Information required to apply for EIA:
1) Application report (including a brief text description of the basic information of the unit, the content of the application and the business ability related to the content of the application);
2) Application Form for Environmental Impact Assessment Qualification of Construction Projects;
3) Certificate of legal personality (copy of the business license of the enterprise legal person or the original and copy of the certificate of the enterprise legal person) and a copy of the articles of association of the enterprise legal person;
4) Proof of workplace (real estate certificate, lease contract or other valid certificate);
5) Labor relationship certificate of full-time technical personnel for environmental impact assessment;
6) Copies of academic certificates of full-time technical personnel in environmental impact assessment, registration certificate of nuclear safety engineer, etc.;
7) Proof of relevant performance of units and individuals (the number submitted can meet the minimum requirements of the corresponding qualifications): Unit performance: the first page of the archive, the list of personnel and the copy of the approval version of the environmental impact report (form) submitted for approval within the validity period of the certificate; Personal Achievements:
During the validity period of the certificate, the environmental impact assessment engineer presided over the preparation of the environmental impact assessment engineer for approval, the first page of the archive, the list of personnel page and the copy of the reply.
8) Resume and copy of identity document of the legal representative;
9) Original and duplicate of qualification certificate.
1) The site selection conforms to the overall land use plan, the overall urban plan or the township construction plan, and meets the requirements of environmental functional zoning;
2) in line with industrial policies;
3) Meet the requirements of cleaner production;
4) The discharge of pollutants does not exceed the pollutant discharge standards stipulated by the state and the province;
5) Construction projects in areas where the total amount of pollutant discharge control is implemented shall meet the requirements for the total amount of pollutant discharge control;
6) The environmental impact caused by the construction project meets the environmental quality requirements determined by the environmental functional zoning of the project location;
7) Mineral resources mining and dressing projects meet the requirements of nearby construction and regional ecological effective remediation and restoration;
8) Other requirements provided for by laws and regulations.
-
Application materials 1. Application form for approval of environmental impact of construction project (one copy);
2. Schematic diagram of the geographical location of the project (one copy of A4 paper);
3. Schematic diagram of the project layout (one copy of A4 paper);
4. Project proposal approval document or filing approval document (original and one copy);
5. Certificate of planning conformity (original and one copy);
6. Certificate of enterprise name (original and one copy);
7. Letter of authorization of ** person (stamped with the official seal of the unit and signed by the legal representative, one original);
8. Environmental impact registration form of construction project (in triplicate).
Permit Procedure Acceptance Site Survey Registration Form Review Decision.
-
There are no specific requirements for industrial land, but at the very least, it is not allowed to use land illegally, occupy cultivated land or basic farmland, and cannot build industrial plants in nature reserve areas. In other words, it is necessary to distinguish the nature of the land and conform to the land use plan and construction plan.
EIA procedures:
1. Application and acceptance.
In accordance with the provisions of the "Catalogue of Classified Management of Environmental Protection of Construction Projects", the construction unit shall organize the preparation of environmental impact reports for construction projects that may cause major environmental impacts.
Submit an application to the State Environmental Protection Administration in a statutory form and submit relevant materials. The administrative examination and approval hall of the State Environmental Protection Administration accepts the environmental impact report and related materials of the construction project submitted by the construction unit, and verifies it, and makes a decision to accept it or not to accept it.
2. Project review.
The Environmental Impact Assessment Management Department of the State Environmental Protection Administration shall review the environmental impact report of the construction project. If a technical assessment is required, the assessment agency shall organize experts to conduct a technical assessment of the environmental impact report, and the assessment agency shall submit the assessment report within 30 working days.
3. Project approval.
The Department of Environmental Impact Assessment and Management of the State Environmental Protection Administration shall put forward a proposal for examination and approval based on the review and assessment conclusions, which shall be countersigned by the relevant departments and submitted to the special meeting of the Director of the State Environmental Protection Administration and the Executive Committee of the State Environmental Protection Administration for deliberation, and the approval documents shall be handled after deliberation and approval.
4. Hearings and information disclosure.
The State Environmental Protection Administration publishes the information on the construction projects accepted in ****; Before making a decision to approve, publicize the information of the construction project to be approved; After the approval decision is made, the approval result will be made public.
-
Legal Analysis: Yes. According to the current regulations in China, the EIA is the first approval right, relatively speaking, it has no great relationship with the land, and the EIA document is only an environmental evaluation of your above-ground project, and does not evaluate the nature of the land, that is, if your land is not legal, the EIA can still pass.
Legal basis: Regulations on the Administration of Work Safety in Construction Projects
Article 6 The construction unit shall provide the construction unit with information on underground pipelines such as water supply, drainage, power supply, gas supply, heat supply, communications, radio and television, meteorological and hydrological observation data, adjacent buildings and structures, and underground engineering in the construction site and adjacent areas, and ensure that the data are true, accurate and complete. When the construction unit inquires about the materials provided for in the preceding paragraph from the relevant departments or units due to the needs of the construction project, the relevant departments or units shall provide them in a timely manner.
Article 7 The construction unit shall not put forward requirements for survey, design, construction, engineering supervision and other units that do not comply with the laws, regulations and mandatory standards for construction project safety production, and shall not compress the construction period agreed in the contract.
Article 8 When the construction unit prepares the project budget estimate, it shall determine the cost of the safe working environment and safe construction measures of the construction project.
-
Yes. According to the current regulations in China, the EIA is the first approval right, relatively speaking, it has no great relationship with the land, and the EIA document is only an environmental evaluation of your above-ground project, and does not evaluate the nature of the land, that is, if your land is not legal, the EIA can still pass. In addition, generally before the land approval procedures, the EIA procedures are pre-empted, and the EIA approval procedures are provided first.
-
Summary. Article 10 of the Environmental Protection Law shall be in charge of environmental protection and shall implement unified supervision and management of environmental protection work across the country; The competent departments of environmental protection of local people's governments at or above the county level shall carry out unified supervision and management of environmental protection work in their respective administrative regions.
The relevant departments of the people's ** at or above the county level and the environmental protection departments of the armed forces shall, in accordance with the provisions of the relevant laws, supervise and manage environmental protection work such as resource protection and pollution prevention and control.
Can I apply for an EIA without a land certificate?
Hello, consult a lawyer for your service, wait for me a moment.
You can't do an EIA without a land certificate, and you can't do an EIA without a land use certificate, which proves that your land has not been approved, and the land procedures are not legal, so in terms of EIA, the land procedures will not be recognized.
Article 10 of the Environmental Protection Law shall be in charge of environmental protection and shall implement unified supervision and management of environmental protection work across the country; The competent departments of environmental protection of local people's governments at or above the county level shall carry out unified supervision and management of environmental protection work in their respective administrative regions. The relevant departments of the people's ** at or above the county level and the environmental protection departments of the armed forces shall, in accordance with the provisions of the relevant laws, supervise and manage environmental protection work such as resource protection and pollution prevention and control.
If you have anything else you want to ask, you can say it, and I will try my best to answer it for you!
I'm glad to answer for you this time! If you are satisfied with my above targeted reply, you can give me a like, and click on my avatar to follow, so that I can continue to answer for you. The cooperative lawyers of the platform look forward to solving your problems next time!
-
First of all, the EIA is carried out in combination with the filing documents, and the procedures for the land used for the construction project can only be handled after the EIA is approved.
First of all, the project is recorded, the project is subject to environmental impact assessment (approved by the environmental protection management department), and the safety assessment should also be carried out for the project involving safety production (approved by the safety management department), and the health management department, urban planning management department, land resources management department, and fire management department are also required for occupational diseases.
Article 8 of the Law of the People's Republic of China on Environmental Impact Assessment stipulates that.
The relevant departments, local people** at or above the level of cities divided into districts and their relevant departments, for their special plans for industry, agriculture, animal husbandry, forestry, energy, water conservancy, transportation, urban construction, tourism, and natural resources development that organize the compilation of bridges, shall organize an environmental impact assessment before the draft of the special plan is submitted for examination and approval, and submit an environmental impact report to the organ that examines and approves the special plan.
The right to use industrial land can be bought and sold, but the ownership of industrial land cannot be transferred, as its ownership is owned by the State. If the conditions are met, with the approval of the municipal and county people's land management departments and real estate management departments, the ownership of the allocated land use rights and above-ground buildings and other attachments can be transferred, leased and mortgaged.
First, the preliminary preparation of the project.
First of all, obtain the right to use the proposed land, plan the layout of the new building, and apply to the competent department for a new project report (project application) to clarify the use of the new building, planning layout, construction scale, total investment cost, etc. After obtaining the approval of the project, it will enter the preparatory stage of project construction. >>>More
Industrial land has a plot ratio coefficient, and the plot ratio correction coefficient of the sample site land price and the benchmark land price should be distinguished. In the process of evaluating the benchmark land price, the land price of the sample site under the specific plot ratio obtained from the survey is revised to the land price under the set standard plot ratio. The plot ratio correction in the benchmark land price correction system is to revise the base land price under the set standard plot ratio to the parcel ** under the specific plot ratio in the parcel ** assessment. The correction coefficients should be different in the opposite direction and in essence.
Regarding the issuance and implementation of the "Control Indicators for Construction Land for Industrial Projects". >>>More
Approval process for industrial land and plant construction 1, land planning adjustment and approval (enterprise-land bureau-provincial land department); 2. Obtain approval; 3. Application for approval of agricultural conversion (local**-provincial**); 4. Obtain approval; 5. Bidding, auction and listing (pay the deposit, Land Bureau); 6. Transaction confirmation (Land Bureau); 7. Issue a notice of providing construction land (local ** document); 8. Pre-examination opinion of project land (Land Bureau); 9. Issue a blue line map (local** or park); 10. Issue a red line map (issued and stamped by the Land Bureau); 11. Opinion on site selection of construction projects (Planning Bureau); 12. EIA report form or registration form or report (Environmental Protection Bureau); 13. Project approval or filing (Development and Reform Bureau); 14. Land use planning permit (Planning Bureau); 15. Sign the transfer contract (Land Bureau); 16. Pay the transfer fee, deed tax, cultivated land occupation tax, etc.; 17. Apply for land certificate (Land Bureau). 18. Architectural design scheme (Planning Bureau); 19. Fire protection design of construction engineering (Public Security Bureau); 20. Civil air defense declaration (civil air defense office); 21. Planning permit for construction projects (Planning Bureau or Construction Bureau); 22. Construction drawing design review (Construction Bureau); 23. Construction permit for construction projects (Construction Bureau); 24. Completion of fire protection acceptance (Public Security Bureau); 25. Completion and acceptance of construction projects (Construction Bureau); 26. Housing property right certificate (Construction Bureau); 27. Submit the construction project file (Urban Construction Archives of the Construction Bureau).