What is the general quotation for new house decoration construction? I ll find out who recommended a

Updated on home 2024-06-29
8 answers
  1. Anonymous users2024-02-12

    First of all, look at which city is the decoration, the decoration is actually quite large! Some friends who have renovated should know that decoration is actually a thing with no lower limit and no upper limit, and it may only take tens of thousands of yuan to install a house by itself, and the decoration company ** from 100,000 to 100,000, 200,000, or even higher!

    In different regions, there will be certain differences, which are related to local labor costs, decoration company costs, material brand grades, process complexity and costs! Therefore, the specific decoration budget needs to be combined with the local market situation, combined with the owner's family economic situation, living habits, etc.

    Therefore, for the specific decoration budget, you may wish to find a local more recognized brand decoration company for consultation!

    Secondly. Information resources available when choosing a renovation company:

    1. Relatives, friends, colleagues: those who have been renovated or are more knowledgeable about decoration are your main contact objects, try to let them introduce you to some good companies they know.

    2. Radio, television, newspapers: from word of mouth, company scale, company qualifications, etc.

    In one is to check the company's qualifications and strength, look at the construction site model house, look at some of the designer's past cases and award certificates, etc., through this series of you can have a rough bottom, according to these and then compare and compare a few more will basically understand.

  2. Anonymous users2024-02-11

    There is a gap between large companies and small companies, the whole package is completely different from the half package, the furniture is not the same whether to buy or let the decoration company play, one sentence or two sentences are not clear, you go to the local area to understand, it is very important to find a reliable one, whether the construction quality and after-sales service are guaranteed, some decoration companies are guerrilla combinations, and some are changing their names every year to advertise, ask a few more, and shop around without loss.

  3. Anonymous users2024-02-10

    Home decoration** varies depending on factors such as region, area, design style, materials and construction team, and it is not easy to ask how much money you need. However, the price should be listed according to the local market price of the renovation.

    The specific decoration of the house can be calculated here, just enter the area + city, and calculate the decoration in 3 seconds**: [Click here, talk about the free decoration**].

    There are many factors to consider when it comes to getting an accurate home decoration, such as the cost of decoration materials, labor costs, design style, floor area, and the decoration company you choose. When choosing the right decoration company, it is recommended that you first refer to the local decoration and repair market**and**standard research. You can determine the recognition of the strength and qualifications of the renovation company by looking at its historical history, transaction volume and reputation.

    At the same time, it is best to consult with the designer to understand whether the design scheme meets your own taste, so as to promote more rationality in choosing decoration details.

    If you want to know the complete home renovation in a certain area**, we recommend that you look for multiple renovation companies, obtain multiple renovation plans, and determine the most suitable renovation company based on comprehensive considerations, design and services.

    To sum up, house decoration** is affected by a variety of factors and needs to be considered according to the region, area, design style, budget and decoration company. When assessing, be sure to research the local decoration market, choose a decoration company with a good service reputation, and negotiate and clarify each cost to ensure that your actual decoration budget meets expectations.

  4. Anonymous users2024-02-09

    Hello pro-decoration house all-inclusive** generally in 800-1600 square meters, but also divided into ordinary decoration, medium decoration, high-end decoration, but ordinary decoration all-inclusive generally 100 square meters in about 130,000 can be done.

    The ** of the full package repair is about 500-800 yuan per square meter. All-inclusive project introduction 1, all-inclusive materials and brands: Tiles:

    There is no first-line brand, the owner needs to buy it by himself, our tiles are tiles that have been used for many years without any quality problems, but they are definitely not the brands you say advertise more. In this case, the owner can purchase them himself. Of course, ** companies are big brands, and ** very low, you really think you are using good things "** decoration building materials are brands, exclusively for the cat greasy only" wood flooring is almost not used, because of pollution problems, so it has not been used for many years, and the owners need to have.

    Wooden door: custom-made, Chongqing Xinxing. I have been cooperating with manufacturers for more than ten years, and my reputation has been good.

    Sanitary ware: Shenluda is the main recommendation, has been cooperating with manufacturers, mainly toilets and showers, most of the bath cabinets are directly customized, rarely with finished products. Cabinets, bath cabinets, laundry cabinets:

    All of them are customized by their own factories, and the plates need to be selected, which is generally the same as our wardrobe customization. 2. The content of the conventional all-inclusive detailed explanation of tiles, wooden floors, wooden doors, door sets and window sets (this needs to communicate where the door sets and window sets are needed) sanitary ware, window sill stones, cabinets (the kitchen does not include electrical appliances) sinks are also available, to see whether the owner needs to decide to include, the smoke machine and stove are also provided, to see whether the owner needs, or self-purchased. The owner of the lamp and lantern purchases himself, and the socket is provided, or the owner can purchase it himself, which needs to be negotiated.

    Other whole house customization depends on whether the owner needs, and the owner needs to do it all-inclusive, and the owner finds it himself, which does not include, these are flexible, and it is all the owner's decision.

  5. Anonymous users2024-02-08

    We all know that buying a house is a big deal, and there is no trivial thing when decorating the house, after buying a house, I look at my bulging pocket, at this time, everyone will consider decorating their own house because they are in a hurry to move in, because their money is not much, everyone will consider at this time A detail is the budget for the decoration of the new house, for those friends who do not know how to decorate, so how much is the decoration of the new house? When the new house is decorated with guesses, there is a direct relationship between the space of your home and the choice of decoration materials, if it is a 100-square-meter house, choose medium materials** in about 80,000.

    Generally, if you choose low-end tiles, it is generally 20-40 yuan square meters.

    Cabinets should generally be based on economical cabinets, and the cabinets need to be based on the size of the kitchen and brand, configuration, modeling, generally between 5000-10000 yuan, if it is a simple decoration house, you can also do not need to choose brand products, you can customize cement cabinets by hand, ** between 4000-6000.

    Toilet: The toilet on the market is different, from tens of yuan to thousands of yuan, split toilet a little, but the practicality is not high, the bathroom costs about 10,000 yuan, if it is a simple decoration, you can only install the necessary things, such as bath bombs, shower heads, towel pendants, washbasins, etc., these kinds of utensils add up to about 5,000 yuan.

    Solid wood door: 1000-2000 yuan fan; Log door: 3000-10000 yuan;

    A simple wall decoration ** should be at 30-50 yuan per square meter;

    Now the house price is continuous, after we buy the house their own pockets have been empty, this time in order to decorate their homes better, so in the decoration we need to take into account is the new house decoration **, especially in the selection of materials we also need to choose according to their own economic ability, if we want to decorate the cost is low, it can only be considered is a simple decoration, which can reduce a lot of decoration costs.

    You can get it for free

  6. Anonymous users2024-02-07

    One. Foundation engineering.

    1 wall square meter 30 yuan package garbage.

    2 masonry walls 100 sqmYuan cement yellow sand and lightweight bricks.

    3 wall cement plastering square meters 15Yuan cement sand.

    Two. Hydropower installation project.

    1. Waterproof and moisture-proof project: 40 yuan per square meter.

    2 Bathroom caisson square meter 60 yuan (light ceramsite) 3 drinking pipe installation meter 50 yuan including pipe joint slotting, excluding faucet.

    4 sewer pipe installation m 50 yuan Liansu PVC sewer pipe 5 circuit installation 120 yuan including national standard line pipe bottom box mm wire does not include lamps.

    6 Air conditioner socket installation 240 yuan including national standard line pipe bottom box 4 mm7 network cable TV cable installation 90 yuan including socket.

    Three. Carpentry engineering.

    1. Wardrobe production square meter 650 yuan.

    2 gypsum board hanging flat ceiling square meter 100-150 yuan light steel keel 9 centimeters gypsum board cover 3 gypsum angle line meter 18 yuan.

    4. Door sleeve production set 650 yuan.

    5 m 40Yuan 9 centi, plywood, 3 centi, technology wood veneer, solid wood lines edge.

    6. Bathroom kitchen ceiling square meter 90-110 yuan thickened aluminum-plastic panel four. Slurry works.

    1. Ground leveling project square meter 30 yuan. (Shijing 325 cement, yellow sand and artificial.) Within 5 cm, more than 5 cm plus 5 yuan per square meter).

    2 floor tile paving square meter 38 yuan (pure manual).

    3 paving marble square meter 60 yuan (artificial).

    4 paved parquet marble sqm 80Yuan (artificial) 5 meters of footing meter 13 yuan (artificial).

    6 Threshold marble paving strip 38Yuan (artificial) does not contain stone.

    7. The window sill is paved with marble (20 cm wide flat window), 30 yuan (artificial), excluding stone.

    8 wall porcelain square meter 38 yuan, not including porcelain five. Painting and wall works.

    1 wall fan ash square meter 8Yuan The wall was cleaned and treated twice.

    2 stickers of wallpaper square meters 25Yuan package batch ash grinding moisture-proof (excluding wallpaper).

    3 wall painting square meter 12-15 yuan After drying, the wall sandpaper is sanded and painted three times.

    4 shovel wall skin square meter 6 yuan The original surface layer is shoveled off.

  7. Anonymous users2024-02-06

    Buying a home is a big deal, especially when it comes to renovating a house. There are many things in the decoration of the house. First of all, we need to find a reliable renovation company to design and construct.

    1. What is included in the decoration**.

    1.Material cost: including the cost of some main materials and auxiliary materials, such as latex paint, blockboard, etc.; Auxiliary materials such as glue, cement, sand, etc. The calculation method is generally calculated by multiplying the unit price of the material by the amount used.

    2.Labor costs: including labor costs for different types of work, such as carpentry, bricklayer, plumber, painter, etc. The current calculation method is generally to multiply the unit price of the building by the floor area.

    3.Management fee: generally charged at about 5% of the project quantity. Including management salaries, license fees, depreciation of fixed assets, tool usage fees, etc.

    4.Shipping and handling: Includes material handling and garbage removal. The materials purchased by the owner generally need to be handled by the owner himself.

    5.Cleaning cost: The whole house is clean and dispensable, and the owner can clean it by himself, which saves this cost.

    2. Calculation of the contents contained in the home improvement ** table.

    1.Due to different regions and different companies, the decoration materials are different every year, and the home decoration can only make an approximate budget by itself, which fluctuates up and down and is not accurate. What's more, the ** of each decoration company is not the same.

    Here, Bian Xiao just introduces a general direction for you and introduces what problems we need to consider when calculating.

    2.When decorating a house, there are several factors to consider: basic renovation, i.e. demolition of existing facilities or removal of garbage.

    The cost of garbage removal varies depending on the size of the renovation project. Slightly different floors**. Basically below the fifth floor, ** at 200 yuan per square meter.

    The elevator that can be used is not the same as the elevator that can't be used**. The elevator that cannot be used from the third floor to the seventh floor will increase by 30 to 50 yuan per square meter.

    3.The material cost is calculated in much the same way as the garbage removal cost above. For projects of 3-40,000 yuan below the third floor, the labor cost will go to 450 yuan, including the materials issued by the company and transported to the site, but excluding the materials purchased by the customer.

    If you can't use the elevator, the labor cost above the third floor will be increased by 50 yuan. 5-60,000 yuan project, **750 yuan, including the company's distribution of materials to get on and off, transport to the site, etc. , Ibid., and so on.

    4.The calculation of the material transportation fee is the same as for the above items. Material transportation fee (within the urban area), for projects below 30,000 yuan, the cost is 300 per square meter, including the materials issued by the upper and lower companies, transported to the site, excluding the materials purchased by the customer.

    If the elevator cannot be used, the third floor and above will be increased by 50 yuan floor. Other decoration materials are calculated according to the current market price per square meter.

  8. Anonymous users2024-02-05

    When looking for a decoration company for decoration, there are many people who will first ask the decoration company to issue a decoration list, but in the endHow to decorate**?Not only do we not know much about this, but some newcomers in the decoration company are not very quick to do it. I hope the following article can help you.

    First, how to decorate**.

    1. How to determine the grade of customer decoration, because the grade of decoration has high, medium and low grades, when talking to customers, the first thing you should understand is the actual needs of customers, whether it is high-end, medium-grade, or low-grade; Whether it's all-inclusive, or half-inclusive. The customer's grade is not guaranteed, and it is a waste of time to make the best plan.

    2. How to decorate the property must be determined according to the customer's room type, because different room types will be different, so when the customer asks for the dust bureau, it is necessary to let the customer provide a specific floor plan and area, and the decoration is mainly the kitchen and bathroom, and the double bathroom will be more expensive, so that the overall calculation of a **, so that the customer has an approximate number, if it meets the customer's psychological expectations, the customer will be more acceptable, And the probability of business success will naturally be greater.

    3. How to measure the area of decoration in the field, after the preliminary consent of the customer, then you can go to the field to measure the area, prepare a 3-meter or 5-meter tape measure, a notebook, a pen, and write it down while measuring, the actual data is the basis of the first class, when measuring, the size should be accurate, do not write more data, because some customers are very patient, they will retest, if the data is found to be fraudulent, then the business is likely to fail directly.

    4. How to fill in the decoration form, after we have the actual measurement data and the needs of customers, we can fill in the decoration form; Some basic material and labor costs are fixed, such as the cost of a bricklayer, which can be filled in directly. The main part of the change is to consult the customer's requirements, add them one by one, and some issues need to be communicated with the customer to determine.

    For example: what model and brand are used for floor tiles, wall cloth for walls or directly painted. Of course, this must be made clear to the customer in person.

    5. How to decorate, the project must be complete, the project in the table must be complete, you can't add one for a while, minus one for a while, so that customers feel that the company's management is chaotic, suspicious, serious and give up directly, if this is the case, then the preliminary work will be done in vain.

    6. How to decorate must be more for the sake of customers, because in the decoration, there are quite a lot of parts that can save money, which can be raised. For example, the wall and floor tiles behind and below the kitchen cabinet can be replaced with defective bricks, which can save a lot of money.

    This will move the customer, you must know that the customer is also shopping around, if you are satisfied, a business will naturally be easy to succeed.

    After reading the above article, do you know how to decorate? If the above article can help you, then the purpose has been achieved.

Related questions
18 answers2024-06-29

After about 2 months, I opened the window, and I was not sure that I could find a special testing unit to test.

13 answers2024-06-29

The manual ** is not dead, there may be a unified project **, and some companies are divided into batches**, how much is each project, this kind of division is relatively fine, in fact, it is almost the same. Some people may ask, why the same project, the labor difference is large, the following Anhui Shuangjia purification will tell you about the problem. Some engineers have deep qualifications, fine workmanship, and high fees, depending on what to do and how much to do. >>>More

12 answers2024-06-29

1. It can be calculated according to the area, a 10-square-meter room, placing 2 pots can absorb 90% of the formaldehyde in the house. >>>More

7 answers2024-06-29

I think the customization is better, more beautiful, the use effect is better, and the general use time of the on-site construction is longer.

49 answers2024-06-29

It depends on what level of woman you are.

Women of the same level may want to find a better man. >>>More