-
The same waterproof material can be used on the bathroom to make waterproof walls and ground, and the bathroom waterproof floor needs to be done all, the wall must be at least meters, it is recommended to do full height, if it is a lightweight wall, then the wall must be all full high, so as to ensure the waterproof effect.
As for the materials used, the bathroom is not only small in size but also has many pipes, while 80% The above water leakage problems are concentrated in the yin and yang corners, through the pipe, sanitary ware, floor drain periphery, so these places need to pay special attention when doing waterproofing, kitchen and bathroom waterproof slurry adopts the concept of repairing and strengthening the key parts and then doing waterproofing as a whole, that is, first use the quick-setting repair mortar to carefully and evenly paint the parts that are easy to seepage, and then use the waterproof slurry to do waterproofing as a whole, so that the special material is dedicated, and the waterproof effect is better and more durable.
-
The bathroom should be waterproofed, not only on the wall, but also on the ground, and the wall and the ground should be completed at the same time and at one time, without intervals. Waterproofing materials are recommended to be cement-based. If you have more questions, you can click on ID to consult.
-
Yes, waterproof mortar is recommended for waterproof materials, so that it is convenient to paste tiles.
-
Of course, the walls and floors of the bathroom in the newly renovated house can be made of the same waterproof material.
-
Yes, the overall style is coordinated.
-
<>Yes. When the bathroom is waterproofed, the waterproof membrane and the waterproof cloth can be used in combination to maximize the effect of water prevention, which can be used in different places of the bathroom. The waterproofing membrane is generally used in a more regular place on the ground, which is convenient for construction and has high work efficiency.
Waterproof coating is generally used in the corners, as well as the place where the first ridge of the pipe is overlapped, which can be used to deal with the bend well, and the wall is generally waterproof coating, which is not easy to peel off and fall off, and will form a waterproof membrane, and the seam with the waterproof membrane can also be well handled.
-
Yes 1Cement mortar waterproofing materials.
What is the best material for waterproofing the bathroom?In fact, there are many waterproof materials, among which the more common one is cement mortar waterproof materials. This waterproof material is a uniform liquid formed by mixing cement mortar in a certain proportion.
When mixing cement mortar, it must be evenly mixed with a mixer, and its powder should be slowly added to it and stirred sufficiently, so that there is no precipitation. Moreover, the prepared cement mortar should be used up within 2-3 hours, otherwise it will dry up and affect the use.
2.Polyurethane waterproofing material.
What is the best material for waterproofing the bathroom?In fact, polyurethane waterproof materials are also very good. It has a tough, tensile strength, viscous and structural expansion and deformation resistance.
Therefore, this kind of waterproof material is also very suitable for the use of the wall of the bathroom, and there is no flow and cracks, and the service life is relatively long. However, polyurethane waterproof materials will have an unpleasant smell during use, which is not very environmentally friendly.
3.Acrylic waterproofing material.
What is the best material for waterproofing the bathroom?In fact, acrylic waterproof materials are also very good. It has strong acid and alkali resistance, and also has good elongation and breaking strength, strong stability, and good waterproof effect, so this kind of waterproof coating is widely used in various home decoration waterproof projects.
Acrylic waterproof materials are also easy to construct, and can be rolled and scraped.
-
Answer; Absolutely.
In fact, building waterproofing advocates the combination of rigid waterproofing and flexible waterproofing to do waterproof construction, the general rigid and flexible combination of waterproofing, mostly in key projects, roof waterproofing, waterproof projects with special requirements, etc.
If the coating is used as a flexible waterproof layer, the flexible characteristics have a good tensile effect and are waterproof, and the mortar waterproof and rigid waterproof are used as the surface layer, which not only plays a waterproof but also protects one stone.
Suggestion: If ** is not the first element you consider, this approach is very reasonable. Approve of your approach. If you want to think about **, just use only one, so as not to cause unnecessary waste.
Remarks: Good waterproof materials also need careful construction, "construction process" is the key, later maintenance, protection to pave the way, in order to effectively do a good job of waterproofing.
In terms of materials, it is best to choose 1, cement-based flexible waterproof coating 2, mortar waterproofing agent, non-toxic and environmentally friendly waterproof mortar.
-
<>Yes. But to be on the safe side, it's best to brush another layer of waterproof paint on top after drying! A 24-hour closed water test is also required.
-
It is recommended to apply a waterproof coating on the plain gray surface layer first. Brush horizontally, and when dry, vertically. It's called once. It needs to be brushed twice. Cement mortar waterproofing can be used as a protective layer on top of the waterproof coating. Then apply the tiles.
-
Yes. That's a very good combination, equivalent to a combination of rigidity and flexibility.
Waterproof coating, choose JS waterproof coating.
Waterproof mortar, choose the waterproofing agent sold on the market and mix it with the cement sand at home to form a waterproof mortar.
I want to ask, are you decorating by yourself? Is it a simple bathroom, but the family has a bath or something? If so, the developer has already done a waterproofing before handing over the work, and you can only choose one way. Pay attention to do a good 24h waterproof test, and the general decoration workers will know what to tell you.
-
1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records.
2. Check the quality certification documents of the materials and include them in the engineering and technical files.
3. After the material enters the site, the material inspection report shall be issued according to the specification.
4. When all the indicators of the physical properties of the material meet the standards, it is qualified; If an index does not meet the requirements of the standard, the index should be re-sampled in the tested product for re-inspection, and the re-test result meets the requirements of the standard, and the batch of materials will be judged to be qualified.
5. Waterproof material. There are three main categories: waterproofing membranes; 911 polyurethane waterproofing material; New polymer cementitious waterproofing material.
The last category is divided into general-purpose GS waterproof materials and flexible JS waterproof materials. Among them, the universal waterproof material is suitable for the waterproofing of the indoor floor and wall of the family.
-
Hear the expert answer:
1。The problem of doing the wall first and then doing the ground is: first, the wall waterproof treatment must leave a distance of more than 15-30 cents in the corner of the wall, and some irresponsible workers will leave you only a few centimeters of spacing, and there is no way to repair and do the wall-to-ground connection if there is a problem in the future, because the most likely place to leak is the wall and ground joints and pipe roots.
Second: in the process of sticking wall tiles, it is inevitable to leave a lot of cement agglomeration and garbage on the ground. To deal with these things that cannot be simply cleaned, the cement agglomeration left behind must be removed, and the dust must be treated with a plugging spirit.
Otherwise, it may occur in the future because of the change of the cement agglomeration, which will cause the waterproof layer to move or be damaged, and even cause the waterproof layer and the ground to not be bonded. Third: In this way, the construction may be wrapped in the riser, and the waterproofing around the riser may not be able to be constructed.
Since the riser is a layer of red bricks, it is very likely that the main structure will change in the future, and water can easily seep into it and cause inconvenience in future maintenance (you can refer to the riser or waterproof first). The advantage of this is that the destruction of the waterproof layer of the ground is avoided to the greatest extent, and the ground is not used as a protective layer to save a little.
2。The construction of the wall and the ground together can avoid the problem of waterproof connection between the wall and the ground, and the full-area waterproof construction of the ground avoids local omission. But the biggest problem lies in the protection of the waterproof layer of the ground in the process of attaching wall tiles.
Therefore, a certain thickness of protective layer must be made on the ground. There is also a problem with the construction of the protective layer. The cost of the sand ash cement layer is lower, but it needs a certain thickness, and the layer height is increased to increase the thickness, and it is easy to step on and crush without increasing the due effect, so it is recommended to use the interface agent (or 108 glue) to mix the cement construction, which can be done by centimeters.
In the process of tiling, you can ask the master not to try not to put sand and ash on the waterproof layer. In this way, there is no problem with normal construction (including the use of scaffolding, stacking tiles, shelving all kinds of construction tools, general wall tiles falling, and vandalism).
3。The construction is generally carried out with walls and ground, and a certain thickness of protective layer is added to the ground.
-
The first to do the ground is to ensure that there is a damp phenomenon during the decoration.
-
The wall leaks in your own home, and the floor leaks into someone else's house. For the sake of neighborly harmony.
-
Because the waterproofing of the bathroom is to be made into a basin, the perimeter of the bathroom should be 10 20 cm higher than the laying of floor tiles, only in this way, after the floor tiles are laid, if the water leaks from the gap of the laying floor tiles or the wall surface downward, the leakage of water will be isolated by the entire waterproof layer and the floor under the waterproof layer, if the water leaks to the level with the laid floor tiles or leaching out of the floor tiles, the water will naturally flow into the sewer pipe through the floor drain, and will not cause the downstairs to be damp, in order for you to be able to deal with the neighbors in a friendly relationship, I hope you must do a good job of waterproofing the bathroom, and I wish you a new housewarming.
-
For convenience. Do not clean twice.
-
There is no restriction in this regard, it is completely possible to paint the wall first, and then brush the ground, but the waterproofing should be completed at one time, and there can be no interval in between. For example, you can paint the walls first, and then the floors immediately after.
Opening windows for ventilation is the best way.
How to decorate the bathroom, many people may not have carefully considered, think that the bathroom is a shower, toilet and washing, as long as the toilet, shower and washstand are installed, in fact, the bathroom decoration process is not understood, the later troubles are a lot, the following 8 major bathroom decoration process, do it, you can also install the perfect bathroom. Step 1, hydropower transformation, hydropower positioning, oblique tee, water trap, water supply pipe pressure test, drainage test water can not be missing, choose the wall row or the ground row, in this step also to plan Step 2, sewer sound insulation, sewer pipe sound insulation If you don't do a good job, as soon as you release water upstairs, your home will make a noise Step 3, the bottom layer is waterproof, and the bottom layer is slope waterproof to avoid hiding water at the bottom in the future. Step 4, the wall is waterproof, the base layer should be waterproof to be 40 cm, and the surface layer waterproof should be 2 meters 4 high. >>>More
You can put aloe vera: aloe vera has a certain effect of absorbing odors, and it also has the effect of beautifying the room, and the effect is long. Spider plant: >>>More
If you want to redecorate the bathroom at home, you are afraid that the installation will not be in place, what to do, the bathroom decoration should be in place in one step, bricks and water and electricity are the best. Even if you decorate it later, it's best not to renovate the bathroom. Because if you temporarily paint the bathroom wall or paste inferior tiles in order to save money, then you will have to renovate it in the second decoration. >>>More
Is there a relationship between a child's frequent colds and a newly renovated house? To solve this problem, we must first know, what are the factors that cause children to catch colds? There are generally two types of colds, one is wind-heat cold. >>>More