Staring at the decoration mainly focuses on three points, the first is to stare at the materials, the second is to stare at the quality of the work, and the third is to stare at some hidden locations. Decoration is indeed a hard work, if there is no home staring, it is easy to often have this or such a problem, because you are not personally seen, so they let you do what deceptive things in the decoration process you are not clear. So if you are focusing on decoration at home, what part do you need to focus on?
Let's make a point from the following three points.
Keep an eye on the decoration materials
I admire the owner of some money, he handed over the car keys to the decoration staff, and then went to what to do, in fact, you have not counted, in the process of use, whether they have due to shoddy to take the rest of the materials halfway you are not clear, so if you are staring at home in the situation, you should have a certain grasp of your decoration materials, and let them use the method of saving to achieve the best results. The most important cost of decoration is two parts, one part is the material money, the other part is the labor money, and everyone must ensure that the materials are well known.
Keep an eye on the quality of the work
Decoration in addition to the material is manual, so in the case of staff operations, we need to supervise, to see what they are not up to the mark, in the case of finding that it is not up to the mark, immediately put forward, for example, in the case of floor tiles, the brick joints are uneven on the ground or whether they are leveled, these can immediately remind them to correct. Some construction projects are very difficult to correct after the construction is completed, and it is best to correct the mistakes immediately when they are discovered during the construction process, so in some ways, keeping an eye on their work allows them to meet their own expectations at the time to the greatest extent.
Keep an eye on a hidden location
Employees are lazy habits, there are some well-organized positions that are not easy to be found by others, where it is the easiest to shoddy, so when the staff does some more secretive operation, we must observe the delicate, to see if he has the intention of safe engineering construction.
-
The main thing is to see if the worker is doing a good job, whether he is lazy, and whether the worker is cutting corners.
-
The main thing is to see whether they are very careful and meticulous in their work, and whether they do something very well.
-
See whether these renovation workers work hard or not, and see if these workers do their jobs very well.
-
It is mainly to focus on whether the workers are working hard, whether they are cutting corners, whether they are slacking off, and whether they are dealing with the details, so they will stare at the work of the workers.
-
There is no need, just look at some important steps, and then after the decoration results come out, the decoration will be inspected to a certain extent.
-
It is necessary to supervise the work every day when you have more free time, on the one hand, to improve the efficiency of decoration, on the other hand, you can choose your own decoration style more clearly, and improve the deficiencies.
-
If you don't look at it every day, maybe the people of the renovation company will make their own decisions and pretend to be very unsatisfactory to you.
-
To keep an eye on the door frame that someone else has given to renovate, this place is easy to cut corners. The second is that you must look good when painting, otherwise the level of painting will be ugly. Then there are some small aspects, which also need to be carefully watched, otherwise it is easy to make mistakes.
-
Of course, when decorating the house, you need to keep an eye on the work, that is, to see how the workers' skills are, to see if they have cut corners, or to see if they have achieved the results that you are satisfied with.
-
Because it is an important thing when decorating a house, we have to keep an eye on some people, don't be lazy, and they will exchange the materials we buy, which is not good for our decoration.
-
It is necessary to keep an eye on the demolition site, hydropower construction, and bricklayer construction. The reason is that these constructions are prone to hidden quality problems, and it is difficult to find them after the decoration is completed.
When decorating at home, we must keep an eye on the demolition site, understand the demolition plan before starting the demolition, whether the construction personnel have carried out safe and effective demolition during the demolition process, and whether it can be consistent with the demolition plan, these are all contents that need to be determined by ourselves. In the process of nailing, it is necessary to ensure that the construction workers can not dismantle the wrong one, especially the load-bearing wall, otherwise it will damage other pipelines, and the overall structure of the house will be damaged, leaving potential safety hazards.
When keeping an eye on the demolition site of the renovation, it is necessary to urge the workers to clean up all the garbage that has been produced and dismantled, and then start the water and electricity construction. Before starting the hydropower construction, you should explain your requirements to the renovation workers, and then you should have your own opinions, and do not change your requirements casually because of the suggestions of the decoration company. When the hydropower materials enter the site, they should be accepted on the spot, and the best problems should be raised in time and the decoration company should be urged to rectify.
The decoration of their own home must be set hydropower construction, because the quality of hydropower construction is directly related to the future life, when staring at the scene, the hydropower construction drawings should be prepared, to see whether the construction workers are in accordance with the drawings for construction, but also when slotting, we must pay attention to safety and look at whether the construction staff steal beams and columns, replace the original materials with inferior hydropower materials, after the completion of hydropower construction, do a water leakage test to ensure safety before they can carry out the next step of decoration.
When decorating their own home, the bricklayer construction also needs to be set on the spot, because there are many pipes in the kitchen balcony when decorating, as well as the air duct of the bathroom need to be wrapped with bricks and then tiled, if you don't stare at it, there will be problems in the construction of these pipes, some will not be professionally treated, and some will not be wrapped up with bricks, directly pasted with bricks, which will make his sound insulation effect greatly reduced.
-
If you decorate your own home, then you need to understand the relevant knowledge, and you can't be a bystander like watching the excitement, you must have your own opinions, and you can't say what the decoration company says. It is believed that the owner needs to have an overall understanding of his home, and he cannot understand nothing, otherwise it is easy to be fooled by the decoration company, which will affect his quality of life in the future use process, and will also bring bad enjoyment, which will make people's mood worse, and it is not easy to solve. <>
People must first do a good job in the review of decoration materials, and must see whether the brand, specifications and materials are the same as their expectations, which has a great relationship with their own decoration costs. After the materials enter the room, it is necessary to check the quantity, size, model and function, so that the appearance of problems can be reduced in the process of decoration, and some unnecessary troubles will be reduced. People can check whether the materials are complete, but also need to see if there are scratches on the surface of the object, and if the quality is not good, then they can be replaced in time.
If people want to install sockets in their homes, they need to discuss with the decoration company in time, and they must not damage the wall material of the room, so they must observe more. People need to pay attention to whether there are some problems in the process of tiling, and need to check whether there are hollow wall tiles and uneven gaps. People need to do a good job of waterproofing in the room, and do a good job of moisture-proof measures, otherwise in the process of the future, there will be a stinky situation, be sure to ask professionals, and can not blindly obey the decoration personnel.
People want to check whether the sewer pipe is blocked, but also pay attention to the sound insulation, if they find that something is wrong, they need to communicate with the master in time. In order to save trouble during the decoration process, some masters will throw some waste residue from construction into the toilet, which can easily cause the toilet to be blocked, and it will be more difficult to deal with it later. People also need to check for problems with water pipes and circuits, which are buried under the cement and difficult to solve problems in the future, so be sure to look closely.
-
We should focus on the renovation of water and electricity, we should look at the quality of the materials of the pipes, whether the furniture selected by the decoration company is the same as the furniture you signed in the contract, how well the waterproofing of the whole house is done, and we should also pay attention to the problem of fire when decorating. These questions are the most basic and often used in our lives, so safety must be put first.
-
It depends on the location and positioning of the wires in the home, whether the materials meet the relevant standards, and then depends on some hidden projects, such as floor drain materials, water pipe materials, etc. The materials are easy to guide, and these projects are all hidden projects, and we don't know about them at all in the later stage, so we must see them in advance.
-
I think the most important thing is to see if the master has cut corners and is lazy; Especially in those more hidden places, if you are not optimistic at the time, you will not be able to determine the quality problem later, and the marking is actually to play a certain role in supervising and inspecting.
-
Attention should be paid to the work of water and electricity and the work of the floor during the renovation process, which are very important.
-
It is necessary to keep an eye on the demolition site, hydropower construction, bricklayer construction. Because this kind of building is likely to have hidden quality problems, it is difficult to find out when they are finished before they can be inspected.
Before the demolition, it is necessary to figure out the plan of the demolition, and whether the workers in the demolition work have carried out safe and effective demolition, and whether it is in line with the demolition plan depends on the specific situation. When installing, be careful not to disassemble the wrong one, especially not to remove the load-bearing wall, otherwise it will damage other pipes, damage the structure of the house, and cause safety problems.
When inspecting the demolition site, it is also necessary to ask the workers on the site to remove all the waste materials generated, and then you can start the work. Before carrying out hydraulic construction, you should explain your needs to the renovation staff, and at this time, you should have your own ideas, and you should not change your needs at will due to the opinions of the decoration company. Carry out the inspection of hydraulic engineering and building materials at the construction site, and report to the construction unit immediately and ask it to correct once there is a problem.
Water and water at home must be booked first, after all, the quality of water and electricity will affect their future, on the construction site to do a good job of water and water planning, to see if the construction of the acre team has in accordance with the design drawings, and in the process of slotting, special attention should be paid to ensure that their staff will not be in stealing beams and columns, with low-grade water and water to replace the original materials, after the end of the hydropower project, to test the waterproof, to ensure that nothing goes wrong, and then carry out the next decoration.
The decoration of the home is to be done on the construction site, after all, in the process of doing, there are many pipes and ventilation pipes to be sealed with bricks, and then pasted with floor tiles, if you don't look carefully, there will definitely be problems, some people will not do special work, some people will not even cover it with bricks, but build it with bricks, which will affect his silence, and in the later stage, it will be more difficult. What are your thoughts on this? Welcome Liu Yang's comments and exchanges.
-
The first-order link that the owner needs to set is the review of the design drawings, the acceptance of the entry site, the acceptance of each process, and the key inspection of the hidden project.
-
When decorating the bathroom, kitchen, and wardrobe, the owner must keep an eye on it.
-
During the renovation construction process, the owner needs to keep an eye on whether the workers are cutting corners and whether they are carried out in accordance with the drawings provided.
-
Talk about those things about decoration and share experience and knowledge about various decorations. Everybody is so nice! I'm talking about decoration, and those who follow me can know more about decoration!
Whether you are looking for a decoration company or decorating by yourself or not at ease, you still have to go to the construction site every day to stare at when decorating, so that as an owner who does not understand decoration, what does it take to stare at the site every day to play the role of staring? If you just look blindly every day, it's actually meaningless. Next, let's talk about the concerns of many people who decorate.
<> water and electricity can be known to be grooved in the floor. In addition, when slotting, we must believe in the method of horizontal and vertical straightening, because many times workers will easily pull the line, so that the problem of non-standard pipe threading may occur during the final construction. So it's also a strict treatment when staring at work.
The groove made by a good slotter master is basically a straight line, and there is no burr on the groove. If it is inevitable to open the transverse groove, the length of the transverse groove should be controlled at about 50cm, and the transverse groove of the load-bearing wall should be controlled at 20-30cm.
Don't appear on the type of work is done, the next type of work and construction, no one has come to work for him for more than ten days, especially in the later stage of advocating the installation of materials, we must coordinate the order of all materials, if the decoration company wants to communicate with the project manager to be responsible for decorating so much, which ensures that the decoration company completes a project within a reasonable time limit. This is also the advantage of staring at the scene to give full play to the advantages of communication and solve things in the first time.
Do a detailed explanation of the problem for a detailed interpretation of the problem, I hope it will help you, if you have any questions, you can leave me a message in the comment area, you can comment with me a lot, if there is something wrong, you can also interact with me more, if you like the author, you can also follow me, your like is the biggest help to me, thank you. That's all for sharing, if you like me, please follow me. If you guys have anything to think.
The negotiation owner finds a suitable decoration company, tells the other party the requirements, and then listens to the other party's opinions for effective communication and negotiation. >>>More
Generally, it takes about 2 months to decorate, and different stages require different materials to enter the site, so the decoration process should be reasonably arranged. If you are in the south, two 2--4 is not suitable for decoration, mainly because of the wall and the wall is not good, because there is a reason to return to the south, the wall and the ground are hung with water, it is recommended to start decoration in May.
It happened that our house was renovated in April, and because it was a second-hand house, it was simply renovated. When I see this problem, let's take a brief look at it, which can give you a reference. Let's talk about the general situation first, my house is a two-bedroom apartment, about 87 square meters. >>>More
Not necessarily. Bedside tables are of little use, so you don't have to put them on your bedside tables.
When decorating the basement, we should pay attention to lighting, save a certain amount of space, and play a role in storage.