-
Take your time. Xiao Wang bought 1000 shares of a company at ** price (** at the time of closing) at ** price (** at closing) per share last Friday, and in the next week's trading days, Xiao Wang wrote down the rise and fall of the ** daily **** compared to the previous day: (unit:
yuan) week. One.
Two. Three. Four. Five.
Change per share (RMB).
According to the above table questions:
How much is it per share on Tuesday?
What is the highest and lowest price of the week?
It is known that both **** and sell ** need to pay a transaction fee of 5/1000 of the transaction amount. If Xiao Wang sells all of them at **price** this Friday, what will be his profit?
Solution: (1) The ** price on Tuesday is 25 2 yuan shares) 2) **The most ** is 25 2 yuan shares).
**The lowest price is $25 2 shares).
3) Xiao Wang's income is: 27 1000 (1 5) 25 1000 (1 5).
1740 (yuan).
Xiao Wang's income this time is 1740 yuan.
-
1.According to the water condition data, the probability of flat water conditions in a certain place during the flood season is the general probability of high water conditions.
rate, the probability of a flood is . A construction site located on the riverside has drawn up three disposal plans for its large-scale construction equipment:
1) If it is shipped away, you need to pay 150,000 yuan for freight.
2) For dam protection, a dam repair fee of 50,000 yuan is required.
3) No precautions, no expenditure.
If option (1) is adopted, no loss will be suffered regardless of any water condition; If scheme (2) is adopted, only when a flood occurs, the equipment will be lost due to the collapse of the embankment; If scheme (3) is adopted, then no loss will be suffered when there is a flat water level, 2 million yuan will be lost due to the loss of part of the equipment when the high water level occurs, and 4 million yuan will be lost when the equipment is lost in the event of a flood. Based on the above conditions, the best decision-making scheme is selected.
Solution: We use mathematical expectations to judge the merits of the solution:
Ship away -15
No flooding -5
A-15 Dam repair B
Flood occurred -405
Flat water 0c high water -200
Flood -400
e(a)=-15
e(b)= 25
e(c)=0×
Therefore, -e(a)< e(b)< e(c), so that option A is the best decision-making option.
-
The types of mathematical modeling questions can be divided into the following categories:
Optimization problem: Jujube requires the design of an optimal scheme to make a certain index of guessing the bridge reach the maximum or minimum value, such as minimizing costs and maximizing profits.
Mathematical model construction questions: It is required to build a mathematical model based on practical problems, including determining variables, relationships, constraints, etc.
Stochastic Process Modeling Topics: Modeling and analysis of systems with randomness, such as Monte Carlo simulations, Markov chains, etc.
Graph theory problems: Graph theory methods are required to study problems, such as the shortest path and the smallest spanning tree.
Calculus problems: Requires the application of calculus principles to solve problems, such as extreme values, curve fitting, etc.
Linear algebra problems: Requires the application of linear algebra knowledge to solve problems, such as matrix inversion, matrix factorization, etc.
-
a.Mathematical classification of the model (what type it belongs to) bModeling ideas (ideas) c
Algorithmic ideas (solution ideas).
d.Modeling characteristics (model advantages, modeling ideas or methods, algorithm characteristics, result testing, sensitivity analysis, models.
-
Modeling is a process of solving problems, your model is the mathematical method of solving problems, if you are participating in the competition, it is recommended to see more excellent**, coordinate the division of labor of three people, and do more exercises.
A township in Guilin City has a total of 2,000 acres of arable land, including 400 acres of sandy land, 600 acres of clay land, and 1,000 acres of neutral land. The second category is vegetables; The third category is cash crops, represented by the local specialty - honeysuckle. >>>More
This model is actually the maximum integer value of the side length of the small box when calculating the side length of the square of the base plate. >>>More
An = three-quarters ab, bc = half ab, mn = one-half ab, so the result is three-quarters.
"Mathematics Diary" is to record your understanding, evaluation and opinions on the daily mathematics teaching content in the form of a diary, including your real mentality and thoughts in mathematics learning. Take note of the math problems you encountered today. >>>More
Sandwich discussion, this is the best, the general batch is also based on this, especially the discussion to write brilliantly!