons of the non-construction unit (including but not limited to land and housing expropriation, three links and one leveling) are not the reasons of the construction unit (including but not limited to land and housing expropriation,
pipeline relocation, planning adjustment, owner investment, etc.) cause the progress to lag, should be completed within 1 month of the completion of the visa.
-
The construction supervision notice is written in the following format:
To: **Contractor).
Subject matter: Notice on requiring your project department to take all measures to solve the serious delay in progress.
Content: According to the requirements of the contract signed between your project department and the Bureau of Land and Resources, the contract period has reached so far, but your project department has only completed 60% (about 60%) of the total project volume, and the construction period is seriously lagging behind. In order not to have a greater impact on the Bureau of Land and Resources, and to complete the project as soon as possible, the project department is now required to do the following work:
1. Prepare a feasible adjusted construction schedule, submit it to my supervision project department for approval, and then implement it in strict accordance with the approval plan.
2. Increase manpower, material and financial resources, and tap all available resources to ensure that the project is completed as soon as possible.
3. The division of labor is clear, the responsibility is assigned to the person, the construction progress is regularly reported [every day (week)], the actual progress is checked and proofread on a regular basis, and the deviation is dealt with in a timely manner.
4. Solve the problem of nest work and sabotage in the construction of each process, and make reasonable use of human, material and financial resources as much as possible.
The above points require your project department to report to me as soon as possible to supervise the project department, and implement and implement them in place.
Notice is hereby given. Copying the newspaper: (the owner or other superior is in charge of the starvation unit).
A supervision company):
Chief Engineer :
Date. <>
-
The information of the construction unit is always lagging behind in the inspection. How should I write a contact form as a supervisor?
If the data lags behind or the data is not synchronized with the construction, it needs to be reported to the supervision department for verification as soon as possible. Send a supervision notice to the construction unit (copy to Party A), supervise and take measures to speed up the progress, and catch up with the lagging construction period, there is no need to give Party A a contact sheet. If the progress is lagging due to poor organization and management, insufficient resource investment, rectification of quality and safety issues and other reasons of the construction unit, the construction period shall not regret this visa, and the construction unit shall take effective measures to catch up with the lagging progress and bear its own costs.
According to the contract, if the progress is delayed due to reasons not attributable to the construction unit (including but not limited to Hu Xun's land and housing expropriation, three links and one leveling, pipeline relocation, planning adjustment, investment promotion by former owners, etc.), the construction visa shall be completed within 1 month.
-
Summary. XX construction unit your unit to undertake the construction of the XX project XX construction progress has been seriously lagging behind, has seriously affected the next step of the process, the supervision engineer repeatedly in the form of oral instructions and contact sheets to instruct your unit to increase the construction personnel, project management personnel and advance organization of materials into the site. So far, manpower, machine and material have not been able to meet the needs of the project schedule.
Now according to the spirit of the xx document on your unit to punish xx yuan, your unit must be in xx time will lag the project adjustment plan submitted to the supervision and Party A for approval, according to the approved plan to adjust people, machines, materials.
The information of the construction unit is always lagging behind in the inspection. How should I write a contact form as a supervisor?
The construction progress of the xx project undertaken by the xx construction unit has seriously lagged behind, which has seriously affected the next step of the process, and the supervising engineer has repeatedly instructed your unit to increase the number of constructors in the form of oral instructions and contact sheets. Now according to the spirit of the xx document on your unit to punish xx yuan, Zhaomo your unit must be in the xx time will lag the project adjustment plan submitted to the supervision and Party A for approval, according to the approved plan to adjust people, machines, materials.
The materials of the construction unit have entered the site, but the information is always lagging behind the review, in this case, how to write the supervision notice or contact sheet.
XX construction unit your unit to undertake the construction of the XX project XX construction progress has been seriously lagging behind, has seriously affected the next step of the process, the supervision engineer repeatedly in the form of oral instructions and contact sheets to instruct your unit to increase the construction personnel, limb grinding management personnel and organize materials in advance. So far, manpower, machine and material have not been able to meet the needs of the project schedule. Now according to the xx document Jingli guess the god of your unit to punish the penalty of xx yuan, your unit will be in the xx time will lag the project adjustment plan submitted to the supervision and Party A for approval, according to the approved plan to adjust people, machines, materials.
-
According to the requirements of the on-site construction schedule, your company's information is too far from the actual progress, and your company is required to report according to the actual situation of the project. Engineering information, otherwise our company will be regarded as having problems with the quality of on-site construction and will not be signed
In fact, this regular supervisor will come out and say that it is okay, and the general information will not keep up with the progress
-
According to the actual writing, the data lags behind the inspection, and it is impossible to confirm whether it is qualified or not.
-
Technical information and self-inspection data must be provided before the start of each construction link at the weekly meeting or notice, otherwise it will not be accepted.
-
Do you bill. Or verbally.
If you don't know how to prepare a construction plan at all, then the above ** is completely useless to you. Learn how to prepare a construction plan first. This is not something that can be explained in a sentence or two.
The supervision of the archival documents and the construction unit are different, they will collect their own, even if you give him a copy is useless, the archiving materials must be the original, and like the application form and the inspection form, you have reported during the construction process, he must also have it. >>>More
The constructor is the technical organization and management personnel at the grassroots level. The main work content is to go deep into the construction site under the leadership of the project manager. >>>More
Steps for the preparation of the general schedule of the construction of the construction profession: >>>More
Labor companies. There are 4 differences between the constructor and the constructor of the construction unit: >>>More