What should be highlighted in the construction organization design of the branch project?

Updated on society 2024-08-13
10 answers
  1. Anonymous users2024-02-16

    The divisional works include:

    1.Foundations & Foundations.

    2.Main structure.

    3.Architectural decoration and decoration.

    4.building roofing.

    5.Building water supply, drainage and heating.

    6.Building Electrical.

    7.Smart Buildings.

    8.Ventilation and air conditioning.

    9.Lift. Guidance should be highlighted.

  2. Anonymous users2024-02-15

    Important construction steps are prominent.

  3. Anonymous users2024-02-14

    Answers]: b, c, e

    The main selling code of the sub-project should include the general situation of the project and the analysis of construction characteristics; selection of construction methods and construction machinery; Preparation work plan for the construction of the subdivision (sub-item) project; the construction schedule of the subdivision (sub-item) project; various resource requirements plans; technical and organizational measures, quality assurance measures and safety construction measures; Design of the construction floor plan of the operation area. The description of this part of the construction organization design in 3 of the textbook is not completely consistent, and on the whole, China Travel Service includes the project overview, construction schedule and resource needs to suppress the plan.

  4. Anonymous users2024-02-13

    Answer] :d This question assesses the main content of the division (sub-item) construction organization and the construction of the lead bench. The main contents of the branch (sub-item) project construction organization and bureau travel plan are as follows:

    1) Analysis of project overview and construction characteristics; (2) the selection of construction methods and construction machinery; (3) Construction preparation work plan for subdivision (sub-item) project; (4) The construction schedule of the division (sub-item) project; (5) Various resource demand plans; (6) Technical and organizational measures, quality assurance measures and safety construction measures; (7) Design of construction layout plan of the operation area.

  5. Anonymous users2024-02-12

    Answer]: a, b, d

    The general design of the construction team, the construction organization design of the unit project and the construction organization design of the division (sub-item) project all have the contents of the construction schedule, the resource demand plan, and the project overview. Item C, the deployment of Xi Min Shi sedan car Lu Changong belongs to the content of the general design of the construction organization. Item e, the main technical and economic indicators are not included in the construction organization design of the division (sub-item) project.

  6. Anonymous users2024-02-11

    Grip the answer]: b, d

    The general design of the construction organization, the construction organization design of the unit project and the construction organization design of the division (sub-item) project all include the resource demand plan and the project overview. c option, the construction department is the content of the general design of the construction organization; e option, the main technical and economic indicators are the content of the general design of the construction organization and the construction organization design of the unit project. The construction organization design of the unit project and the construction organization design of the division (sub-item) project both include the construction schedule of Duan Feng, and the general design of the construction organization includes the general construction schedule.

  7. Anonymous users2024-02-10

    Answer]: a, b, d

    The main contents of the construction organization design of the unit project are as follows:

    1) Analysis of project overview and construction characteristics;

    2) the selection of the construction plan;

    3) Preparation work plan for the construction of the unit;

    4) The construction schedule of the unit project is slow and rotten;

    (5) Various resource demand plans;

    6) The general plan design of the construction of the unit disturbance service leakage;

    7) Technical and organizational measures, quality assurance measures and safety construction measures;

    8) Main technical and economic indicators (construction period, balance of resource consumption, difficulty in the utilization of machinery and equipment, etc.).

    The main contents of the construction organization design of the division (sub-item) project are as follows:

    1) Analysis of project overview and construction characteristics;

    (2) the selection of construction methods and construction machinery;

    (3) Construction preparation work plan for subdivision (sub-item) project;

    (4) The construction schedule of the division (sub-item) project;

    (5) Various resource demand plans;

    (6) Technical and organizational measures, quality assurance measures and safety construction measures;

    (7) Design of construction layout plan of the operation area.

  8. Anonymous users2024-02-09

    Answer] Lap Brigade: b, c, d, e

    The main contents of the construction organization design of the sub-project include: (1) the general situation of the project and the construction characteristics of the wheel bench analysis; (2) the selection of construction methods and construction machinery; (3) Construction preparation work plan for subdivision (sub-item) project; (4) The construction schedule of the division (sub-item) project; (5) Various resource demand plans; (6) Technical and organizational measures, quality assurance measures and safety construction measures; (7) Design of construction layout plan of the operation area.

  9. Anonymous users2024-02-08

    Answer]: b, c, d

    2021 2020 textbook p25 page.

    The main contents of the construction organization design of the unit project are as follows:

    1) Analysis of project overview and construction characteristics;

    2) the selection of the construction plan;

    3) Preparation work plan for the construction of the unit;

    4) The construction schedule of the unit project;

    (5) Various resource demand plans;

    6) General plan design of unit project construction;

    7) Technical and organizational measures, quality assurance and safety construction measures;

    8) The main technical and economic indicators (construction period, balance of resource consumption, utilization degree of machinery and equipment, etc.) The main contents of the construction organization design of the subdivision (sub-item) project are as follows:

    1) Analysis of project overview and construction characteristics;

    (2) the selection of construction methods and construction machinery;

    3) Preparatory work plan for the construction of the division (sub-item);

    4) Division (sub-item) project construction schedule;

    (5) Various resource demand plans;

    (6) Technical and organizational measures, quality assurance measures and safety construction measures;

    7) The construction layout design of the operation area, so the two responsibilities are shared

  10. Anonymous users2024-02-07

    Answers] :d, e

    The main contents of the construction organization design of the unit project are as follows: (1) the general situation of the project and the analysis of construction characteristics; 2) the selection of the construction plan; 3) Preparation work plan for the construction of the unit; 4) The construction schedule of the unit project; (5) the plan for the deferred demand of various resources; (6) Design of the general plan of the construction of the unit; 7) Technical and organizational measures, quality assurance measures and safety construction measures; (8) Main technical and economic indicators; The main contents of the construction organization design of the division (sub-item) project are as follows: (1) the general situation of the project and the analysis of construction characteristics; (2) the selection of construction methods and construction machinery; (3) Construction preparation work plan for subdivision (sub-item) project; (4) The construction schedule of the division (sub-item) project; (5) Various resource demand plans; (6) Technical and organizational measures, quality assurance measures and safety construction measures; (7) Design of construction layout plan of the operation area.

Related questions
13 answers2024-08-13

Construction organization design is an important means to implement scientific management of construction activities, which has the dual role of strategic deployment and tactical arrangement. It embodies the requirements for the realization of the capital construction plan and design, provides the content of the construction preparation work at each stage, and coordinates the interrelationship between the construction units, construction types and resources in the construction process. >>>More

7 answers2024-08-13

First, the general situation of the project.

This project is a vertical storage tank insulation project, the height of the storage tank is 10 meters, the diameter is 5 meters, the insulation material is polyurethane foam board, and the insulation thickness is 100mm. The construction site is an industrial park. >>>More

14 answers2024-08-13

What you mean is to do the plan for review, and I am the supervisor, who specializes in reviewing this. First of all, the company's qualifications should be complete, the on-site environment should be included, the arrangement of personnel, the arrangement of schedule, the on-site management system, safety and fire prevention measures, measures after the delay of the construction period, and so on.

9 answers2024-08-13

There are 3 common versions;

There are three common types: construction organization design in the design report. >>>More

1 answers2024-08-13

The basic way of flow construction.

First, wait for the rhythm of the flow of construction. >>>More