When the rough house is closed, the wiring inside is arranged. And the switch is bad for the author or something, if not, your house should not be finished. I bought the house two years ago, and all the facilities in it were complete when I handed it over.
For example, the big white has already been hung up. And the geothermal heat on the ground has also been paved. The only thing that is not is that there is no bedroom door in the house now, all of which need to be installed by yourself, or if you don't need it, you can not install it, all the sockets will be installed for you, whether you use it or not, at least there are.
But the lights are not.
-
It is arranged, but this circuit may be arranged in the basic circuit, and it is not possible to use all the composite after moving in. Therefore, it may be necessary to carry out renovation and renovation after handing over the house.
-
First, there will be an error between the drawings and the actual construction, although this error should not be too large, but because the pipeline direction in the electrical drawings will be deviated during the construction of on-site workers.
Second, the wiring direction, the location of the plug and socket, the location of the distribution box, the number of lamp positions, etc., must conform to the drawing design. However, there will also be construction errors in the location.
If, because the site does not match the drawings, you cause damage to the electrical system or other losses in use or renovation, you have the right to claim compensation from the developer.
-
When I was admitted to the house, was the circuit inside bad? He said that he couldn't help it, the circuit inside was not bad when he received the house, and then he had to go to the three by himself, because he didn't spend it on the computer now, why don't you get it if you want, design it yourself, damn, there's nothing in it, it's all Hong Kong, including Japan, do the homework first, it's all your own place, and then you design it yourself, how to get it? It's up to you how you connect?
How do you go about modifying your route and sturdy messing up? It's all like this.
-
Generally speaking, it is necessary to have basic functions. The circuit is bad.
-
1. You should look at the outside first.
Inspect facades, exterior tiles and paints, unit doors, stairways.
2. Then check the inside.
Inspect the entrance doors, doors, windows, ceilings, walls, floors, wall tiles, floor tiles, water supply and discharge, waterproof water storage, strong and weak electricity, heating, gas, ventilation, smoke exhaust, and exhaust air one by one.
3. The last measurement is adjacent.
Problems such as closed water storage tests and water meter idling must be coordinated with upstairs and downstairs neighbors.
Second, the details of the inspection of the rough house when the house is closed.
1. Test water and electricity.
First of all, check whether the readings of water and electricity meters are normal, and if there is a situation where the number is too large, it must be dealt with in time.
When testing the circuit, the general home decoration will involve the strong current box and the weak current box, to see whether the strong and weak current box installation meets the national norms and standards, whether the distance is more than 1 meter, otherwise it is easy to cause signal interference.
When inspecting the waterway, we should pay attention to whether the waterway is smooth, you can take a bucket of water, pour it into each floor drain, and see if the drainage is blocked.
2. Check doors and windows.
To inspect doors and windows, we must first see whether the glass of the doors and windows has the "CCC" mark, check whether the sealing strips of the doors and windows are intact and undamaged, whether the glass is damaged, whether the switch is smooth and other details.
3. Check the flatness of the wall.
Use a ruler to stick to the wall and check the flatness of the wall, and the general gap is reasonable within centimeters. Also, pay attention to the verticality of the yin and yang corners in the room.
4. Check the squareness of the room.
This is relatively simple, you can easily use a tape measure to measure the diagonal of the four corners of the room, and generally the error of the length of the two diagonal lines within 5 cm is qualified.
5. Check the hollow drum on the wall.
Check all the walls with a hollow drum hammer, note that there can be no more than two hollow drums in a room, and at the same time, you also need to check the floor that needs to be tiled so that it can be repaired in time before decoration construction.
-
Clear water room refers to the degree of decoration in the house. Generally, the interior decoration of the house is divided into clear water room, simple decoration, hardcover and high-end decoration, and the clear water room is just built in the house, and there is no decoration at all, so a big white wall is scraped. When choosing such a house, first do a good job of the precautions for receiving the clear water house, and then make a plan and budget for the decoration of the clear water house according to your own preferences and plans, and then start to prepare for construction.
-
First, it is needed, because the closed water test is an important part of testing waterproofing, which is essential. Once you've done a closed water experiment, you won't have to worry about your neighbors coming to you.
Second, how to do a closed water test:
1: Plugging the floor drain.
Put the prepared sand into a plastic bag and block the floor drain tightly to prevent your water from slipping away quietly It is best to make a plastic bag with sand into a sharp corner, so that it can be better stuffed into the floor drain; But remember to keep the floor drain tightly tucked in.
2: If the water is going to overflow, you need to block the cement floor at the door as high as the outside aisle, in this case, you need to plug the cement 3: release the water.
For fear that the water will evaporate, the general ground water is released to form a depth of 20 30 mm. Start to release water, afraid that the water pressure is too strong to damage the waterproof, so put a mat.
-
The pick-up room you are talking about is the water room or the hardcover room. If it is a clear water house, then the developer has indeed done waterproofing before handing over the house, but you will destroy the waterproof layer when you renovate and renovate, so you must redo the waterproofing. If it is a hardcover room, then it has been tiled, and the bathroom and kitchen can do a closed water test!
-
The civet supervisor will tell you whether you need to do a closed water test when you close the house.
First, the blank room must do a closed water test.
The layout of the bathroom in the hardcover room is generally divided into two categories, one is with a separate shower room, and the other is without a separate shower room. For these two different types of houses, the suggestion of the civet supervisor is: there is a hardcover room with a separate shower room, and the waterproof test can be done for the shower area during the acceptance; For hardcover rooms without separate showers, it is not recommended to do a waterproof test.
How should a closed water test be done?
1.Communicate with the landlord property downstairs in advance.
2.Plugging the floor drain: Before releasing water, the floor drain must be plugged first, otherwise all the water will flow away.
3.Water storage: Don't store too much water, a height of 2-3cm is enough.
4.Mark the water level.
5.Check for leaks: After 24-48 hours, check if there is a significant drop in the water level, and if so, immediately go downstairs to see if there is a leak. Even if you find a little water stain, it is not waterproof.
There is no separate shower room in the hardcover room, and it is not recommended to do a closed water test. Why?
1.The developer will do the corresponding testing when the project is completed.
2.The closed water test is easy to soak the existing furniture, causing unnecessary losses.
3.Developers generally have a warranty period of about 5 years for concealed projects. If there is a water leak and other phenomena within this time, you can directly call ** and ask the developer to rectify.
4.Although the waterproof test is not done, the adjacent walls and floors of the bathroom, the downstairs ceiling and other details should also be checked, once the water leakage is found: if there is mildew, bulging, anti-alkali, water seepage, water leakage and other phenomena, timely communication and rectification, prevention before it happens.
-
This work should not be done at the time of closing, after the piping and waterproofing are done, what should you do if the test leaks.??
-
The developer is only responsible for installing the natural gas pipeline to the kitchen, and before you receive the house for decoration, go to the gas company to apply for opening, make an appointment to hang the meter, and walk the pipe to the stove.
-
For example, if there is no natural gas to enter the household, it is because the natural gas is not entering the household, so the meter is not settled.
-
This natural gas is generally installed after installation, because it is easy to be dangerous if it is left for too long. I'm afraid the pipe will be broken.
-
Then it depends on what the standard of receiving the house was at that time? If there is no natural gas meter in the standard, it is unified.
-
The natural gas opening fee and gas opening fertilizer of the rough house need to be collected separately.
-
It should be that the whole complex has not yet installed natural gas.
-
Then it may be that the natural gas in this community has not been connected.
-
Why is there no natural gas meter when the rough house is closed, and it will be installed for you at an additional charge.
-
No, the blank is not sprinkled, I think it is a simple scrape, I want you to decorate it yourself, and it is not a resettlement room, but also the kitchen and bathroom for you to install!
-
No, only sewer pipes and floor drains.
-
No, there is only a sewer outlet, or how to call it a rough house.
-
There is nothing in the rough house, only the finely decorated.
-
The rough house has nothing but a wall.
-
First, hydropower, look at the hydropower lines, the circuit should look at the strong and weak current, and the waterway should see if it is blocked! Is the waterproofing done? Second, whether the standard configuration is in line with the standard, and whether the installation quality of doors and windows is standardized. Clause.
Third, the walls and ground blank rooms are only approximate, so as long as there is no big difference. It is recommended to find a decoration company first, and then bring a designer and decoration workers to go, which is more professional and responsible, because there is no problem when receiving the house, if there is a problem in the future, it will be their problem. FYI!
Precautions for the delivery of rough houses: (1) First check the developer's "Residential Quality Assurance Certificate", "Residential Instruction Manual", "Construction Engineering Quality Certificate", "Real Estate Development and Construction Project Completion Comprehensive Acceptance Certificate" and "Completion Acceptance Record Form". (2) Inspect the house first and then go through the procedures. >>>More
Many renovation companies have their own design ideas, including changing the water and electricity lines. Personally, it is recommended that the indoor space arrangement should be considered before decoration, as long as the water and electricity interfaces are reasonably convenient and sufficient. It is not advisable to change. >>>More
Rough house. You can paint directly, and you need to pay attention to it when decorating: Paint immediately on the rough room, not only will the wall be uneven, but also in the long run, their walls will continue to have problems, because this kind of wall is all damp or has some problems, their walls are easy to crack. >>>More
1 Check all outlets.
Friends who don't have a pen can take a charger and a three-phase connector power strip. The charger can check the two-phase socket, and the three-phase connector can check the three-phase socket. >>>More
If there is latex paint on the original wall, it can be completely cleaned, and then the tile can be pasted, which is the most correct, and can ensure that the tile is particularly strong and will not fall off easily.