Hello, it is not troublesome to change it this way, it saves energy and money in doing so. Drill a hole through the wall in the wall, the diameter of the hole can pass through the pipe, if it is an exterior wall, you should pay attention to the waterproof problem, add a decorative cover to the inner wall, so that you can.
-
Second, electrician series.
On the surface, the construction of electricity seems to be alive a lot, but many potential problems leave many hidden dangers for future life. The common problems mainly include: open circuit and short circuit of distribution lines, weak TV signals, and receiving interference.
Frequently asked questions are:
1. The main reason is that there are too many line joints and improper joint treatment. Some lines are too long, and there will be some joints when the electrician operates, but due to the limitation of the technical level of some electricians in the construction team, the wirering, insulation and moisture-proof treatment of the joints are not good, and the phenomenon of broken circuit and short circuit will occur.
2. In order to reduce costs, there is no casing for the line that is concealed and treated. Hope it works for you.
-
Decoration water and electricity problems 1, water pipe leakage: assuming that there is no quality problem with the water pipe and the pipe itself, then the cold water pipe and hot water pipe may leak. The leakage of cold water pipe is generally due to the failure to seal the water pipe and pipe fittings when they are connected; In addition to the failure to seal the hot water pipe, the leakage of the hot water pipe may also be due to the improper selection of sealing materials.
2. The reason for the small water flow: during construction, in order to connect the whole line, it is necessary to set a thread on the sawn water pipe, if the thread is too long, the water pipe is screwed into the pipe fittings (such as elbows) too deep when connecting, which will cause the water flow section to become smaller, and the water flow will be smaller. Hope it works for you.
-
Renovation water and electricity problems? Hose bursting: Most of the tubing that connects the main pipe to the fixture uses a serpentine hose. If the hose is of poor quality or if the plumber tightens the hose during installation, it will burst after not being used for long.
Overflow when toilet flushing: When the toilet is installed, the groove of the base is not sealed with grease, and sewage will overflow from the gap between the base and the ground when flushing. Hope it works for you.
-
When decorating water and electricity at home, we must be clear about water and electricity decoration, otherwise it is easy to be charged indiscriminately by people who decorate water and electricity. At the same time, it is also necessary to know what are the precautions for water and electricity decoration, so that the layout of the water and electricity lines can be decorated. But these information about water and electricity decoration is very vague for people who have no decoration experience, and here "Chopin Home" will give you a more detailed introduction to the matters to be paid attention to in water and electricity decoration.
1. The design of the waterway should first think about the water-related equipment, such as: water purifiers, water heaters, kitchen treasures, toilets and wash basins, etc., their location, installation methods and whether hot water is needed; It is necessary to think about the use of gas or electric water heaters in advance, and avoid temporary replacement of water heater types, resulting in repeated transformation of waterways; In addition to leaving the water outlet for the wash basin, toilet, washing machine, etc., try to pick one out, and it is very convenient to receive water and mop the floor in the future.
2. The wires that need to be installed in the living room include power lines, lighting lines, air conditioning lines, TV lines, ** lines, computer cables, doorbell lines, etc. Generally speaking, reserve the first line port at the edge of the sofa, reserve the doorbell line port on the inside of the door, reserve the power port for water dispensers, humidifiers and other equipment, and generally leave at least 5 power cord ports in the living room. Air conditioners, *** machines and other things that are in standby mode without pulling out the plug should be equipped with a switch socket panel as much as possible, so that they can be turned off directly when not in use, and electricity will not be wasted.
3. The waterway renovation of the kitchen mainly includes faucets and water heaters, and the general family is that the kitchen and bathroom share a water heater, so when carrying out the waterway transformation, we must think about the location of the water heater installation, so as to determine the location of the installation of cold and hot water pipes and carry out the waterway transformation.
-
The frequency of water and electricity use at home is very high, so in the process of decorating hydropower transformation, special attention must be paid to try to prevent some common hydropower problems in the early stage of construction, which requires a professional hydropower installation master, professional embodiment in the installation specifications and installation experience.
First, the water pipe through the living room walks from the top, the kitchen and bathroom are covered by an aluminum gusset ceiling, and the corner is walked through the living room part, wrapped with gypsum wire, and if there is a water leak, it can be found immediately. The hydropower renovation master will make two holes when slotting, and the two water pipes will be naturally separated when laying the pipes, so as to ensure the spacing of the hot and cold water pipes and reduce the potential safety hazards of the water pipes. Let's take a look at another precaution in the renovation of water and electricity.
Second, pay attention to the quality of decoration water pipes and choose credible big brands as decoration materials, so as not to cause unnecessary trouble to daily life in the future. At the same time, you should communicate with the hydropower renovation master, place the faucets at home, and try to make the spacing between the sewage pool and the faucet reasonable. Renovation of water and electricity renovation is a job that requires special details, in order to have fewer water and electricity problems at home in the future, spend more time learning now!
Third, the direction of the pipeline must be kept horizontal and vertical. Although a slight oblique point does not have any impact on life, professional hydropower renovation should insist on doing better. Sometimes the hollowing phenomenon on the ground is not caused by improper masonry construction, but is caused by the spacing of the ground line pipe.
Fourth, in order to ensure the unification of the position of the switch and socket in the future, the hydropower master will play the line on the wall before slotting, and also use the cup to connect the connection, so that there will be no different levels of the socket in the future. Another point must be paid attention to in the process of hydropower transformation, the wire must be covered with insulating pipes.
-
The most common problem of water and electricity after renovation is that in some places their connection is not complete, or they will use some inferior wires to connect, which is likely to cause the circuit to deteriorate or the symptoms of poor connection.
-
After the house is renovated, the problems of water and electricity are easy to occur, mainly manifested in the sewer pipe is easy to block the wires in the pipe, the joint is diverted, and then the wire is not careful, which will have a certain impact on daily life.
-
After renovation, what problems are prone to occur in water and electricity? After decoration, hydropower is the most likely to have problems, hydropower is most likely to appear, bubble water, leakage and other related problems, so it is necessary to do a good job in hydropower construction.
-
The first point is that the circuit is prone to tripping. The second point is that there is water leakage or insufficient pressure.
-
When renovating kitchen water and electricity, in order to facilitate future cooking, the construction personnel are usually required to set the sink on the side away from the sewage pipe, but in order to save the pipe, the workers connect the drainage pipe of the sink to the floor drain of the balcony without authorization. If the domestic sewage from the kitchen is introduced into the balcony floor drain without permission, it will cause pollution to the drainage system.
-
There are few power plugs, the location is unreasonable, and the sewer of the washbasin is smelly.
-
The main problem is the bathroom, waterproof leakage, the electrical power of the bathroom is not large enough, short circuit and so on.
-
The waterway circuit is the most important environment in the early stage of interior decoration, because plumbering is a hidden project, and it is also a work problem that is relatively easy to occur. Next, Wantai Decoration wants to introduce the steps and precautions of water circuit construction to you on the matters needing attention for hydropower decoration and how not to spend money in vain.
-
After the decoration, if the water and electricity of your home is prone to problems, at this time you still have to find the decoration and maintenance master at that time, and if you sign the contract, you must perform it well.
-
Renovation is a very meticulous project, home decoration is about 45 days It is understood that it takes about 45 days to renovate a three-bedroom house of 140-150 square meters from start to completion. A smaller two-bedroom unit can save four or five days, while a duplex of more than 200 square meters can save an additional four or five days.
-
Sewer pipe blockage: some construction teams in the decoration, in some cases in order to save trouble, will contain a large amount of cement, sand and concrete fragments poured into the sewer, the serious consequence is to block the sewer, which will cause the kitchen and bathroom to run water, which requires more attention from the owner.
2. Wire joint diversion in the pipe: when installing sockets, switches and lamps, the terminals should be carried out in strict accordance with the construction requirements of the specification, so as to avoid the phenomenon of heating and even burning of switches and sockets when consumers use some electrical appliances with large power consumption, which will bring many losses to consumers.
3. Imprudent wire threading: Almost all wires in home decoration are worn in PVC pipes and are buried in the wall. Therefore, workers must be careful in the operation, so as not to cause kinks in the wires in the pipe, leaving great hidden dangers in the future, and it will be more troublesome to replace.
If you use wires with connectors, or thread several wires into the same PVC pipe, it does not meet the requirements of wire threading and is an act of cutting corners.
4. The water pipe goes to the ground: the water pipe goes to the ground reasonably, and the water pipe goes to the top is more in line with the water pipe installation specifications, and the water pipe goes to the ground and is easy to leak, which is more difficult to maintain. Therefore, the waterway should go from the low end, which can reduce the loss and facilitate the maintenance of the water pipe in the future.
Hope it can help you, hope
-
Precautions for water and electricity decoration - water.
1. The waterproofing project should be done after the construction of the concealed project is completed and accepted.
2. Waterproof construction should be waterproofed with coated film.
3. After the waterproof construction is completed, the water storage test should be done, and the downstairs neighbors should be notified at the same time.
4. The waterproof layer of the bathroom should not be less than meters.
5. Floor drains, yin and yang corners, pipelines and other places should be waterproofed one more time.
6. Try not to walk from the ground to the water pipe, and the hot and cold water pipes are hot on the left and cold on the right.
7. The cold water pipe should have a 1cm protective layer in the wall, and the hot water pipe should be, so the groove should be deep.
8. The installation of PPR pipe is to consider the thickness of the tile, so that the pipe will not be exposed.
9. The floor drain should be odor-proof floor drain.
10. For those who like to cook, it only takes a few minutes to cook, and it takes a long time to wash vegetables.
11. When the toilet is installed, it must be sealed with a flange sealing ring to prevent back-smelling.
12. When buying a toilet, consider the pit distance of the toilet.
13. The washing machine should consider whether it is an upper drain or a lower drain.
-
Hydropower is the focus of decoration, and the common problems when decorating hydropower are: when laying waterway pipelines, the pipes on the ground must be selected more than 160, and the pool must pay attention to the installation of filter screen devices to avoid sewer blockage. When laying circuits, the more common questions are:
Because there are too many electrical appliances used in the home, you must pay attention to choosing wires that are more than four square meters to avoid wiring fire in future use. In the decoration of the home, because the water and electricity are installed and cannot be changed at will, the water and electricity decoration has become the top priority. In terms of water and electricity decoration selection, we must choose regular manufacturers, pipes and wires that meet national standards.
It is best to choose a thicker sewer pipe, if you accidentally get into trivial debris, the thicker the sewer pipe, the easier it is to flush down. In today's family, refrigerators, air conditioners, and washing machines are all must-haves. In addition, some other small electrical appliances, so the wire must use a wire with a larger wire number, so as to avoid fire hazards in future use.
1. When laying the waterway, the thickness of the pipe must be more than 160, and the filter screen should be installed to avoid the situation of sewer blockage
We all know that sewers are generally laid under the floor tiles. If the sewer is clogged, you need to pry all the floor tiles open before you can unclog the sewer. Therefore, when you choose a sewer pipe, try to be thicker, preferably with a diameter of more than 160, plus a filter screen, you can prevent sewer blockage.
Second, when laying the circuit, the wireThe size must be more than four squares, and the material inside the wire should be made of copper to avoid the potential danger of fire
There are many types of general household appliances, ranging from televisions, refrigerators, air conditioners, to a series of household appliances such as soybean milk makers and rice cookers. At this time, the wire must choose a larger model, preferably more than four squares. It is worth noting that the material of the wire is best to choose copper wire, because copper wire is higher than other ordinary wire wires in terms of safety and conductivity.
The more appliances you have, the larger the square of wires you need to use, which can prevent short circuits in the wires.
So, do you know what aspects to judge the quality of wires?
-
The laying of circuit waterways, the treatment of details, the treatment of water leakage, be sure to plan in advance the size of various furniture, the reserved location of sockets, these are very important things, otherwise it will make your life very inconvenient.
-
The water pipe is leaking, or the sewer has a peculiar smell, the hose is particularly easy to burst, sometimes the toilet will overflow, the wire line is particularly long, and there are some safety problems, the current is unstable, and the wire line is not treated perfectly.
-
Socket location, wiring issues, etc. The location of the socket should pay attention to the arrangement of the socket, so as not to find it inconvenient to use after decoration; For line problems, plan the position of each line in advance to make it beautiful and convenient.
List of home improvement hydropower materials 2, auxiliary materials: wire pipe, tee, cassette, elbow spring, box joint lock, box joint lock, straight head, waterproof insulating tape, waterproof tape, broadband TV point. >>>More
Hydropower totals about 7000, including the cost of slotting and the cost of water pipes and wires. >>>More
Its walls are harder than the new houses, and it is very troublesome in terms of grooving and grooving, and it is necessary to demolish the old ones, and change the water and drainage, and some old houses are not allowed to destroy the floor tiles, which is also troublesome, so it will definitely be high.
Hydropower decoration to go to the ground or to the top? Don't dwell on it, it's the right way to do it. >>>More
Waterway roofing: The advantage is that the loss of water leakage can be minimized. Once there is a leak in the pipes at home, we can also find it in time and solve it in time. >>>More