Before bricking, it is necessary to understand the interrelationship and function of the support points, load-bearing beams and floor slabs below. Alone talk about building walls on concrete on load-bearing beams, buildingScaffoldingThe next day you can immediately build a wall on the wall(All the bricks, sand and plaster, and workers are walking around on the outside shelves, which is not easy to endanger the floor slabs poured from the internal structure). If you build scaffolding indoors and move bricks indoors to build walls, you will have to wait two days.
When you make concrete in the countryside, how many days can you build a wall with bricks? This has a great correlation with air temperature and temperature. Playing concrete, encountering rainy weather, building walls in the construction of the law.
Comparatively speaking, the time taken to apply the bricks will be extended.
In the case of strong temperature in summer, many people in the village are in a hurry, and in the case of 5 or 7 days, they use the method of picking up trucks to pull bricks. The temperature is high, and the cement pressure plate.
Although the concrete sets faster, the maintenance may take more than ten days. In a short period of time, the bottom is laid with bamboo ribs (woodworking boards) of all the frame molds, and it is inevitable that there will be bumps when the bricks are loaded, and there will be areas that you have not noticed. Use the bamboo rib board of the frame mold to pave the bottom, which has the maintenance effect on the floor slab, and the posture should be as light as possible when placing the bricks to prevent damage to the floor slab.
Because the temperature change is relatively large, but the temperature is relatively high, and the temperature is generally relatively dry, at this time, most of the concrete of the general floor slab can be used to carry out wall masonry after pouring concrete for about seven days. Because the concrete sets at normal temperatures, it is or relatively fast. Therefore, it is only necessary for concrete to be condensed to achieve a certain compressive strength.
And to reach the corresponding support point, it is all possible to go up the brick wall. If you want to get bricks for concrete slabs poured in winter, most of them should be kept above half a month, and the temperature should be above zero.
For the construction of a house, you must be concerned about the change of temperature, in the case of especially low temperature, it is not recommended to carry out concrete engineering construction. How long after the concrete pouring of the floor slab can be bricked, the main thing here is actually the main concern of the temperature. For example, when the temperature is above 30, most of the four or five days can actually be bricked.
However, if the temperature is only in the teens, it will take at least two weeks or so. If the temperature is lower, you should always pay attention to the compressive strength of the concrete, and finally determine whether it can be bricked.
-
Generally, it can be bricked in about 7 to 14 days. First of all, we should see whether the concrete is dry, whether the concrete is evenly separated, and whether the foundation is stable.
-
As for how long it takes to go up to build the wall after the floor slab is poured, my personal opinion is that it should be guaranteed for at least five days in summer, and it is generally two weeks in winter. It depends on the local temperature conditions. In the summer when the temperature is relatively high, the concrete of the floor slab can basically be bricked after five days of pouring.
-
In the summer when the temperature is high, many rural people in order to hurry, there are 5 or 7 days, with people picking up cars to pull the bricks. The temperature is high, the maintenance of the cement board should be paid attention to at all times, although the solidification speed of the cement is fast, but the maintenance still takes more than ten days. In this short period of time, the bamboo rib board (wooden board) used to set the mold is used to pad the bottom, and it is inevitable that there will be bumps and bumps when the bricks are loaded, and there will be places that you have not noticed.
Use the bamboo rib board of the mold to cushion the bottom to protect the floor slab, and try to light the action when placing the bricks to avoid damage to the floor slab.
-
1. After the final setting of the concrete, the cast-in-place slab should be watered and cured in time;
2. Generally, the next day after pouring, the Venerable Master will start to put the line on the floor and play the ink line of the wall;
3. After the pay-off is completed, the person can install the column or the structural column reinforcement;
4. In the first few days of concrete, the early strength is low, the lifting material should not be too much, can not be stacked on the floor, must be scattered and stacked, the stacked material should not be placed in the middle of the cast-in-place plate, all materials are handled lightly, to avoid external impact on the cast-in-place plate.
-
Cast-in-place concrete can be bricked on it for a few days! Hello, I am happy to answer for you<> Sen teasing the rural cast-in-place floor slab, after pouring, you need to wait two days before laying bricks. There are a few things to keep in mind here, though:
After the concrete in the cast-in-place slab is condensed, it needs to be sprinkled with water in time for maintenance; On the second day after pouring, it is necessary to lay out the floor and play the ink line of the wall; After the pay-off project is completed, the column or structural column reinforcement can be installed. In order to meet the needs of the construction period, the cast-in-place floor slab is generally built on the brick wall two days after pouring, but attention must be paid to related problems: 1. After the final setting of the concrete, the cast-in-place slab should be sprinkled and maintained in time; 2. Generally, the next day after pouring, the Venerable Master will start to put the line on the floor and play the ink line of the wall; 3. After the pay-off is completed, the person can install the column or the structural column reinforcement; 4. In the first few days of concrete, the early strength is low, the lifting material should not be too much, can not be stacked on the floor, must be scattered and stacked, the stacked material should not be placed in the middle of the cast-in-place plate, all materials are handled lightly, to avoid external impact on the cast-in-place plate.
Hope mine can help you <>
Do you have any other questions?
-
Summary. : If you want to brick the concrete floor slab poured in winter, I personally think that it should be kept for more than two weeks, and it should be when the temperature is above zero. If the temperature reaches below zero, and there is no corresponding insulation measures, it is basically difficult to put on the bricks.
Until the air temperature reaches above zero, after the solidification conditions of the concrete are met. Therefore, for building a house in winter, we must pay attention to the change of temperature, and in the case of particularly low temperature, it is not recommended that we carry out concrete construction.
How long does it take for the floor of a self-built house in a rural area to be bricked after the concrete is poured?
In the summer when the temperature is relatively high, the concrete of the floor slab can basically be bricked after five days of pouring. Like pouring concrete in summer, it will basically reach a certain strength after 24 hours, so in summer, it is generally carried out the next day.
After that, after waiting for three oranges and four days, you can basically go up to the brick wall. So in the summer conditions, the waiting time is very short.
In the spring and autumn seasons, due to the large temperature change, but the temperature is relatively high, and the weather is generally relatively dry and dry, at this time, the concrete of the general floor slab can basically go up to build the wall in the pouring time of about seven days or more. Because the concrete is still relatively fast to solidify at normal temperatures.
Therefore, as long as the concrete solidifies to a certain strength, and the pin bench meets the corresponding support, it can be built on the brick wall.
: If you want to brick the concrete floor slab poured in winter, I personally think that it should be kept for more than two weeks, and it should be when the temperature is above zero. If the temperature reaches below zero, and there is no corresponding insulation measure for the spine, it is basically difficult to put on the bricks.
Until the temperature seeps above zero in spring and meets the solidification conditions of concrete. Therefore, for building a house in winter, we must pay attention to the change of temperature, and in the case of particularly low temperature, it is not recommended that we carry out concrete construction.
-
Abstract Hello, dear, after the construction of cast-in-place concrete is completed, it will take about 1 day to lay bricks on it. The setting time of concrete is directly related to the quality of concrete, ambient temperature, and curing. Concrete solidification needs to go through two stages, first initial setting, and then final setting.
After the concrete is stirred with water, it will slowly solidify, this stage is the initial setting, which generally takes 1 to 3 hours, and then it will enter the final setting stage, which takes about 5 to 8 hours.
Cast-in-place concrete can be bricked on it for a few days.
Hello, dear, I have seen your question and am preparing an answer, please wait.
Hello, dear, after the cast-in-place concrete construction is completed, it will take about 1 day to lay bricks on it. The setting time of concrete is directly related to the quality of concrete, ambient temperature, and curing. Concrete solidification needs to go through two stages, first initial setting, and then final setting.
After the concrete is stirred with water, it will slowly solidify, this stage is the initial setting, which generally takes 1 to 3 hours, and then it will enter the final setting stage, which takes about 5 to 8 hours.
-
<> cast-in-place floor slabs can generally be bricked after 7 to 14 days. According to the relevant regulations, there will be different time limits for the use of different materials, generally speaking, after the pouring is completed, wait for 7 days and 14 days before the bricking operation can be carried out, depending on the situation. Season is also one of the factors that limit the time of bricking, in summer, the temperature is higher than that of Qiling, and the time of bricking will be greatly shortened.
In winter, when the temperature is lower, the time for the relatives to put on the bricks will increase. The weather will also be affected, sunny days will be greatly shortened, and rainy days will be delayed. After pouring, it is necessary to use thermal insulation film for protection, which cannot be omitted.
-
Dear, hello, according to the current construction level of cement and concrete houses in rural areas, they can be maintained for 300 years, and scientifically speaking, they can extend their life indefinitely. If my answer is helpful to you, please also give a thumbs up (in the lower left corner of the hole to mark the price), look forward to your like, your efforts are very important to me, and your support is also the driving force for my progress. If you feel that my answer is still satisfactory, you can click on my avatar for one-on-one consultation.
Finally, I wish you good health and a good mood!
Generally speaking, only those who have deposited the housing provident fund can apply for a housing provident fund loan, even if it is a rural household registration, as long as their unit pays the housing provident fund, then they can apply for a housing provident fund loan. The conditions for applying for a housing provident fund loan are: 1. The borrower must have a permanent urban residence or valid residence status in the city; 2. Push forward from the date of application, and pay the housing provident fund in full for more than 12 consecutive months (only one person is allowed to take out a loan if both husband and wife have paid the provident fund); 3. There are contracts (agreements) and related materials for purchasing, building and overhauling self-occupied houses in accordance with the law; 4. Have a certain proportion of self-raised funds. >>>More
If the rural house does not have a property ownership certificate, it should be handled in a timely manner. According to the provisions of the "Housing Registration Measures", the following materials shall be submitted when applying for the initial registration of house ownership due to the legal construction of a house: >>>More
You can clean it first, water the hole after cleaning, and then apply mortar or concrete.
The five elements of self-built house design mainly include kitchen design, living room design, bathroom design, bedroom design and sloping roof design. >>>More
All localities have a set of standards for the homesteads used in rural homesteads that are in line with the actual local people's conditions, and in accordance with the standards, the homesteads for rural housing applications are examined and approved. The standard area of each household base is 80-120 square meters, and each village committee shall determine the standard of homestead area of the village according to the village plan and the actual land use of the village. Generally speaking, the total land area of a 1-2 person farmer household shall not exceed 95 square meters; The total land area of a rural household with 3 or more persons shall not exceed 125 square meters; The total land area of the original site shall not exceed 140 square meters, of which the building area shall be determined according to the planning of the specific plot and related technologies, and the specific standards announced by the local ** department shall prevail. >>>More