1. Interior decoration process schedule.
1. Demolition and modification, demolition of the wall or remodeling of the wall;
2. The wall and ground are consolidated, the wall is solid, and putty powder is solid;
3. Hydropower transformation, hydropower line transformation, the general developer's line is only enough for basic lighting, and the quality of the line is average, according to their own living habits to do hydropower transformation to facilitate their own life;
4. Waterproof, do waterproofing in the place where the waterway passes through to prevent water leakage in the later stage;
5. Masonry, the size of the cabinet can be measured after the bricking, wall reconstruction, tiling and other projects are included, and the cabinet is customized in advance to prevent the slow construction period of the cabinet and delay the progress of the whole project;
6. Wooden modeling, dining room, bedroom and other areas that need to be suspended ceiling can be done at this time;
7. The ground is leveled, and the size of the wardrobe can be measured after that. Before laying the wooden floor, it is necessary to do the work of ground leveling, which can be carried out at the same time as measuring the size of the wardrobe, because it also takes time to make a wardrobe, so as not to delay the entire construction period;
8. Wall putty treatment, wall brush putty and latex paint;
9. Installation of main materials, cabinets, wooden floors, wooden doors, cabinets, sanitary ware and other main materials;
10. Finish the project, and then do a cleaning;
11. Furniture, home appliances, soft, lamps and lanterns installation.
2. Precautions for interior decoration?
1. The waterproof layer can effectively avoid water leakage, so during construction, we must pay attention to the establishment of the waterproof layer and the determination of the thickness.
2. Design style for the decoration of the house, in addition to paying attention to comfort, we should also pay attention to the overall coordination, so when designing, we should do a good job of communicating with each other to avoid quarrels when disagreeing.
3. Decoration ** Before construction, you must make a preliminary budget, because the decoration cost that needs to be invested in the later stage is too high, if the conditions permit, it is best to consult relevant professionals, so that the budget table will be more accurate.
4. For the selection of household appliances and equipment, it is recommended that you choose in combination with the decoration style.
5. Pay attention to the sense of space For many users, they will generally install a ceiling at home, but they should pay attention to the overall sense of space, especially not too low, otherwise it will bring a sense of depression to people, and it is not conducive to the flow of good aura.
6. Pay attention to indoor lighting in the case of insufficient natural light, it is recommended to adjust the brightness of the house through the light source, generally speaking, a good feng shui pays attention to the brightness of the interior, and the dark room of the bright hall is the pursuit of feng shui, so the light in the general living room will be brighter than the bedroom, and if the house is facing a strong sunlight at a certain time, it should be noted that the curtains should be used to block it to prevent the light in feng shui.
-
1. Demolition and modification, demolition of the wall or remodeling of the wall;
2. The wall and ground are consolidated, the wall is solid, and putty powder is solid;
3. Hydropower transformation, hydropower line transformation, the general developer's line is only enough for basic lighting, and the quality of the line is average, according to their own living habits to do hydropower transformation to facilitate their own life;
4. Waterproof, do waterproofing in the place where the waterway passes through to prevent water leakage in the later stage;
5. Masonry, the size of the cabinet can be measured after the bricking, wall reconstruction, tiling and other projects are included, and the cabinet is customized in advance to prevent the slow construction period of the cabinet and delay the progress of the whole project;
6. Wooden modeling, dining room, bedroom and other areas that need to be suspended ceiling can be done at this time;
7. The ground is leveled, and the size of the wardrobe can be measured after that. Before laying the wooden floor, it is necessary to do the work of ground leveling, which can be carried out at the same time as measuring the size of the wardrobe, because it also takes time to make a wardrobe, so as not to delay the entire construction period;
8. Wall putty treatment, wall brush putty and latex paint;
9. Installation of main materials, cabinets, wooden floors, wooden doors, cabinets, sanitary ware and other main materials;
10. Finish the project, and then do a cleaning;
11. Furniture, home appliances, soft, lamps and lanterns installation.
-
Article 1 Basic Requirements.
1. Basic procedures.
1. Interior decoration should comply with the following basic procedures:
1) The living room, bedroom, and office should be topped first, then the wall, and then the ground;
2) The kitchen, bathroom, and boiling water room should be waterproofed first, and then the wall, the top, and the ground should be back.
3) Interior decoration construction should be carried out in the order of first concealed engineering, intermediate engineering and finishing engineering.
4) The next process should be completed after the construction of the previous process and the acceptance and meet the design requirements, and then carry out the construction.
Second, the basic requirements of the material.
1. Material procurement requirements.
1) The purchased materials must have quality inspection certificate, environmental protection inspection certificate, product packaging or labeling with Chinese product name, specification, model, manufacturer, address, product expiration date, must meet the relevant national environmental protection standards, health standards and fire protection standards.
2) When purchasing materials, testing equipment such as water measuring instruments must be used to test product quality;
3) When purchasing materials into storage, acceptance work should be done.
2. Material storage requirements.
1) The inventory materials must be stacked neatly and kept by special personnel;
2) Wooden materials must be stored in a dry and ventilated area, and do a good job of fire prevention, waterproofing and insect prevention;
3) Inventory materials must be first-in, first-out to reduce backlog.
3. Requirements for the issuance of materials.
1) The material salesman organizes the distribution of materials according to the shipping order;
2) Inventory materials must be first-in, first-out, and the inventory backlog caused by material quality should be dealt with in a timely manner;
-
There are many ways to decorate the house, and the effect of different methods will be different, but the steps or processes of decorating the house are almost the same, so it is best to understand before decorating the houseA breakdown of the home renovation processHow? What are the precautions for home renovation? Let's introduce it to you.
1. A detailed list of home decoration processes.
1.Before the hydropower transformation, the cabinet designer needs to measure and determine the exact location of the lamps, basins, bathtubs, washing machines and switches, so as to formulate the hydropower transformation plan and design the location of the power supply and interface. The air conditioner and power supply should be placed on this wall at the head of the bed as much as possible to prevent it from blowing directly on people.
2.When carrying out the actual decoration, there are direct costs involved, and the direct costs are actually included in the materials, equipment accessories, freight and labor costs, etc., for these costs, when the actual consumption is carried out, they are estimated in accordance with the market transparency.
3.The cost of decoration materials: Before the home decoration, we have to know how much the specific decoration materials are when the actual decoration is made, and then according to the price of the actual materials, a number of comparisons are made, and the price obtained after that is the actual decoration price.
2. Precautions for home decoration.
1.Inexperienced homeowners think that the stronger the seal, the better, in fact, you know, the aluminum-plastic pipe will expand and shrink when the temperature changes, so it is necessary to reserve the space for expansion when sealing, otherwise it is easy to be squeezed by the hard cement. Therefore, it is better to say that the aluminum-plastic pipe seal cement is looser.
2.If you choose a decoration company to decorate, you can choose several decoration companies to compare, see if these decoration companies are legally registered, look at their construction site, observe the construction technology of their construction team, etc., and make a choice after comparison.
3.The hot and cold water interface left for the bath faucet, the angle must be adjusted when installing the water pipe, and it is best to buy the shower in advance and try to install it. Pay special attention to simply screw the shower on before tiling, remove it after the tiles are pasted, and then install it at the end.
To prevent the occurrence of tiling, the water pipe interface has been fixed, and because of the angle problem, it is impossible to install the pain of planing the bricks.
The general house decoration will first design a schedule, so that the decoration is clear at a glance, so what are the home decoration process schedules and precautions, we have read the above introduction and also understood it, so if you still want to know more decoration information, please continue to pay attention to it.
-
The decoration process should be prepared for decoration first, and then divided into several steps to decorate, such as demolition, wall masonry, water and electricity, bricklayer, carpentry, oilman, and installation, and the specific process is as follows
1. The first week (demolition).
Construction arrangement: finished product protection; debris removal; tile removal; wall demolition; shovel wall skin; Garbage removal.
Order before the start of construction: anti-theft windows, windows, heating, cabinets, plumbing fresh air system, ** air conditioning, dismantling gas meters.
2. The second week (building the wall).
Construction arrangement: wall masonry (hanging wire); sealing the door stack; Wrap riser; Doors and windows are closed.
Measurement: security door measurement, window measurement, heating dismantling, cabinet measurement, air conditioning measurement, fresh air measurement.
Order: Smoke cooker, sink, water treatment equipment (pre-filter, water purification, soft water), gas water heater.
3. The third week (hydropower).
Construction arrangement: slotting; routing and threading; hydropower transformation; water pressure test; Groove sealing, acceptance.
Installation: installation before hydropower renovation (** air conditioning), floor heating after hydropower transformation.
Disclosure: cabinet water and electricity, water treatment equipment, zero cold water gas water heater, wall openings (air conditioning, fresh air, gas water heater, flue, water and electricity through the wall, gas pipeline holes, etc.).
Order: strong and weak electric box and supporting air conditioner, ceramic tiles, wooden flooring, interior doors, customized cabinets.
4. The fourth week (waterproof).
Construction arrangement: kitchen and bathroom wall floor leveling; Find a slope before waterproofing; Leakage point treatment; waterproofing; waterproof and sun-dried; Closed water test.
Delivery: Tile delivery.
Order: door stones, window sill stones, integrated ceilings, floor drains, kitchen and bathroom check valves.
5. Five or six weeks (bricklayers).
Construction arrangement: brushing; Soaked brick brush adhesive; Laying wall tiles Floor tiles; Install the door stone floor drain; Hook seam acceptance.
Installation: windows, security doors, doorstones, floor drains.
Measuring: Wooden Doors, Metal Doors, Floor Doors, Cabinets, Custom Furniture, Integrated Ceilings, Shower Cabins, Window Sill Stones, Bathroom Products.
Suspend for 2-3 days and wait for the ground to dry.
6. Seventh week (carpentry).
Construction arrangement: bottom to top; video walls; Wrap riser; curtain box; Make partition walls.
Order: latex paint (including roller and wool brush), wallpaper, wall covering.
7, the first. Eight or nine weeks (oilers).
Construction arrangement: sealing groove and repairing joints; Painting the wall ; gypsum bottom layer; mesh cloth; water-resistant putty; abrasive cloth grinding; Removal of floating ash; Painted, wallpaper, wallcovering.
Installation: Window sill stone.
Order: switch panels, light strips, lamps, angle valves, furniture, clothes racks.
Suspend for 2 days, close the windows, dry in the shade (2-3 days) and dry the wallpaper in the shade for about 5 days.
Order: air conditioner, washing machine, refrigerator, TV, curtains soft furnishings.
8. After the tenth week (installation).
Construction arrangement: switch socket; angle valve hardware pendant; Lamps; Decorative paintings.
Construction: beauty sewing, relocation and modification of gas meters.
Installation: switch panels, lamps, heating, gas water heaters, smoke pipes, integrated ceilings, bathroom products, flooring, cabinets, interior doors, water treatment equipment, custom furniture, air conditioners, clothes racks.
-
The decoration process generally includes the determination of the design plan, the selection of materials, the preparation of construction, the construction stage and the acceptance stage.
With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tuba Rabbit Big Platform Counts**].
No longer worry about the company's price increase, omission and price increase.
Determining the design plan is the first step in the decoration process, which requires Shuhuai to find a professional interior designer to communicate and determine the decoration style, layout and color matching. The design cost is generally between 5,000-10,000 yuan.
Material selection is a key part of decoration, and it is necessary to choose the right material according to the design plan. Depending on your needs and budget, the cost of materials will vary. Generally speaking, the cost of decoration materials accounts for 30%-50% of the entire renovation budget.
The construction preparation stage includes the formation of the construction team, the formulation of the construction plan and the procurement of materials. The cost of the construction team depends on the scale of the project and the construction period, generally between 5,000-10,000 yuan.
The construction stage is the core part of the decoration, including demolition, water and electricity renovation, bricklayering, carpentry, painting and other works. The construction cost is determined according to the complexity of the project and the technical level of the construction team, generally between 1000-2000 yuan square meters.
The acceptance stage is the last step of the decoration lead, which requires a comprehensive inspection and acceptance of the decoration project. If a problem is found, it is necessary to communicate with the construction team in time to solve it. The acceptance fee is generally between 1000-2000 yuan.
It is recommended that in the decoration process, it is necessary to choose a regular decoration company or construction team, sign a contract and clarify the quality and duration of the project. At the same time, we should pay attention to the purchase of materials and choose the most reasonable materials. During the construction process, it is necessary to maintain good communication with the construction team and solve problems in a timely manner.
Finally, it is necessary to carry out a comprehensive acceptance to ensure the quality and effect of the decoration project.
First of all, it is necessary to waterproof the bathroom and kitchen, and at the same time, the floor should be laid neatly, and then the wires, water pipes or floor heating should be pulled, and then the cement and tiles should be paved, and then the wall tiles or putty should be painted, and then the installation should be carried out.
The home renovation process generally consists of the following main steps, which may be adjusted on a case-by-case basis: >>>More
The specific process is as follows:
1. Clarify your housing needs. It includes three parts: functional requirements, storage needs and aesthetic needs. Then sort out your own housing needs. >>>More
Flame retardant materials are used for wall grooves, threading, and wiping pipes. The lower tube of the ceiling is firmly fixed with clips to ensure that it is horizontal and vertical, and the wire box is installed where there are lamps and lanterns, and the cover is buckled outside. Interior decoration must first consider fire prevention, the pipelines used must be flame retardant, and ensure that each line has a protective casing.
1.Pre-design.
Before decoration, it is necessary to clarify the tiling area, wallpaper area, floor area and tiling area of the house, and at the same time, measure the wall size of the furniture placed in the decoration design. >>>More