When decorating the bathroom, first of all, the wall should be waterproof before laying the wall tiles, and the general wall waterproof height is 30 cm. If the wall is thin or light, it is advisable to waterproof the entire wall. In order to save money, at least 60 cm of waterproofing should be done.
There are also joints between walls and floors, bottoms of pipes between water and water, and leaks. Therefore, the workers must urge the workers to deal with this edge when constructing, and must put the waterproof paint in place and not remove the tribute. In this case, a lot of problems can be avoided later.
If it is a bathroom and it is necessary to replace the tiles, it is necessary to pry open the original tiles, level the floor, and carry out waterproofing after leveling. In this way, there will be no unevenness when the waterproofing treatment is carried out in the later stage, and the uneven thickness of the waterproof material of the coating film is avoided, thereby reducing the occurrence of water leakage. The bathroom wall must be waterproof, which is also a hard construction of the decoration and cannot be saved.
At the same time, waterproofing is also a hidden project in the decoration, which belongs to the key construction project, and must not be taken lightly, not waterproof on the wall, and it is useless to regret the problem when living in the future. When the time comes, repairs are quite difficult and expensive. The point is that no one has fixed it for me yet.
The bathroom walls are not waterproof, and after water seeps into the walls, the public walls of the bathroom will become damp, and over time, the walls will become moldy, which will have a serious direct impact on the bedroom wardrobe, making the cabinets in the wardrobe moldy and rotten, seriously affecting the daily life of the house. Depending on the location, the waterproofing requirements are different. The toilet walls are vertical.
After tiling, even if there is water, it does not accumulate along the flow, so the moisture-proof effect is preferred for wall waterproofing. In addition, after the wall waterproofing is finished, tile tiles should be made. Because the wall is vertical, the tile has a strong falling force after tiling, the rigid waterproofing and base adhesion are higher, and the stability is higher after tiling the tile by Ramo treatment in the later stage.
The toilet needs to be waterproof on the wall 30 to 50 cm high from the ground. Because the set waterproof height depends on daily water habits, it prevents water from seeping from around the walls to the back of the bathroom, affecting wall decorations or furniture items in other areas. The walls of the bath ball need to be waterproof.
The wall of the bath outlet belongs to the direct water use area, so it is necessary to pay attention to the waterproof work and be wary of the leakage phenomenon affecting the wall decoration on the back. It is not right to tile the bathroom after it is waterproof. After the wall is coated with a waterproof layer (acceptance), the wall can be sheared with cement mortar and then tiled.
-
The waterproofing of the bathroom is generally directly done to the roof, otherwise the waterproofing is not high enough, and the water vapor will still erode the walls above.
-
It is best to make the waterproof of the wall 1.8 meters, otherwise you are likely to get damp on the wall when you shower and cause trouble for yourself.
-
It's 1 meter, because the water can't be that high when bathing, so 1 meter is enough.
-
Bathroom waterproofing should not only be done but also to do a good job, otherwise there will be leakage, then it will harm people, we are generally 3 times, but also soaked in water for more than one to two months. If it is necessary to replace the tiles in the bathroom, be sure to pry the original tiles open, and then level the ground, and then do waterproof treatment after leveling. In this way, there will be no unevenness when doing waterproof treatment in the later stage, and it can be avoided.
<> bathroom wall is not waterproof, with the water flow penetrating the wall, then the common wall with the bathroom will become damp, over time, the wall will become moldy, seriously and directly affect the bedroom wardrobe, so that the wardrobe cabinet becomes moldy and rotten, serious bathroom wall is generally decorated with ceramic tiles, and the waterproof layer will affect the adhesion between the tile and the wall, and a series of quality problems will occur after the tile is pasted, such as hollowing and falling off.
When doing wall waterproofing, the waterproofing layer needs to sit before laying the wall tiles. Usually the wall surface should be waterproof with a height of 30 cm in the wall waterproofing treatment, but for non-load-bearing light walls, the whole wall should be waterproofed, at least 60 cm high. It is best to achieve a height of 180, or it will affect the moisture return of the wall next door, mildew and anti-alkali, if you insist on not doing it, there is not much problem The bathroom must be waterproof, the usual bath includes scrubbing, the ground will inevitably have stagnant water, and the usual shower water will be poured on the wall for a long time will also seep out, so it must be waterproof.
If you don't do waterproofing for a long time, it will also affect your residence, and the waterproof specification requires that both sides of the rain wall be high, and the other two walls should also be not less than 30cm in height. Because there must be a room next door to your bathroom, and there is also a simple kitchen and bathroom on the wall, it is best to do waterproofing. Because the place where the water is used, it is in the kitchen and bathroom.
When the bathroom is waterproofed, it should be about 1.2 meters on the wall and surface of the shower.
-
The waterproof height of the wall is 900 to 1000 mm, and in special cases it can reach the bottom of the ceiling. The shower can be 1.8 meters, and the other walls can be about 1 meter. If there is a shower, it can be about 1,800 meters above the ground, and if the wall is full, it can be waterproofed.
-
The height is about two meters, which can effectively prevent moisture from entering, and the electrical appliances at home are not easy to break.
-
Of course, the walls of the bathroom need to be waterproof, because there is more water in all aspects of bathing, and the height of waterproofing is generally about 1.2 meters.
-
When decorating the bathroom, there are two aspects that we need to pay attention to, that is, the drainage and waterproofing of the bathroom. Drainage will not be told in detail for the shed, today I will mainly talk to you about the waterproof work of the bathroom. Some owners don't know how high the bathroom waterproof hail should be, and the waterproof height of the bathroom is particular, so let's learn about it!
1. Waterproof height of the bathroom.
The waterproofing of the wall must be done, and the wall should be waterproofed with a height of 30 cm in the general waterproof treatment, but the non-load-bearing light wall should be waterproofed by the whole wall, at least 60 cm high. The wall waterproof coating should be about 30cm high to prevent water from penetrating the wall and returning moisture. The waterproof height of the wall of the bathroom with a shower room should generally be 180cm; If there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 30cm higher than the bathtub.
The height of the waterproof wall should generally be 30cm high, and the non-load-bearing wall should be waterproof when the whole wall is waterproofed, and its basic waterproof height should be at least 180cm high.
Second, the waterproof height of the washbasin.
For other walls in the bathroom, such as the wall in contact with the washbasin in the bathroom, 300mm from the ground to the washbasin; If you have a toilet in your bathroom instead of a toilet installed in it, then one of its waterproof heights is 1800mm above the ground. The waterproof height of the pipes (including casings) that pass through the floor slab in the bathroom is about 100mm above the root of the pipe. When doing waterproofing, try not to destroy the original waterproof layer in the new delivery of the building generally made a waterproof layer on the ground, so there is no leakage without destroying the original waterproof layer.
The above is the relevant content about how high the bathroom waterproof should be, I hope it can help you! Hunting Net, China's well-known large-scale decoration square finch platform, decoration leading brand. If you want to put your mind on decoration design, it is recommended that you apply for the free design service of Hunting.com, and help you plan a reasonable space layout and exquisite design through the on-site measurement of professional designers.
Click here to get a free room measurement design by a professional designer.
-
Waterproofing is a crucial item in home improvement projects, which affects the normal life of the occupants in the future. If the waterproofing is not done well, it will lead to peeling and mildew of the wall, and it will also cause the dampness and rot of the furniture. But here's the problem
How high is the standard of waterproofing in the bathroom? How high is the waterproof wall in the bathroom? Let's take a look!
1. The waterproof height of the bathroom wall.
For the height of the waterproof wall of the bathroom, it is generally 30 cm high to prevent water from penetrating the wall and causing moisture return. The wall waterproof height of non-load-bearing walls should be at least meters high; The waterproof height of the wall of the bathroom with a shower room should also be metered; If there is a bathtub in the bathroom, the waterproof height of the wall adjacent to the bathtub should be about 30 cm higher than the bathtub.
Second, the waterproof high draft of the bathroom washbasin.
The waterproof height of the wall in contact with the washbasin should be 30 cm from the floor to the washbasin. If a urinal is installed in the bathroom, it is waterproof to a height of one meter above the ground. The waterproof height of the pipe that passes through the floor slab in the bathroom is about 10 cm above the root of the pipe.
3. The waterproof height of the bathroom floor tiles.
When installing bathroom floor tiles, in addition to using cement mortar under the surface to square the ground and apply waterproof coatings. The waterproofing layer around the floor tile waterproofing layer in contact with the wall needs to be about 25-30 cm above the ground.
Fourth, the waterproof height of the toilet sewer.
The waterproof height of the toilet sewer directly affects our daily life, and it is recommended that the height of the toilet sewer floor drain seal should reach 5 cm. Do not allow the odor in the drain to overflow into the sewer to prevent problems such as clogged sewers.
The above is the relevant content about how high the bathroom waterproofing is generally made, I hope it can help you! Hunting network, China's well-known large-scale decoration square platform, decoration leading brand. If you want to put some thought into decoration design, it is recommended that you apply for the free design service of Hunting Network, and help you plan a reasonable space layout and exquisite design through the on-site measurement of the room by a professional designer.
Click here to get a free room measurement design by a professional designer.
Do the math how much it will cost you to renovate your home >>>More
The height is determined according to the need, generally speaking, the bathroom is waterproof 180 cm high, and the non-shower wall waterproof coating cannot be less than 35 cm in principle. However, in order to strengthen the waterproof effect, it is recommended to achieve a uniform height of 180 cm. In addition, for the light wall of the toilet and bathroom renovation and the self-built light wall, it is recommended that the waterproof height should be at the top. >>>More
In areas where underfloor heating is needed (mainly in the north), underfloor heating is installed under the bathroom when underfloor heating is laid. This is because the toilet also needs to be heated in winter to keep the temperature in the bathroom while bathing. >>>More
The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More
The layout of the bathroom generally needs to pay attention to the use of space and spaciousness, and now many small bathrooms are not only used for toilets, but also have the functions of toilets and showers, so it is particularly important in the layout, the most common is the layout of dry and wet separation, which is also the choice of most families. If you want to do a good job of dry and wet separation, the first thing that is more common is the shower curtain, which is relatively simple, and the cost is relatively low, it can separate the space, and it will not be so crowded, which is also more suitable for small toilets. There are also some families who may choose to use glass as a partition, which is more designed and cheaper, and some families may choose to use glass doors to separate the dry and wet areas of the bathroom, which is also suitable for larger bathrooms. >>>More