At present, there are many old communities, and some indoor facilities are indeed very old, so they have begun to upgrade the old communities. One of them is the upgrading of heating. However, there is also a charge for the renovation of heating in the old community.
So how much does it cost? The home miscellaneous altar takes the following problems as an example to analyze the heating cost of the renovation of the old community.
Is it reasonable to renovate the heating in the old community, 100 yuan per square meter?
The heating renovation of the old community is 100 yuan per square meter, and the view given by the individual is more reasonable. Why is this point given? The following home miscellaneous altar will answer this question from two major aspects:
The cost of dismantling radiators and pipes, and the installation costs of new radiators and pipes. These two components make up the overall cost of the heating renovation.
Fee 1] Heating and plumbing dismantling costs.
The so-called dismantling cost of radiators and pipes means that when we renovate the heating in our old community, the first thing to do is to remove some of the dilapidated radiators in our home, as well as the heating branch pipes and heating risers that are seriously damaged and corroded, and transport them out. These also incur a certain cost.
1. Approximate situation of the cost of demolition. For example, if we remove the heating pipes and radiators separately, if we convert the cost per square meter, it will take about 20 people per square meter. Because demolition is also very labor-intensive, it is not low.
2. Transportation costs. Because we have to remove the heating and heating pipes after they are removed, we will incur additional costs. For example, we move from upstairs to downstairs and then transport from downstairs to various centralized processing sites.
This kind of fee is about 5 yuan per square meter.
General introduction: When we renovate the heating of the old community, the first cost incurred is the cost of demolition and transportation. It costs about 25 yuan per square meter.
-
<> charging standards for heating pipeline renovation vary depending on the region, project scale, equipment selection, etc., generally including the following aspects: 1Design, Survey, Construction Budget CostsIn order to ensure that the heating pipe renovation project can be carried out smoothly, it is necessary to carry out the survey and design before construction, and evaluate the project budget, and these expenses need to be included in the total cost.
2.Construction Cost Heating pipe renovation is a labor-intensive project that requires a certain number of workers to carry out the construction, and the cost of the workers needs to be included in the total cost. 3.
Material cost heating pipe renovation requires the use of pipes, valves, insulation materials and other equipment and materials, the quality of these materials varies due to different brands, models, materials, etc., and needs to be included in the total cost. 4.Other costs may also include transportation costs, clean-up costs, maintenance costs, etc., which are more detailed and need to be assessed on a case-by-case basis.
Therefore, the charging standard for heating pipe renovation needs to be determined in combination with the actual situation, and the owner can grasp the charging standard according to his own needs and budget.
-
The cost of heating renovation in the old community is pro! Hello, happy to answer your <>
The cost standard of heating renovation in the old community is as follows: 1. The heating renovation fee of the old community 1, according to the relevant regulations, when the heat meter is renovated, each charge is 1600 yuan, half of the subsidy is subsidized, and the residents bear 800 yuan. 2. However, the renovation of building insulation and heating pipe network is regulated by the market and does not belong to the pricing range.
Second, how to renovate the heating of the old community 1, open up the passage from the first floor to the top floor of the old community renovation because the original pipeline has already been used, and the time is also very long, and the use of the original pipeline can be more troublesome, labor-intensive, and the original pipeline has also reached the time for maintenance and replacement, in addition to the pipeline is still saving money and effort, and now the pipeline materials are more and more good, lightweight, occupy a small area, and use for a long time. 2. The corner of the corridor is perforated at the corner of the stairs in the corridor, and there is a penetrating hole on the left and right sides, which is made according to the size of the pipe, and the workers and masters do a good job. The position of the hole is placed in the innermost corner, because the pipe is to be walked, so the most corner is the most suitable position.
I hope mine can help you [happy then sell skin]! Do you have any other questions?
-
The charging standard for gas pipeline renovation is: multi-storey residential buildings are charged with a pre-buried fee of 29 yuan per square meter of construction area, and the maximum fee is not more than 3,500 yuan per household. Townhouses and villas are charged with a pre-burial fee of 29 yuan per square meter according to the construction area, and the maximum is not more than 9,000 yuan per household.
High-rise residential buildings with a height of more than 20 meters above ground shall be charged a pre-burial fee of 30 yuan per square meter with a construction area, and the maximum shall not exceed 3,500 yuan per household. Affordable housing, low-rent housing and other affordable newly built residential units are charged according to the construction area of 26 yuan per square meter, and the maximum per household does not exceed 2,800 yuan. Whoever destroys means of transportation, transportation facilities, electrical equipment, gas equipment, or flammable or explosive equipment, causing serious consequences, is to be sentenced to fixed-term imprisonment of not less than 10 years, life imprisonment, or death.
Whoever negligently commits the crime in the preceding paragraph is to be sentenced to fixed-term imprisonment of not less than three years but not more than seven years; where the circumstances are more minor, a sentence of up to three years imprisonment or short-term detention is to be given.
Detailed process of gas pipeline transformation:
1. Installation application: First of all, you must submit an application to the Market Development Department. After receiving the application, the market development department will send someone to the owner's home within 5 working days for on-site inspection, and then reply to the owner and arrange a series of installation details.
2. Account opening: The owner of the property needs to bring his ID card, real estate certificate and account opening notice to the gas company to sign the gas civil gas supply contract, and pay the corresponding account opening fee, the gas company will send someone to the owner's house within 5 working days to install the gas meter and conduct the ignition test, if the decoration owner is a tenant, then you need to bring your ID card, housing lease contract and account opening notice to the gas company to apply for an account opening.
3. Renovation construction: If the owner wants to move, move, renovate or install gas meters or gas pipelines, he needs to apply to the gas company, and then the gas company will come to the door to investigate, and the survey fee must be settled. The surveyor will calculate the modification cost based on measuring the size of the modification, and then will send someone to the door-to-door construction to settle the modification fee after the construction.
Legal basis: Criminal Law of the People's Republic of China Article 118 Whoever destroys electricity, gas or other flammable or explosive equipment, endangering public safety, and has not yet caused serious consequences, shall be sentenced to fixed-term imprisonment of not less than three years but not more than ten years.
-
Do the math how much it will cost you to renovate your home
In winter, the most unacceptable thing is the cold climate, which will affect people's normal work to a certain extent, maybe it's okay for friends in the south, but if it is in the north of more than ten degrees below zero, there is no heating, it is an unacceptable thing, so what are the heating renovation cost standards? Let's take a look.
Heating renovation cost standard.
For the renovation cost of heating, most of the current market is 96 yuan per square meter, of course, some areas may have to 130 yuan per square meter, if it is because the facilities in the community or the unit are too long, the equipment is aging, and the transformation must be carried out to use, and the owner needs to bear the transformation cost; Due to the reasons of the developer or the construction party, the renovation costs incurred shall be borne by the developer or the construction of the construction bureau.
What are the heating renovation methods.
1. Install close to the ground.
Generally speaking, this kind of product needs to be exposed to the air before it can be heated normally, if it is close to the base cabinet, it will affect the heat effect of the radiator to a certain extent, so it is recommended to put the radiator in the blank space between the base cabinet and the wall cabinet, and the area does not need to be large, which is enough for the heating of the room.
Second, hang on the sofa.
There is no problem with this method in terms of technology and heat dissipation, but it needs to be considered that if it is placed on top of the sofa, the heating is equivalent to hanging on the person's head, and the heat will roast the head, which may make the human body feel uncomfortable.
3. Dismantle the top pipeline.
The pipe in the product is the main place for heating, so it must not be removed, otherwise the whole floor will not be heated, it is recommended to use the local ceiling to wrap it up, to decorate, in addition it can also be painted to the same color as the wall, do some decoration in the part, so that it is integrated into the wall, not so conspicuous.
Summary: Well, the above is the introduction of the content of the heating renovation cost standard, I hope to provide you with some help, I believe that in the future in the heating renovation cost standard fiber in the process, friends will be more handy, get their own satisfactory answer.
Enter the area and get the decoration for free**].
-
The following is a detailed introduction and cost standard for each heating modification method: Replacing the boiler The boiler is the core component of the heating system, and replacing the boiler can improve the efficiency and safety of the system. According to the type of boiler, power and other factors, the cost will be different, generally about 5000-10000 yuan.
Common types of boilers include gas boilers, electric boilers, oil-fired boilers, etc., among which gas boilers are the most common one. The advantages of gas boilers are high thermal efficiency, environmental protection, and easy to use, etc., and the disadvantage is that they need to be connected to natural gas pipelines, and if there is no natural gas pipeline and the pipeline needs to be re-laid, the cost will be relatively high. Replacing a radiator radiator is an important part of a heating system, and replacing a radiator can improve the thermal efficiency and comfort of the system.
The cost is about 1000-3000 yuan, and the specific cost varies depending on the radiator model, size and other factors. Common types of radiators include cast aluminum radiators, steel radiators, copper radiators, etc., among which cast aluminum radiators are the most common one. The advantages of cast aluminum radiator are high heat dissipation efficiency, long service life, beautiful appearance, etc., and the disadvantage is relatively high.
Replacement of pipes Pipes is the transmission medium of the heating system, and replacing the pipes can improve the transmission efficiency and safety of the system. The cost is about 200-500 yuan, and the specific cost varies depending on the pipe material, length and other factors. Common pipe materials include steel pipes, copper pipes, plastic pipes, etc., among which plastic pipes are the most common one.
The advantages of plastic wax punching pipe are relatively low, easy to install, not easy to rust, etc., and the disadvantage is that the service life is relatively short. Installing Juxiao underfloor heating is a comfortable and efficient way to heat the air and comfort of your room. The cost is about 200-500 yuan per square meter, and the specific cost varies depending on the floor heating material, area and other factors.
Common floor heating materials include electric floor heating, water floor heating, etc., of which electric floor heating is the most common one. The advantages of electric floor heating are easy to install, easy to use, and do not take up space, etc., while the disadvantage is that the power consumption is relatively high. Install intelligent control systemIntelligent control system can realize remote control, timing control and other functions to improve heating efficiency and comfort.
The cost is about 1000-3000 yuan, and the specific cost varies depending on the type of system, function and other factors. Common intelligent control systems include smart thermostats, smart home systems, etc., among which smart thermostats are the most common one. The advantages of intelligent thermostats are easy to use, energy saving and environmental protection, beautiful appearance, etc., and the disadvantages are relatively high.
-
The cost of heating renovation varies depending on the region, the area of the house, the way of renovation and other factors, and generally includes the following aspects: 1Material Costs:
This includes the cost of materials such as radiators, pipes, valves, pumps, etc. 2.Labor Costs:
Including installation, dismantling, maintenance and other labor costs. 3.Design Cost:
For example, Zheng Zhengguo needs to be designed, and the design fee needs to be paid. 4.Pipeline Renovation Cost:
If you need to renovate the pipeline, you will also need to pay for the pipe modification. 5.Other Expenses:
Such as transportation costs, cleaning costs, etc. Generally speaking, the heating renovation fee is between a few thousand yuan and tens of thousands of yuan, and the specific cost needs to be assessed according to the actual situation.
-
1. Large and medium-sized building heating renovation cost standards: 1. Heating renovation costs: calculated according to the renovation cost of 100 yuan per square meter, the renovation cost includes the installation cost of new heating pipes, radiators, and the purchase and transportation costs of radiators.
2. Heating renovation material cost: calculated according to 50 yuan per square meter, the material cost includes heating pipe materials, radiator materials and accessory materials. 3. Heating renovation equipment cost:
Calculated at 50 yuan per square meter, the equipment cost includes heating regulators, heating balloon valves, filters, etc. 2. Heating renovation cost standard for small buildings: 1. Heating renovation cost:
According to the calculation of 80 yuan per square meter of renovation cost, the renovation cost includes the cost of new heating pipes, radiator installation, radiator purchase and transportation costs. 2. The cost of heating materials for skin making: calculated at 40 yuan per square meter, the material cost includes heating pipe materials, radiator materials and accessory materials.
3. The cost of heating renovation equipment: calculated at 30 yuan per square meter, and the equipment cost includes heating regulators, heating balloon valves, filters, etc.
1. How to deal with water leakage in heating pipes?
When there is a leak in the heating pipe, it is necessary to find out the cause and take corresponding measures according to the cause, as follows: >>>More
When arranging the system supervisor, it should be coordinated with the use requirements of the building, the heating system schema, and the layout of radiators. It is necessary to strive to save pipes and facilitate installation and maintenance. Supervisors are generally exposed to the surface. When the supervisor is exposed, it should be arranged in the corner of the external wall and the wall between the windows as far as possible. >>>More
Single-tube series The characteristics of single-tube series connection are low material usage, relatively weak labor intensity, and shorter transformation time. The water of the whole system passes through the first set of radiators of the system, then the second group, then the third group ......, so the water temperature is gradually decreasing in the order of series. Under the same conditions, the temperature of the first and last two groups of heating to the room can be more than 2 degrees, in order to adjust the water temperature of a single group of heating, a bypass valve must be added at the inlet and outlet of the radiator front, some use a three-way regulating valve, and some use three gate valves. >>>More
First of all, it is necessary to apply for installation, the gas company conducts on-site investigation, is responsible for coordinating all aspects of design and installation ignition, and then opens an account, pays the account opening and fees within 5 working days, arranges the installation and ignition, and then transfers the relevant procedures, transforms the construction, and finally settles the cost; When the gas pipeline meets other pipelines, it should meet the requirements, the gas meter must be ventilated, the connection between the gas appliance and the pipeline should not use the hose, and the safety inspection needs to be carried out after the pipeline is installed.
It is the responsibility of all owners.
You can apply for public repairs in the community**. >>>More