More and more new houses are delivered in the form of hardcover houses, how to accept?

Updated on home 2024-07-14
11 answers
  1. Anonymous users2024-02-12

    More and more new houses are delivered in the form of hardcover decoration, and owners must learn to accept and prevent being pitted. If you want to accept the hardcover room, then you need to buy acceptance tools. You need to buy a hollow drum hammer, a ruler, and a laser.

    Use a hollow drum hammer to knock on the floor tiles in your home, and if you find that the tiles are hollow, then you must refuse to accept them. Use cost to measure the flatness of the wall on the wall, and if the wall is uneven, then it should also be rejected. <>

    Use a laser to draw a horizontal line and measure the verticality of the wall. Once all of this has been checked, it is time to carry out circuit acceptance, which can be done with a socket strip with an indicator light. Plug every socket in and see if it's powered on.

    To check the lights in your home, turn on all the lights and see if the switches are working. The hardcover room also has a warranty after delivery, when the owner finds that the electrical appliances are unusable or frequently tripped after moving in, then you can find the property to repair. <>

    There is no charge for this repair, and the owner must know in advance to prevent being deceived. After the acceptance of electricity, it is necessary to carry out the acceptance of the waterway, which is a concealed project. At the time of acceptance, it is necessary to see whether the hot and cold water is circulating, whether the drain is drained normally, and turn on the shower room to see if the water will flow to the dry area.

    When accepting the tiles, we must pay attention to the fact that if you hear the sound of emptiness, then it means that the floor tiles are hollow, and this time it is necessary to reflect this problem. <>

    Most of the hardcover rooms use custom wardrobes, depending on the verticality of the yin and yang angles of the wardrobe, you can use a laser to measure, if you find that the wall is not straight, then the cabinet will be tilted after installation, these problems should be noted. When inspecting the baseboard, if you find that the gap is too large, or the baseboard is not vertical, then you need to find a developer to fix it. When accepting the wooden door, you should look carefully, and if you find a flaw, then you need the developer to repair it.

    When the hardcover room is delivered, you must keep your eyes open and carefully accept it to prevent it from entering the pit.

  2. Anonymous users2024-02-11

    Pick the most important areas for inspection, such as load-bearing dwellings, drainage channels, etc.

  3. Anonymous users2024-02-10

    The first point is to accept the house, they first have to observe the entire decoration of the house, the second year to see if the water and electricity are maintained very well, and the third year to see if the waterproof is very good.

  4. Anonymous users2024-02-09

    circuit acceptance; waterway acceptance; tile acceptance; Acceptance of the top surface of the wall; floor acceptance; Acceptance of wood works.

  5. Anonymous users2024-02-08

    1. Check the water pipes in the kitchen and bathroom to see if the drainage pipes are smooth and whether there is leakage in the water pipes. You can fill the vegetable sink, basin, and bathtub with water, and then drain it out, and then check the drainage speed at this time; Toilet drain inspections require repeated drain tests.

    2. Check the distribution lines and sockets. The easy way to do this is to turn on the light switch and see if all the lights are on. At the same time, you should also bring a multimeter to check whether each socket has electricity;

    3. Check the hollowing of wall tiles and floor tiles in the kitchen, bathroom and other parts. Use a small rubber hammer to knock on the tiles and floor tiles at will, and listen to the sound, if the hollow drum rate is more than 3%, it can indicate that there is a quality problem.

    4. Inspect wood products and paint products. Carefully observe whether the wood products are deformed, whether the cracks at the joints are serious, whether the hardware installation is correct and firm, whether the paint is flowing, and whether the wall paint is cracked in a wide range.

    5. Carefully inspect some corners and hidden places.

  6. Anonymous users2024-02-07

    When the fine decoration is delivered, Xinzheng needs to pay attention to the following aspects: the overall acceptance of the house, the acceptance of the concealed project, the acceptance of special parts, the acceptance of materials and appliances, etc. For the owner, many projects are not very familiar with the delivery of fine decoration, such as the acceptance of hidden projects is very difficult.

    It is recommended to be accompanied by professionals for acceptance during the delivery of fine decoration, which can ensure the rights of the owner and avoid subsequent disputes.

    First, the overall acceptance of the house.

    When the fine decoration is delivered, the overall acceptance of the house is a large framework. It is necessary to check whether the area of the house is the same as the area when the contract was signed, including the calculation of the shared area and the balcony area. The second is the location orientation, some people are more concerned about the location orientation, so the fine decoration should be checked when the delivery is good.

    Whether the outdoor facilities are complete and consistent with the contract description. Finally, whether the indoor structure meets the standard of fine decoration delivery.

    2. Acceptance of concealed projects.

    Concealed items include water, electricity, gas, network, TV, etc., these lines have been buried in the wall in advance, and it is difficult to accept, so professional personnel are needed to explain and understand the specific direction of the line, so as to facilitate future maintenance. Secondly, it is necessary to check whether these items are smooth, and check whether the water meter, electricity meter, and gas meter are all zeroed in more detail.

    3. Acceptance of special parts 1, acceptance of toilets.

    The toilet is generally a shower, toilet, and wash basin together. Common problems in this area are water seepage and leakage. It is necessary to focus on inspecting the wall roots, walls, toilet connections, etc. In addition, it is also necessary to observe whether the water is unobstructed and whether there is any blockage when sitting or squatting.

    2. Kitchen acceptance.

    There are many household appliances in the kitchen, observe whether the plug switch is reasonable and whether the number can meet the general needs. In addition, whether the locker door opens and closes freely, whether the faucet is leaking, whether the vegetable sink is blocked, etc.

    3. Acceptance of doors and windows.

    The doors and windows are devices that isolate the outside world, and they need to be carefully accepted when the fine decoration is delivered. First of all, you need to determine whether the façade is flat and whether the new security door key is enabled. The second is the window, to see whether the right-angle joint is tight, whether the surface is smooth, and whether the dust-proof window is open freely.

    In addition, it is also necessary to pay attention to whether to install anti-theft windows, and the fine decoration delivery must be equipped with anti-theft windows.

    4. Acceptance of materials and utensils.

    For decoration materials, although it is not clear which materials are used, the advantages and disadvantages of the materials can be determined by smelling. In addition, it is possible to compare the bills of materials and determine the material category.

    After the above acceptance methods, I believe that when the fine decoration is delivered, it will be able to help the owner check the internal and external conditions of the house, and the problems can be solved through negotiation with the developer in time, so as to avoid the situation that the property is ignored and the developer ignores it.

  7. Anonymous users2024-02-06

    As shown in the figure below, the acceptance house should be inspected and paid attention to the quality problems in this screenshot.

  8. Anonymous users2024-02-05

    What are the common problems and key points of hardcover house inspection: decoration concealment project, decoration concealment project includes water and hydropower transformation, ceiling structure and toilet waterproof engineering project. The structure of the ceiling is not indicated in the as-built drawings, but the side of the fine decoration, the lamp position or the ventilation hole of the air conditioner can be seen in the structure, according to the regulations, the decoration concealment project decoration ceiling must be made of light steel keel partition wall.

    Air index, the owners of the community first carefully check the details of the interior decoration materials, and check whether the harmful substances are beyond the standard according to the requirements of work discipline. After the completion of the project, the real estate developer must give the owner of the community an authoritative certification of the indoor air test report, the national recognition is with the "CMA" mark, and the others are invalid.

    There are three types of waterways, drinking water, boiled water, and raw water. Raw water is generally used in the toilet, which is non-domestic water. The raw materials of the water pipe directly affect the service life of the waterway system software and the drinking water safety of the owner, and ensure the application of standard raw materials.

    Owners of residential areas can obtain as-built drawings from the property service company to inquire about the type of electrical wiring in the house, the location and composition of the electrical outlets, and the volume of the power consuming machines. Check whether the leakage circuit breaker of the distribution cabinet has lighting fixtures, whether the power socket is separated according to the power size, and whether the power switch is beautiful and can be used, all of which are the details to pay attention to when the new house is accepted.

    Carry out on-site acceptance of new houses. There are many aspects of the basic content of the acceptance of the new house, and there are many details that should be paid attention to, mainly to see the decoration status of the wall, pavement, washroom, bedroom, living balcony, restaurant kitchen, canopy, window door, water and electricity engineering and other places. In addition, it is worth noting that when the new house is accepted, don't forget to check whether the specific total area of the house is consistent with the area on the contract.

    The buyer and the real estate developer promise the time and place of the new house acceptance, and after determining the time and place of the new house acceptance, the buyer will go to the agreed address on time to carry out the new house acceptance. When the new house is accepted, it can also be the acceptance of the new house, or it can be found to find some more professional third-party house inspection organizations to carry out the hardcover house inspection. After the on-site acceptance of the new house is completed, the buyer will feedback the product quality problems found in the process of acceptance of the new house and his own doubts or thoughts to the real estate developer, and the real estate developer will formulate a solution and make adjustments according to the solution as soon as possible.

  9. Anonymous users2024-02-04

    When the hardcover room is accepted, the most important thing is whether the water and electricity in the room are suitable, and then there are some details when decorating, such as the gaps in the tiles.

  10. Anonymous users2024-02-03

    In the process of acceptance of the hardcover house, the area of the house should be measured first, the waterproof test should be carried out, and the ground should also be leveled.

  11. Anonymous users2024-02-02

    Now many people in order to buy a house for the convenience of buying a house, will directly buy a hardcover house when buying a house, it saves us the cost of decoration, do bright with a bag to move in, but also make it more convenient for people to buy a house, so how should such a hardcover house be accepted? Next, I will introduce to you how to accept the hardcover brigade key attack room.

    1. Hardcover room acceptance - check the wall leveling and dismantling.

    The first is to use a tool such as a long ruler to close the wall to the ground to check whether the wall is flat, and at the same time observe whether it has scratches and cracks, and whether the wall has burst points.

    Second, the hardcover room acceptance - acceptance of water supply and drainage.

    The second is to check whether the drainage of the drainage pipe is smooth and whether there is leakage in the upper water pipe. Our method of testing is to fill the sink, basin, and bathtub with water, then drain it and check the speed of drainage. It is necessary to pay attention to the drain inspection of the toilet bowl and repeatedly perform drainage tests to see how well it drains.

    3. Hardcover room acceptance - check the sales contract.

    Security doors, sanitary ware, decorative materials, lamps and overall cabinets may not match the brand agreed in the original contract, so it is recommended that the owners do not have to rush to accept the quality of the construction project when accepting, but should spend some time to check the equipment.

    Fourth, hardcover house acceptance - check the quality of the house.

    The first thing to do is to carefully inspect the floor and roof of your house for cracks. Generally speaking, cracks parallel to the beams of the room are not dangerous even though they are of the same quality, and they will not hinder their use after repair. If the crack is at a 45-degree angle to the corner of the wall or perpendicular to the beam, it means that the settlement of the house is very serious, and there is even a structural quality problem.

Related questions
5 answers2024-07-14

This is one of the reasons, because there are many hardcover rooms whose quality is not particularly good, and they cannot meet the needs of different groups of people, and they are particularly expensive.

29 answers2024-07-14

Because the Internet is now more developed, more and more people can see it, which makes people feel that only the awl face is a beauty, which leads to a misleading aesthetic among young people.

20 answers2024-07-14

Sprinkle chicken dung, sheep dung, and pig dung on the land. Don't use a little chemical fertilizer. Make sure your land is fertile and worry about the crops lodging.

9 answers2024-07-14

It should be that I am usually worried that there will be insects at home, or I am worried that there will be insects when the rice at home has been placed for a long time, and the long-term worry will arise when I sleep and dream.

10 answers2024-07-14

Teachers' incomes are rising year by year, and their social status is also rising, and more and more people are applying for the teaching exam. However, it is an indisputable fact that more and more young teachers are now resigning. The reasons for this are none other than the following: >>>More