During the acceptance of the rough house, it was found that the wall had a serious desertification p

Updated on home 2024-07-13
1 answers
  1. Anonymous users2024-02-12

    We first have to look at the wall of the house, it is best to take a small piece of wood in our hands, knock on the wall, listen to see if there is a hollow drum sound, this is easy to hear, if the wall is not real, it will make an empty sound. Check whether the door opening and closing is smooth and flexible, and whether there is any abnormal noise; whether the closure is tight; When the door is opened, whether the handle hits the wall; whether there is a phenomenon of "door fighting"; Tsuneshi-kun personally believes that the first thing to pay attention to is to inspect the house procedures. Check whether the house is the house you have purchased, if you are not satisfied with the purchase contract, accessories and supplementary agreement, you should ask the real estate agent before moving in, re-check and replace.

    <> in the precautions for the inspection of the rough house, the inspection of the wall is very important, and the inspection should be done by gently tapping the wall with your hands, judging whether the wall is hollow from the sound, and visually inspecting whether there are cracks on the wall. There are four common cracks: strength cracks, settlement cracks, temperature cracks, and deformation cracks.

    This really doesn't need to be taught

    Related questions
    31 answers2024-07-13

    If there is latex paint on the original wall, it can be completely cleaned, and then the tile can be pasted, which is the most correct, and can ensure that the tile is particularly strong and will not fall off easily.

    7 answers2024-07-13

    The steps and methods of water and electricity decoration of the blank room are as follows: >>>More

    4 answers2024-07-13

    The renovation process consists of three stages. At first, it is the design stage, which requires the main decoration designer to communicate to understand the style that the owner likes, and integrate the popular trends into it, and determine the design plan before starting to screen the decoration company. >>>More

    7 answers2024-07-13

    Precautions for the delivery of rough houses: (1) First check the developer's "Residential Quality Assurance Certificate", "Residential Instruction Manual", "Construction Engineering Quality Certificate", "Real Estate Development and Construction Project Completion Comprehensive Acceptance Certificate" and "Completion Acceptance Record Form". (2) Inspect the house first and then go through the procedures. >>>More

    6 answers2024-07-13

    This is necessary, because having an ID card does not necessarily have a hukou, and only by holding the hukou can you find out how many houses the family has, which is complementary to the purchase restriction order. >>>More