1. Notify the other party of the contract of the time of material acceptance After the material is purchased, the purchaser needs to notify the other party of the contract to prepare for the acceptance of the materials. And this acceptance is best scheduled to take place as soon as the material enters the site. Therefore, it is very necessary to agree on the acceptance time.
In order to avoid that when the materials enter the site, the other party has no time to accept the materials, which affects the construction progress.
Second, the acceptance personnel specified in the contract must be present when the material is accepted, whether it is a person in the home improvement industry or a consumer, it seems that the contract does not rise to the legal point of view. However, a home improvement contract is a legal document in itself, and if it is not taken seriously, there is a risk of unnecessary trouble.
3. The acceptance procedure must be strictly The acceptor shall conduct necessary inspections for each material agreement specified in the contract, such as material quality, material specifications, and material quantity.
Fourth, the contract stipulates that the acceptor shall sign on the acceptance form, if the inspection results are qualified, the acceptor shall sign on the material acceptance form.
-
In order to avoid the entry of materials into the site, there is no time to agree on the acceptance of materials, which affects the construction progress. In the process of material acceptance, the acceptance personnel stipulated in the contract must participate: personnel and consumers in the home improvement industry do not seem to be legally aware of the contract.
However, a home improvement contract is a legal document in its own right, and if not taken seriously, there can be unnecessary trouble.
The acceptance procedure must be strict: the acceptor shall carry out the necessary inspections of the various material agreements stipulated in the contract, such as material quality, material specifications, material quantity, etc. The acceptor specified in the contract shall sign the acceptance form:
If the inspection results are qualified, the material acceptance form shall be signed. It's a more complete process. Because, if the material was accepted at the time of entry into the site, but the necessary procedures were not carried out at that time.
Later, I regretted not acknowledging my own acceptance results. However, since the other party has no evidence, there is no way to get such a result. According to the regulations, before the start of the decoration construction, the decoration company will compare the decoration materials, transport them to the construction site, and strictly inspect them in accordance with the terms of the contract, especially the brand, quantity, specifications, quality, etc.
If there is a discrepancy, it should be replaced in time.
Whether the masonry wall is made of one-to-two cement mortar, and whether the pipe is sealed with one-to-one cement mortar. If the wall decoration is made of wallpaper, you need to check whether the connection of the pattern is consistent from the details, and whether there are bubbles, warped edges, cracks, wrinkles, stains, etc. behind the wallpaper. Latex paint decorates the wall, the surface is smooth, the reflection is uniform, and there is no hollowing, bubbles and cracking; The installation of flexible packaging decorative walls, storage boards, keels, and frames should be firm, without bending, and direct seams.
When laying the floor, the floor design and color should be uniform, the width of the joints should be reasonable, the ground clearance should be dense and straight, and the floor should be clean. When the doors and windows are accepted, there should be complete glass glue to ensure the sealing and normal use of the windows.
The specifications and colors of the materials should meet the design requirements; The joints of the overall façade should be tight and flat, and the drawers and doors should be opened flexibly and returned correctly. Once the acceptance is confirmed, the owner and the decoration company reach a cooperation, and the subsequent quality of life is completely responsible for the owner。According to the old regulations, the renovated house should be strictly completed in accordance with the contract, and the owner should not let go of any details in the clauses, and check them one by one from the brand, materials, quantity, etc.
-
It is necessary to pay attention to the material suitable for noise and safety, and must pay attention to the size of the material, the size of the material, whether the color is different, and the installation of the Hail Zen style.
-
I think it's whether the wires, water pipes, floors, toilets, and baseboards are installed correctly, and whether the whole is an empty shell.
-
To confirm whether the material is the same as their choice, the acceptance procedure must be qualified, there must be a special guess of the leather industry personnel present, choose the appropriate acceptance time, to check the board.
1. Program management
Calculate the quantity and budget of materials, and formulate a material schedule, which is one of the bases for the procurement department to review procurement and payment in the future. >>>More
1) For the maintenance work to determine the workload, that is, the determination of working hours, according to the difficulty of the maintenance task, the length of the maintenance time and other comprehensive factors, determine the working hours of each maintenance task, and form such a working hour standard as the "maintenance project working hour table". >>>More
The first principle of abandonment is to know what you need most, what the necessities are, and you can discard everything else, in addition to the necessities in home decoration, such as sofas, beds, etcWardrobe these can not be normal life of the furniture, other furniture can be saved, now people are more and more pursuing minimalist style, many home decoration is also adhering to the principle of simplicity to control the haze must furniture, of course, this design style is also very popular with everyone. >>>More
Renovation of the house?
The pet's temperament is understood. >>>More
Introduction: There are many owners in the decoration of the house will be more tangled, how to decorate the balcony and the living room after the opening, first of all, the balcony and the living room through the balcony, the balcony must be sealed, otherwise it is very easy to enter the air, because the balcony is sealed, the sound and heat insulation effect will be better, and it can also avoid the appearance of some dust, the safety will be better, if you choose not to seal the balcony, the lighting and ventilation will be better, and it will affect the service life of the balcony equipment for a long time. If you have children at home, it is best to seal off the balcony. When the living room and the balcony are all opened, it will make the living room look very spacious, at this time, the balcony can be designed in the form of a living balcony, the balcony can be set up as a laundry drying area, and curtains can be installed between the living room and the balcony as a partition. >>>More