    Now the meter "failure" is just your suspicion (even if it is possible), but there is no verification, it is all suspicion. It cannot be used as a basis for under-paying meters. Because the power supply bureau can also say that you are using more this month than before.

    For this reason, China's law "Power Supply Business Rules" has special provisions on this: Article 79 Power supply enterprises must verify and rotate the charging energy meters according to the prescribed period, and conduct irregular inspections of the charging energy meters. When a measurement abnormality is discovered, the cause should be identified.

    If the user believes that the charging meter installed by the power supply enterprise is not on time, it has the right to submit an application for verification to the power supply enterprise, and after the user pays the meter inspection fee, the power supply enterprise shall inspect it within seven days and notify the user of the inspection results.

    If the error of the billing energy meter is within the allowable range, the meter inspection fee will not be refunded; If the error of the billing energy meter exceeds the allowable range, in addition to the refund of the meter inspection fee, the electricity fee shall be refunded in accordance with the provisions of Article 80 of these Rules. If the user has any objection to the inspection results, he can apply for verification to the superior measurement and verification agency of the power supply enterprise. During the period of applying for meter inspection, the electricity fee should still be paid on time, and the electricity fee will be refunded after the meter inspection result is confirmed.

    Please note that the law stipulates that "during the application period, the electricity bill shall still be paid on time, and the electricity bill shall be refunded after the meter inspection result is confirmed." That is, your suspicion must be paid first without being recognized by law. Otherwise, the payment will be treated as arrears.

  2. Anonymous users2024-02-11

    It is paid according to the average of the previous months or the highest month of the same quarter of the previous year.

  3. Anonymous users2024-02-10

    You complain about him. Complain a few more times and he won't say that. Up to the average electricity consumption is charged. If it is not caused by you, you have the right to appeal.

  4. Anonymous users2024-02-09

    1. In the case that there is no increase in household appliances, it should be paid according to the corresponding month in previous years 2 can call the electricity complaint consultation **95598, and it can be solved by asking 3 The power department said that according to their method of payment, there should be no legal basis, at least the two sides negotiate to solve, even if they finally pay according to what they say, he has to let us see the documents stipulated in the electricity law in terms of meter failure, so that we can pay the electricity bill and pay it clearly.

  5. Anonymous users2024-02-08

    Why do you use 9 current transformers for three meters? Three is enough. It depends on your installation, and the meter where the current transformer is installed generally calculates the electricity in this way

    Take this as a column, and the others are counted as follows:

    1. If the current ratio of the current transformer is 300 5=60, and the current ratio of the other current is calculated according to the current ratio marked by the transformer;

    2. You subtract the original reading of the meter from the reading of the meter and multiply it by 60, which is the electricity consumption of the circuit during this time. Each item is calculated according to this calculation, and the values add up to the total electricity consumption.

  6. Anonymous users2024-02-07

    Three new meters and 9 current transformers were newly installed on the construction site: then the electricity consumption of the construction site is measured separately in three parts. Each meter is a direct reading. The actual electricity consumption of each three-phase meter is calculated as follows:

    The magnification of the current transformer = the primary current of the current transformer The secondary current of the current transformer.

    Electricity consumption of the meter = the number of meter readings before (last) meter readings and the rate of the current transformer.

    For example, the current transformer in Table 1 is 300 5, the last meter reading is 0, and the meter reading is 150kwh; What is the actual electricity consumption in Table 1?

    Table 1 of the current transformer rate = 300 5 = 60

    Table 1 Actual electricity consumption = 150 0 60 = 9000 kWh (kWh, the unit has been abolished).

    The electricity consumption of the other two meters can be calculated as an example.

  7. Anonymous users2024-02-06

    300 divided by 5 = 60 One degree on the meter is actually 60 degrees,,600 5 is the same algorithm,No matter how much current ratio,,The degree on the meter is how many degrees. Got it?

  8. Anonymous users2024-02-05

    The new meter reading 1718 is used as the starting data, after the use of electricity, the data will change, the changed number minus the starting number, is the number of electricity used in the month.

    Have fun!

  9. Anonymous users2024-02-04

    If the indicator light is on, it means that it is working properly. The new watch is digital, and you don't need to look at whether it is turned or not.

    This is the indicator of the time-of-use meter, the valley represents the number of electricity consumption during the low peak period such as the night, and the peak is the electricity consumption during the day, and the electricity price is different.

  10. Anonymous users2024-02-03

    According to the power of electrical appliances, the monthly electricity consumption is estimated to be about 180 kWh, and the fan operation degree is about 180 kWh.

    The degree of operation of the computers.

    For induction cooker, it is calculated as 1 degree.

    30 Electricity used: (kWh.)

    Estimate meter issues.

  11. Anonymous users2024-02-02

    There are several situations that lead to the wrong calculation of electricity bills, the meter fails, you can apply for the measurement, the wrong meter is read, the meter reader sometimes wears a crown, and the power line leaks seriously, adding additional electricity.

  12. Anonymous users2024-02-01

    There are generally several reasons for errors in the calculation of electricity bills:

    Meter reading errors: wrong copy, missing copy, estimated copy, etc.;

    Failure of the energy meter;

    The energy meter is incorrectly wired;

    Billing file record error: The billing price and metering multiplier are recorded incorrectly.

  13. Anonymous users2024-01-31

    Meter reading errors: including over-copying, under-copying, wrong copying, missing copying, estimating copying, etc.

    Energy meter failure: energy meter hardware failure, energy meter software failure, natural damage, etc.

    Miswired: The incorrect cable is connected to the meter.

    File errors: electricity price, multiplier, etc.

    Breach of contract, theft of electricity.

Related questions
35 answers2024-06-29

In order to avoid the subsequent impact on your electricity consumption and billing, please reflect to the owner of the meter in a timely manner, if you belong to the electricity customer of Guangdong Power Grid, please call the 24-hour power supply service **95598, and the power supply company will arrange staff to follow up. >>>More

5 answers2024-06-29

If you have an abnormal reaction to a type of vaccine, you can get up to 30,000 yuan of insurance compensation. >>>More

13 answers2024-06-29

At present, the maximum current of the electric energy meter design is 100A, obviously the current of 300A, there is no direct access to the meter option (the directly connected electric energy meter is called a direct electric energy meter), so it must be through the current transformer to change the specific current. >>>More

5 answers2024-06-29

The main boot sector of the hard disk is the most sensitive one in the hard disk, in which the main boot program is a part of it, this program is mainly used to detect the correctness of the hard disk partition, and determine the active partition, responsible for handing over the boot power to the active partition of the DOS or other operating system. If this section of the program is corrupted, it will not be able to boot from the hard disk, but the hard disk can be read and written from the soft or optical area. The way to fix this fault is relatively simple, using a higher version of DOS fdisk is the most convenient, when running with parameter MBR, it will directly replace (rewrite) the main boot program of the hard disk. >>>More

25 answers2024-06-29

The meter box is broken, and the power supply station has a new meter box and charges 60 yuan, which is very reasonable, because the meter box costs money, and there is nothing wrong with the power supply station charging fees.