-
Problems and improvement measures in the production department.
1.Production tasks and planning.
In the future, the production department will improve the production plan.
Reasonable production of orders. Make the production work orderly.
2. Yield and quality.
It is necessary to increase the control of product loss.
Strengthen the control of the production process.
Strengthen the self-inspection of the production line of the production department.
Increase productivity.
3. Personnel management.
Establish a workshop management system.
Strengthen the skills training of personnel.
Improve the quality awareness of employees.
4.Production equipment management.
Strengthen the maintenance of production equipment, so that the maintenance should be planned.
The equipment should be inspected daily, true and accurate, and problems should be dealt with in a timely manner.
The maintenance ability of the equipment is poor, mainly for the extruder.
Repair capacity and technology are insufficient. This results in a long maintenance cycle. It is hoped that the maintenance personnel will be able to have excellent skills.
5.Production & Safety Management.
The safety management is not enough, the safety operation system is not perfect, the safety training is not in place, and the safety hazards found in the inspection are not in place.
There is no serious point or no safety management system.
Penalties should be dealt with immediately before the safety accident occurs, and only in this way can the potential safety hazards be completely eliminated. For this reason, in the future work, if the potential safety hazards are not pointed out or dealt with, we will severely punish the relevant responsible persons.
The rectification of potential safety hazards is not timely and thorough.
Therefore, in the future work, no matter how much it takes, as long as the potential safety hazards are found, as long as they do not meet the safety management regulations, they must resolutely carry out rectification to the letter, and arrange for the person responsible for rectification to rectify within a time limit. Where the rectification is not complete, the person responsible for the rectification shall be seriously dealt with.
The phenomenon of illegal operation still exists, but it has not been completely eliminated.
In the process of work, employees do not operate in strict accordance with the operating procedures.
operation, so in the future, employees will be trained in relevant work instructions. And strictly require employees to work correctly.
-
The production workshop should check the production equipment before production, in case there is a fault during the production, and find the fitter of the technical department to check it again.
-
Safe production, prevention is better than prevention.
-
Through your description, you can't tell what your workshop is producing, you better go to the Internet to find relevant information!
-
Hello dear, glad to answer for you! Waste and improvement in the production workshop: family belt 1
Waste: (1) Material waste: Due to improper material procurement, it is easy to cause excessive consumption, resulting in waste of resources.
2) Process waste: Because there is no good management in the process, the operation takes too long, which is easy to cause labor waste, and may also cause damage to tools and equipment. (3) Inspection waste:
If the inspection is insufficient, then many non-conforming products may be produced, resulting in a waste of financial resources and time. 2.Improvements:
1) Improve material procurement: strengthen the management of material procurement, control the consumption of materials, and reduce the waste of materials. (2) Improve the process of Zhaoyun Lu management
Establish a sound process management system to improve work efficiency and reduce labor waste. (3) Strengthen inspection: establish a sound inspection system to ensure product quality, reduce the appearance of nonconforming products, and reduce the waste of inspection.
-
Summary. Hello dear, glad for your question oh <>
About workshop on-site problems and improvements: Hello, dear. Question 1:
Management is chaotic, production and storage are not separated. In order to save trouble and convenience, some enterprises store the raw material paper and printed paper in the printing workshop, and the production workshop is also the raw material warehouse and the finished product warehouse, and the production and storage are mixed into one, and some even set up the production workshop, storage warehouse and staff collective dormitory in the same building. Solution 1:
The factory area should be reasonably arranged. Strictly separate the production area, storage area and living area; The ink, paper and other materials used in printing should strictly abide by the principle of "use and receive", and should not be backlogged; The finished products and scraps of the workshop should be cleaned up in time, and the channel line should be drawn to keep the workshop channel unblocked.
Workshop on-site problems and improvements.
Hello dear, glad for your question oh <>
About the workshop site problems and the improvement of the wild stuffiness: Hello, dear. Question 1:
Management is chaotic, production and storage are not separated. In order to save trouble and convenience, some enterprises store the raw material paper and printed paper in the printing workshop, and the production workshop is also the raw material warehouse and the finished product warehouse, and the production and storage are mixed into one, and some even set up the production workshop, storage warehouse and staff collective dormitory in the same building. Solution 1:
The factory area should be reasonably arranged. Strictly separate the production area, storage area and living area; The ink, paper and potato albums and other materials used in printing should strictly abide by the principle of "use and receive", and should not be backlogged; The finished products and macro scraps of the lower number of ridges in the workshop should be cleaned up in time, and the channel line should be drawn to keep the workshop channel unblocked.
Supplement: Problem 2: The passage is not smooth, and the materials are stacked illegally.
The layout of some enterprises is unreasonable, no special warehouses are set up, raw materials, finished products, and production wastes are piled up everywhere, blocking fire passages, and illegal construction has caused great difficulties to the evacuation of personnel. Countermeasure 2: Set up a special warehouse for hazardous chemicals and an ink configuration site.
Dangerous chemicals such as inks and thinners are placed in a special warehouse, and a special person is assigned to take care of them, and the entry and exit of the warehouse must be registered. When the ink is blended, it must be in a specific place, and it is not allowed to mix the ink in the workshop, and the principle of "slow, uniform and less" must be followed when blending to prevent the explosion of open flames in the process of ink mixing. Question 3:
Excessive storage of hazardous chemicals. The ink used in printing, the steam stove used to clean the printing equipment, the thinner used to blend the ink and other items are flammable and dangerous chemicals, but many enterprises do not set up a special warehouse, casually placed in the corner of the workshop, and the amount is relatively large, the wiping equipment, the drum of the rag is thrown at will, once it encounters an open flame, the consequences are unimaginable. Countermeasure 3:
Standardize the electrical facilities of the printing workshop. Hazardous chemicals such as inks and thinners used in the printing workshop will release a large amount of flammable gas, so the electrical appliances in the workshop should be explosion-proof electrical appliances, and the wires must be casing, and it is forbidden to pull them at will temporarily; The main spring lifting equipment should be well grounded with electrostatic grounding measures, and leakage protection measures should be installed as required; No items shall be stacked underneath the electrical appliances
Establish standard working hours and determine a reasonable amount of labor. Establishing a reward system and giving appropriate incentives for labor that exceeds the standard amount can improve the motivation of employees. Regarding productivity and efficiency, first of all, the time consumption of various times in a day is counted, including working time, waiting time, and waiting time for changing specifications. >>>More
The company's production workshop has these departments: electronic assembly department, injection molding department, fuel injection department, electronic additional department, wooden box department, and paint department. >>>More
How to make the paint gas discharged by the exhaust of the water curtain machine odorless.
Common problems manifest themselves in the following areas. >>>More
The depreciation and maintenance of machinery and equipment in the production workshop are included in the manufacturing expense account. >>>More