How many days does it take to renovate the bathroom, how many days does it take to renovate the bath

Updated on home 2024-07-04
32 answers
  1. Anonymous users2024-02-12

    Do the math how much it will cost you to renovate your home

    The bathroom decoration takes about 10 days, including 3 days for foundation demolition and water and electricity transformation, 3 days for waterproofing, 3 days for pipeline sound insulation measures and masonry engineering, and finally installation of ceilings and sanitary ware, a total of about 10 days. Of course, it depends on the actual area, etc.

    1. Foundation demolition and hydropower transformation.

    The foundation demolition and renovation is aimed at the space that needs to be changed in the layout of the house, and the hydropower renovation is the focus of home decoration, and the water pipe into the wall, the line wiring of the lamp and other treatments, and the construction should be carried out in strict accordance with the standard process to ensure the quality of the bathroom decoration and facilitate the later maintenance and maintenance.

    2. Waterproof project.

    The toilet water consumption is relatively large, and waterproofing as a concealed project, when doing waterproofing, the ground and wall should be carefully painted, especially the junction of the corner should be carefully painted, and the closed water test should be carried out after the waterproof process is completed to ensure the waterproof effect, otherwise the water seepage problem will bring unnecessary trouble to the downstairs neighbors and their own homes.

    3. Pipeline sound insulation measures and masonry works.

    The sewer pipe should be soundproofed in advance, otherwise the upstairs water will emit a large water flow sound through the sewer pipe, and the way of ensuring the pipe or other materials need to be treated accordingly in advance to avoid noise annoyance.

    The masonry should be paved in strict accordance with the standards of bricklayer construction, so as to avoid the tiles falling off in the later stage and causing unnecessary trouble.

    4. Install the ceiling.

    After installing the ceiling, then install the sanitary ware and do a good job of cleaning and maintenance.

    Enter the area and get the decoration for free**].

    Enter the area and get the decoration for free**].

  2. Anonymous users2024-02-11

    If it is simply a bathroom decoration, then 5 or 6 days can be done, half a day to change the water and electricity, and then do waterproofing, and then close the water experiment the next day to see if there is a leak. If there is no leakage, you can lay wall tiles and floor tiles, and then hang the shed, press the bathroom facilities.

  3. Anonymous users2024-02-10

    If the bathroom is decorated, it is generally enough for two or three days, but it needs to be completely dried before it can be used after decoration, so the general bathroom can only be used for a week after decoration.

  4. Anonymous users2024-02-09

    1. Toilet decoration, the longest time is to do waterproof and waterproof test, the general normal situation is a week, if the waterproof test fails, need to rework, it will take a few more days.

    2. Others are: laying clean water pipes and sewage pipes, backfilling the settlement layer, pasting wall and floor tiles, hanging ceilings, installing sanitary equipment, connecting electricity, and installing electrical appliances. Among them, there are also such as the setting time of cement, which generally takes at least half a month.

    Hope mine can help you.

  5. Anonymous users2024-02-08

    It depends on the size of the bathroom, it takes about a week, because you must first do a good job of waterproofing before you can paste the wall tiles and floor tiles, if the waterproofing is not done well, then you will affect the downstairs.

  6. Anonymous users2024-02-07

    A: Under normal circumstances, it takes about two days, and the specific time depends on the decoration content.

  7. Anonymous users2024-02-06

    You see that the complexity of the decoration is not complicated, if it is complicated and takes three days, it is almost the same as one day.

  8. Anonymous users2024-02-05

    Four or five days, do waterproof pipes, tiles, floor tiles and then ceilings, although the bathroom is small, but a lot of money.

  9. Anonymous users2024-02-04

    There is no certain regulation here, depending on the worker's skill and the degree and grade of the decoration you want to decorate, the construction period is determined. In fact, it can be for a few days, as long as the quality is guaranteed.

  10. Anonymous users2024-02-03

    There is no certainty in this kind of thing, and it should be decided with reference to the high and low grades.

  11. Anonymous users2024-02-02

    It takes about a week for regular decoration, and it is said that it is because some are less than a week, and some are more than a week. You can ask the invited decorator how many days it will take, and it will be clear.

  12. Anonymous users2024-02-01

    The decoration style of the bathroom is very importantThe decoration style of the bathroom is particularly important, which also needs to be decorated according to the overall layout, and it cannot be transformed as you like. This is also a very bad performance, so everyone needs to pay good attention to it. If you want to redecorate the bathroom, then you also need to buy relevant materials according to the overall pattern.

  13. Anonymous users2024-01-31

    It takes about a week, and generally speaking, refurbishment will be much more complicated than new fit. There are many contents of bathroom waterway renovation, including the installation location of washbasins, toilets, bathtubs and washing machines.

  14. Anonymous users2024-01-30

    The bathroom is redecorated and generally takes a week if the action is fast, and about half a month if the action is slow.

  15. Anonymous users2024-01-29

    It takes half a month, and it also needs to be decided according to the style of decoration and the complexity of the decoration, if it is simple, it will not take too much time.

  16. Anonymous users2024-01-28

    Latest. 1. After it is done, it is to stick the floor tiles and wall tiles, generally speaking, the decoration is to do the water and electricity part (including the laying of wires and pipelines, washbasin) and kitchen components (the whole kitchen, shower, painter, etc.) can be installed sanitary ware (toilet, microwave oven, etc.), the laying of water pipes), refrigerator, after the completion of other processes (including carpentry).

    2. Basic water and electricity, and then the kitchen and toilet. But landlord, you're asking too strangely, isn't it?

    3. Bathroom decoration is divided into 3 processes: the first process transforms hydropower and can be carried out at the same time as the overall hydropower transformation; In the second process, porcelain tiles can be pasted after hydropower transformation; Finally, the installation of toilets, bath cabinets, pendants, etc. can be put into the last installation, which is conducive to the protection of sanitary ware products!

    When will it be renovated.

    Let's start with spring renovations. China has always had the habit of building houses and repairing houses in spring, which is due to the comprehensive influence of geography, climate, environment, culture and consumption habits. Second, many real estate projects are delivered at the end of the year.

    In January and February, there was a new house, but it caught up with the New Year, and the buyers, sellers, and decoration workers were busy with the New Year.

    After the mistake, the natural decoration is about to rush to the spring. Third, wood materials account for the majority in the decoration process, and the air humidity has a great impact on wood. The spring is drier, the moisture content of the wood is low, the thermal expansion and cold contraction change is small, and the weather is warm and the windows are opened for ventilation, which is conducive to painting and drying and shortening the construction period.

    Fourth, there are many southerners engaged in decoration work, and after the Spring Festival, they are very popular, and the weather is warmer, which is very suitable for their construction. In short, spring is the peak season for decoration, which has both traditional influences and practical factors, so decoration merchants are also willing to do enough trading "articles" in this season. Look at the summer renovations.

    In the four seasons, whether in the south or in the north, people choose this season for decoration less, mainly because of the rain in summer, the air humidity is high, and the wood products are made.

  17. Anonymous users2024-01-27

    Home decoration sequence: 1 water, electricity and heating pipelines and wiring laying, 2 bathroom waterproof construction, 3 all tile pasting (including bathroom kitchen wall, floor tiles), 4 TV background wall construction, guest, sleeping gypsum board and kitchen and bathroom integrated ceiling, 5 indoor latex paint or other wall decoration construction, 6 indoor doors, bedroom cabinets and kitchen cabinet installation, bathroom basins, toilets, showers and other facilities installation. 7. Installation of switches, sockets and lamps.

    8. Cleaning to remove formaldehyde and other harmful gases, 9. All furniture and household appliances are placed and installed in place, 10. You can move in after cleaning and removing harmful gases again.

  18. Anonymous users2024-01-26

    It is more troublesome to decorate toilets and toilets, and it is cement sand, and waterproof tests must be done. Therefore, when decorating, the bathroom and toilet are installed first, and then the overall decoration is carried out.

  19. Anonymous users2024-01-25

    Generally, the water and electricity pipelines of the room and bathroom are made first, and then the waterproof treatment of the bathroom is done, and the tiles are pasted after there is no water leakage.

  20. Anonymous users2024-01-24

    The income of decoration to decorate the toilet, then first of all, after the water and electricity are renovated, do waterproofing and waterproofing, and after the other rooms have been tiled, and then paste the bathroom tiles. After finishing yesterday, if you decorate, you can decorate the bathroom first, and then decorate other places.

  21. Anonymous users2024-01-23

    How much time does it take to dismantle and redecorate the bathroom! Hello, I am glad to give you the answer to the <> bathroom demolition and redecoration needs 2-3 days of time to expand the information to renovate the first thing to chisel the floor tiles and part or all of the wall tiles, if it goes well, it generally takes a day or two to change the room, and then the ground and the wall are repaired and leveled, and then the waterproofing is redone. The process of doing waterproof and closed water test generally takes 2 to 3 days, and it takes about 3 days to re-attach floor tiles and wall tiles in the case of one person operation.

    In this way, it will add up to at least a week. Hope mine can help you <>

    Do you have any other questions?

  22. Anonymous users2024-01-22

    After the house decoration water and electricity construction, in the construction process in accordance with the specific installation requirements and technical parameters of the purchased bathroom cleaning products to reserve space, bathroom product models, brands are different, there will be certain differences in installation;

    When the user installs the bathroom, he must ask a professional master to avoid the problem of water leakage in the later bathroom installation, due to the different bathroom products, the installation requirements are also different, such as faucets, toilets, floor drains, shower rooms and bathroom cabinets, etc., when installing the layout of punching holes and pipes.

    The bathroom must be set before construction, because once the overall decoration style of the room is determined, it must be constructed in accordance with the relevant drawings; Then in the process of construction, the size of the space will be reserved in accordance with the requirements and technical parameters of the set bathroom products.

  23. Anonymous users2024-01-21

    Bathrooms should be installed at the time of installation of interior doors. At this time.

    At this time, all the tiles should be laid, the wall paint, wallpaper finished, the integrated ceiling and bath bomb installed should be completed.

    After the bathroom installation is completed, all that remains is the installation of the lamps and appliances. The lamps should be left last, because many crystal lamps and modeling lamps are easy to get dirty. However, after the wiring is completed in the early stage, before the ceiling, the circuit must be tested.

    Generally, we are required, so after the lamp port is installed, the light will be on for more than 12 hours. to make sure there are no problems with the line.

  24. Anonymous users2024-01-20

    Many people will consider the renovation time before decorating the house, how much time does the decoration generally take? Today, I will answer them for you one by one.

    In fact, there is no fixed answer to how long it takes to renovate a house, because the length of renovation is related to many factors, such as the size of the house, the number of workers, etc. Under normal circumstances, the normal decoration of about 100 square meters has a construction period of 40-60 days, and the specific details are determined according to the on-site decoration project and engineering quantity.

    1. First of all, hydropower and bricklayers, it takes 20 25 days, of which 1 2 days for demolition and renovation projects, 4 10 days for hydropower projects, 3 7 days for waterproof projects, about 10 days for bricklayers, and 1 day for the acceptance of concealed projects;

    2. At the same time, the carpenter needs 15 to 20 days for the wood production of the frame, and it takes 5 to 10 days for the finish and closing;

    3. After that, it takes 10 to 15 days for the oilman to enter the site, including wood for primer, wood for topcoat, wall scraping putty and latex paint;

    4. It takes 4 to 6 days to install wooden doors, floors, cabinets, switches, sockets, lamps, sanitary ware and hardware at the end.

  25. Anonymous users2024-01-19

    How long does it take to renovate? Decoration can be slow or fast, mainly depending on how big your room is and what materials are used to decorate? How many people will be used for construction? Knowing this is the only way to judge the length of time.

  26. Anonymous users2024-01-18

    The fastest will take 3 months, which refers to the general size of about 100 square meters of flat floors, but it is not recommended to install fast, and many faster installations will be omitted.

  27. Anonymous users2024-01-17

    Under normal circumstances, the normal decoration of about 100 square meters has a construction period of 40-60 days, and the details should be related to the on-site decoration project and engineering quantity.

  28. Anonymous users2024-01-16

    3 months 4 months, generally please decoration company.

    To decorate, it will take 3 to 4 months. If it's yourself.

    Find someone to pretend to be within three months.

  29. Anonymous users2024-01-15

    My home is being renovated, and the decoration company signed a 40-day contract, because the community is not allowed to start construction on holidays, and it will be completed in 50 days. The house is 140 square meters.

  30. Anonymous users2024-01-14

    How long does it take to renovate? The renovation time of the house is determined according to the decoration standard (80-100 square meters).

    If it is just a simple renovation, it only takes 18-22 days to complete it.

    If you want a normal renovation, it generally takes 28-32 days.

    If it is a low-end fine decoration, it generally takes 55-65 days to complete.

    If you want to decorate in a high-end or luxurious way, it will take 80-90 days.

    FYI...

  31. Anonymous users2024-01-13

    Hello landlord: The general decoration company stipulates that the time is 45 days, and all of them are completed, which is theoretically possible! However, if there are additions or decreases in the construction process, the construction period will be appropriately postponed!! It depends on your contract, and this thing will be done soon.

  32. Anonymous users2024-01-12

    Generally, the bathroom can be used for about 3 days after decoration, but it also depends on the actual situation, depending on the degree of cement solidification. If the temperature is relatively high and the indoor is relatively dry, it can be used in about two days, if the temperature is relatively low and the indoor is more humid, it is best to use it after a week, so as to avoid problems such as bulging and leakage of tiles.

    What to pay attention to in bathroom decoration 1, pay attention to lighting.

    In the decoration design of the family bathroom, the first thing to pay attention to is the lighting problem, including natural light and lighting. Usually, a well-lit bright bathroom can use light-colored tiles, such as white, beige, etc., which will make the space look more spacious and bright. In general, the lighting of the master bedroom bathroom is not so ideal, so it is necessary to consider the adjustment of light and the reflection of tiles when decorating and designing.

    At the same time, whether it is a bright or dark bathroom, it is recommended to use soft tones for lighting, and it is not recommended to use direct lighting.

    2. Pay attention to ventilation.

    In the home living space, the bathroom is a place that is very easy to be wet, so the bathroom decoration design should also pay attention to the ventilation problem, good ventilation is one of the basic conditions to keep the bathroom clean, dry and tidy. The owner needs to pay attention to the fact that the bathroom decoration design now adopts the design of dry and wet separation of residual oak or three separation, and ventilation and drying must be done.

    3. Pay attention to the design function.

    Generally, the functional partition requirements for the toilet are relatively high, and it is necessary to meet the different functional partitions such as toilets, showers, and bathtubs. Of course, it can be designed according to the preferences of family members and the overall decoration style of the home, so as to maximize the utilization rate of space functions and achieve the strongest and most practical functional partitions.

    4. Pay attention to drainage.

    In addition to visible lighting and ventilation, bathroom decoration design should also pay special attention to the design and construction of hidden projects - drainage system, drainage layout is directly related to the future household water situation, so the construction process must be personally followed up and accepted, so as to avoid some unnecessary troubles after moving in.

    5. Pay attention to the overall decorative effect.

    In addition to the practical function, the decoration of the bathroom decoration design should not be underestimated. Whether at work or in life, there is no return to destroy only people will reject beautiful things, and do a good job of decorating the bathroom, will make your life have another beautiful scenery. For example, carefully choose the colors and decorative paintings you like, and carefully create an exclusive bathroom space with a personalized leakage, you will find that daily life will bring a lot of happy time.

Related questions
5 answers2024-07-04

RV decoration whole bathroom is a good choice.

The whole toilet includes a lot, and the bathroom, toilet and toilet are all made independent to maximize the function in the limited space. In its material selection is a little higher, the material is not only thermal insulation, but also anti-aging, but also has a beautiful effect, so the overall bathroom will be higher than the traditional one. The overall bathroom is determined by hardware, sanitary ware, lighting and water and electricity systems, and cost-effective products can not only ensure quality, but also shorten the decoration time, which brings convenience to us. >>>More

15 answers2024-07-04

Everyone wants to decorate their home with a different beautiful effect, and the same small bathroom is no exception. If you want to install a chic bathroom, you must choose the right color of the bathroom tiles. The perfect matching of bathroom tile colors can make the bathroom look more neat and beautiful. >>>More

6 answers2024-07-04

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

11 answers2024-07-04

Bathroom odor prevention tricks?

1. Exhaust measures. >>>More

22 answers2024-07-04

Tile joints can effectively solve the problems of blackening, falling off, and peculiar smell between the gaps of ceramic tiles. >>>More