Its walls are harder than the new houses, and it is very troublesome in terms of grooving and grooving, and it is necessary to demolish the old ones, and change the water and drainage, and some old houses are not allowed to destroy the floor tiles, which is also troublesome, so it will definitely be high.
-
There are generally three types of hydropower installation: walking on the top, walking on the ground, and walking on the wall. The circuit goes to the top, which is not easy to be damaged in the later construction, and the construction protection work is easy.
1. Walk the ground. The installation of the pipeline is relatively easy, the materials are less, the construction is relatively simple, and there is no need to manage the after-sales problem, but if there is a water leakage, it is more difficult to find, the maintenance is troublesome, and the loss caused is relatively large, because it will soak to the floor, and it will also destroy the ceiling downstairs and the like.
2. Walk the wall. The pipeline installation is more difficult, the materials are relatively less, the maintenance is relatively simple when there is water leakage, and once the water leaks, it will not cause too much loss, but the slotting is more difficult, and the wall will be damaged, the construction difficulty is also relatively large, and the later maintenance is also more troublesome.
3. Go to the top. The pipeline installation is the most difficult, the materials are also more, if the water leakage occurs, the maintenance is relatively simple, but it is not easy to find the water leakage problem, and it will not cause major losses, but if there is a hall, it is necessary to do the ceiling or gypsum line to block, but after the pipeline becomes longer, the water resistance will increase, which will cause the water flow rate to decrease.
-
1. Under normal circumstances, follow the copper wire of the socket circuit not less than mm. Air conditioners, water heaters and other high-power electrical appliances with copper wires of not less than 4mm. Flame-retardant sleeves shall be used for wires, and no more than 3 wires shall be used in the same sleeve.
The weak current line shall not be in the same set of pipes as the strong current line, and a certain distance should be kept between the two bushings.
2. In terms of waterways, the water pipes between the kitchen and bathroom should be in the ceiling as much as possible to facilitate future inspections. The place where water needs to be used should be designed during construction to prevent the situation where water is needed but there are no water pipes.
-
When renovating an old house, water and electricity construction is a more important job. The quality of hydropower construction is directly related to the comfort and safety of future residents. The following are some precautions for water and electricity construction:
1.Inspection of hydropower facilities: A facility inspection is required before carrying out hydropower construction. For old houses, there may be problems such as aging water and electricity, leakage, etc., which need to be optimized and upgraded. When installing a distribution box, it is important to ensure that the safety requirements are met.
2.Mobile sockets, TV cables: straighten out the construction location of TVs, computers, ** and other electrical appliances. If you want to set up the ** control point, you need to ask the construction master to wire the Hu and install the socket in a suitable position.
3.Install underfloor heating or radiators: not only enjoy the comfort of heating, but also consider the renovation of pipes in the installation to ensure that the wall is strong enough and the wall is not damaged.
4.Lighting arrangement: Good lighting design can make the indoor area more beautiful and comfortable, while the lighting of the old house may be limited. According to the decoration needs, different kinds of lighting layouts are carried out.
5.Installing bathroom facilities: If you want to reinstall the bathroom, you should consider laying floor tiles, renovating waterways, replacing water pipes, etc. At the same time, you can also try to use convenient facilities such as smart toilet seats and water purifiers.
In short, in the renovation of old houses, the importance of water and electricity construction cannot be ignored. The layout of electrical appliances that meet safety standards and the determination of pipelines are all necessary in hydropower planning.
-
First, how to go about the water and electricity for the decoration of the new house.
Hydropower can go to the top or to the ground. It is more convenient to maintain the water and electricity roof, for example, if there is a leak in the water pipe, we can not only find it in time, but also the maintenance cost will be lower; However, hydropower requires more materials to go to the top, and its construction is more difficult, and the installation cost will be relatively higher. The installation cost of hydropower is relatively low, and its construction period is relatively shorter; However, its later maintenance cost is high and the maintenance difficulty is relatively large.
Second, what should be paid attention to in hydropower transformation.
1. When the water and electricity at home are disturbed, we must inspect the materials of the hydropower. Hydropower renovation is a concealed project, if the quality of the materials used is not good, it is prone to aging and damage and other failures, and it is relatively troublesome to repair in the future. Therefore, we must check the quality of the water pipes and wires before installation, whether their brand specifications meet the design and construction requirements, and so on.
2. When hydropower transformation, we should pay attention to whether the construction personnel are in accordance with the standard, for example, the construction personnel can not make grooves on the load-bearing wall, especially the horizontal grooves. When we install water and electricity, we need to keep a certain distance between strong and weak electricity or hot and cold water pipes. Whether the position of the faucet and switch socket is installed correctly, whether the installation height meets the standard, etc.
3. After the completion of the hydropower transformation, we must carry out the acceptance of the hydropower to slow down the disadvantages. For example, check whether the fire zero ground wire of the switch socket is installed correctly, whether the number of sockets will be too small, whether the wire has a sleeve, and whether the wire circuit is set reasonably. After the waterway is installed, we have to carry out a pressure test to check whether there will be water leakage faults and so on.
After the acceptance of the hydropower transformation, we must also keep the hydropower transformation drawings.
-
The ways to go for the decoration of new houses are:
1. Go to the top. The water circuit goes to the top, which is not easy to be damaged in the later construction of the bench dismantling, and the construction protection work is easy;
2. Walk the ground. Hydropower walks on the ground, and there may be a risk of electricity leakage and electric shock in wet weather;
3. Sen is rough and sleepy and walks the wall. The circuit walks the wall, the switch socket is basically about a meter high, if the wire is wired from the ceiling from the head, the wall is damaged for a long time, and the wire used is more than the top surface.
-
As the age of the house increases, almost all old houses need to be renovated with water and electricity. When renovating the water and electricity of an old house, we should follow the steps below:
Step 1: Make a plan.
First of all, it is necessary to formulate a planning plan for hydropower transformation according to the actual situation, and you can refer to the norms and standards in the industry, and reasonably arrange the wires, sockets, switches and other locations according to the daily electricity consumption of your own family, so as to meet the daily electricity demand and be safe and stable.
Step 2: Dismantle the old water and electricity lines.
Dismantling the old water and electricity lines is the second step of the transformation, we must pay attention to the installation safety, leave flammable and explosive and other dangerous goods, but also pay attention to the crowd around the brigade, to avoid dust and dust at the mouth of the water and electricity lines, to prevent damage to the wires.
Step 3: Replace water pipes and wires.
Replace old water pipes and wires, and choose the best and stable pipes to improve the use effect. For steel stem pipes in closed spaces, pay attention to anti-corrosion to ensure the service life of the pipeline.
Step 4: Test the safety of the water and electricity lines.
After the replacement of the hydropower line, the final safety test must be done to ensure that the hydropower line device is firm, and operate reasonably in accordance with the planning plan to achieve the predetermined safe use effect.
Step 5: Install a tan sail bench and repair new wall sedan walls and wall tiles.
After the new water and electricity lines are laid, they need to be sealed and redecorated with new walls and tiles. The choice of walls and wall tiles should also correspond to the color and quality to beautify the home and highlight your own design style.
In general, the renovation of water and electricity in old houses needs to be operated in accordance with the planning plan, removing old water and electricity lines, replacing water pipes and wires, testing the safety of water and electricity lines, and decorating new walls and wall tiles to ensure the safe and efficient use of the home.
-
To go well in the decoration circuit of the old house, special attention needs to be paid to the following points:
1.Safety first: Safety comes first, don't ignore safety because of temporary convenience and saving money, be sure to do it in accordance with the specifications.
2.Fully consider household electricity consumption: When designing the direction of the circuit, it is necessary to consider household electricity consumption, especially during the evening rush hour, to ensure that there will be no problems in the operation of various electrical equipment.
3.The grounding wire should be set completely: the grounding wire is an important part of the house wire, and it must be set up to ensure the safety of the use of power equipment.
4.Fire and lightning protection measures should be in place: trillion fire and lightning protection measures are very important, especially in old houses, some equipment and lines are aging, and more measures are needed in this regard.
5.Reasonable layout: The layout of electrical appliances should take into account the flexibility and convenience, and various electrical equipment can be arranged in a suitable position according to the actual situation in the house.
6.Choose high-quality wires and cables: Noisy wires and cables are the "blood vessels" in the circuit, and high-quality wires and cables can reduce the loss of the line while ensuring the stability of power transmission.
7.Ensure that the circuit is concise and efficient: the circuit should be as concise and clear as possible, and do not let the wires and pipes be staggered together for future maintenance.
8.Practicality and aesthetics: When the wire or cable goes, it is necessary to take into account the practicality and aesthetics, so as not to affect the living environment and ensure the safety of the family.
In short, the old house decoration circuit needs to pay special attention to safety and practicality, so as to achieve long-term reliable results.
Hydropower decoration to go to the ground or to the top? Don't dwell on it, it's the right way to do it. >>>More
Hydropower totals about 7000, including the cost of slotting and the cost of water pipes and wires. >>>More
List of home improvement hydropower materials 2, auxiliary materials: wire pipe, tee, cassette, elbow spring, box joint lock, box joint lock, straight head, waterproof insulating tape, waterproof tape, broadband TV point. >>>More
1. In order to ensure the unification of the position of the switch and socket in the future, the hydropower master will play the line on the wall before slotting, and also use the cup to connect it uniformly, so that there will be no different levels of the socket in the future. Another point must be paid attention to in the process of hydropower transformation, the wire must be covered with insulating pipes. >>>More
The choice of floor color is a very important point when renovating and decorating old houses, especially affecting the overall style of home decoration. There are many classifications of flooring, according to the structure classification: solid wood flooring, laminate flooring, three-layer solid wood flooring, bamboo flooring, anticorrosive flooring, cork flooring and the most popular multi-layer solid wood flooring; Classified by use: >>>More