How much does it cost to build a two storey 50 square meter house?

Updated on Three rural 2024-08-12
16 answers
  1. Anonymous users2024-02-16

    I don't know if you occupy an area or a construction area of 50 square meters, if it covers an area of 50 square meters, the two floors may be about 120 square meters, if the contractor does not package the material, almost 100,000 can be done, I can give you a list of about **, labor 210 or so a flat is 20,000 5 (including masonry, carpentry, plumber, building materials such as formwork, braces, etc.), the foundation of 10,000 is wanted. The red brick is 4 cents, the two-story building costs about 10,000 bricks, that is, 10,000 yuan, the two-story steel bar is about 8,000 yuan, and the cement is estimated to be 20 tons, 300 a ton, almost 6,000 yuan. The cost of sand and cement is about the same, these are the big heads, and I didn't count some small heads, such as wires, nails, wires, etc.

    That's 100,000 is enough. I'm all counting under normal circumstances, if your foundation is a field, the foot that needs to be dug will be deeper (the depth is subject to the old bottom), in that case, ** will go up.

  2. Anonymous users2024-02-15

    How much does it cost to build a two-storey 50-square-meter house, which needs to consider the specific housing price of your location, the land**, the construction company** and other factors.

    The area of the house is known: 50 square meters.

    Assuming that the house price per square meter is 1000 yuan, then the total price of the house is:

    50 times 1000 = 50000$.

    Assuming that the construction cost per square meter is 500 yuan (excluding the land cost), then the total price of the house is:

    50 times 500 times 2 = 50000$ yuan.

    It's important to note that this is only an approximate estimate, and the actual cost will vary depending on factors such as your specific needs, the quality of the building, and the housing prices in your area. It is recommended to find a professional construction company or real estate developer in the local area for detailed consultation and **.

  3. Anonymous users2024-02-14

    This has to be combined with the local construction costs.

    Such as labor, housing transportation and so on.

    It will take about 10-150,000 yuan (excluding internal decoration and land costs).

  4. Anonymous users2024-02-13

    According to the local market price, it will cost 3 million yuan to 5 million yuan to build a two-storey house of 150 square meters per floor.

    If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].

    First of all, the cost of building a house is one of the main expenses of building a house. Construction costs include land purchase costs, building material costs, construction labor costs, etc. The cost of land purchase depends on the location, area and other factors, and it is recommended to consult a local real estate agent or relevant department when purchasing land to obtain accurate ** information.

    The cost of building materials includes cement, bricks, steel bars, etc., which will be affected by factors such as market supply and demand and material quality. The cost of construction labor is based on the local labor market.

    Secondly, the design fee is also an expense to consider. The design fee includes architectural design, structural design, water supply and drainage design, etc. These design fees vary depending on the designer's popularity, experience, and difficulty of the design.

    It is advisable to find a qualified designer to design and negotiate the cost with the designer.

    In addition, you need to take into account the approval fee. Building a house requires relevant approval procedures, including land use certificates, construction project planning permits, construction permits, etc. These fees are based on locally** charges.

    Finally, there are other costs that need to be taken into account, such as the cost of water and electricity installation, interior decoration costs, furniture purchase costs, etc. These fees vary according to individual needs and tastes.

    To sum up, it takes roughly 3 million yuan to 5 million yuan to build a two-storey house of 150 square meters per floor. The specific cost will be affected by a variety of factors, and it is recommended to consult with a local construction company or relevant professional to obtain accurate ** information before proceeding with specific construction.

    Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget, want to find a good company, learn more about decoration knowledge on Tuba Rabbit, click here, free 1 to 1 for your home decoration services: [Tuba Rabbit ** official website].

    Kunming - [Kunming Decoration Strategy Guide].

    Suzhou - [Suzhou Decoration Strategy Guide].

    Hefei - [Hefei Decoration Strategy Guide].

    Fuzhou - [Fuzhou Decoration Strategy Guide].

    Beijing - [Beijing Decoration Strategy Guide].

    Dalian - [Dalian Decoration Strategy Book].

    Hangzhou - [Hangzhou Decoration Strategy Guide].

    Shanghai - [Shanghai Decoration Strategy Guide].

    Tianjin——[Tianjin Decoration Strategy Guide].

  5. Anonymous users2024-02-12

    The cost of building a house is different in each place, if you build such a big house in the urban area, it will cost at least a million, if you build this kind of house in the countryside, it should be more than 100,000 or 200,000 yuan for two floors.

  6. Anonymous users2024-02-11

    450,000 yuan for a rough house.

    At present, the cost of real estate development and construction in urban areas (rough houses) is about 1,500 square meters, so the rough houses are built about 450,000 yuan (excluding land prices, decoration fees and related taxes and fees).

  7. Anonymous users2024-02-10

    Generally speaking, it may be at least about five or six hundred thousand, because this house is also relatively large, and now the materials are relatively expensive.

  8. Anonymous users2024-02-09

    Then it depends on what you build*** and broken, if you want to be better, it will definitely be more expensive. But you can't build a house, you have to look at the money, you have to look at the quality. Be sure to see *** a little. It's okay to spend a little more.

  9. Anonymous users2024-02-08

    How much does it cost to build a two-story house of 150 square meters? I don't have a foundation this month, and it's still relatively expensive, so I don't need to say the price.

  10. Anonymous users2024-02-07

    Each floor is 150 square meters, a total of two floors, about 20 to 350,000 yuan, you can cover it without decoration.

  11. Anonymous users2024-02-06

    As of January 2020, based on current steel**.

    A square is a little more than 400, and it costs about 200,000 yuan to build a two-story steel structure building, which varies from region to region.

    Under normal circumstances, rural housing construction is based on the demolition and reconstruction of the original old houses, or villagers apply for homestead land to build houses. When building a house in a rural area, it is necessary to first apply to the relevant departments, and the construction will be carried out after the approval of the relevant departments.

    There are relevant regulations on the area of houses built in rural areas, for example, the area of homesteads built by villagers in Fujian is limited to 80-120 square meters. I believe that when you build a house, you can't increase the area of the house without permission.

    If there is a special design drawing when building a house, then the construction needs to be carried out in strict accordance with the construction drawings when building the house, and the opinions of the construction party are only used as a reference.

    Information on building a house:

    When building a house, it is best for you to supervise the work in person, and you can negotiate with the construction party in time if you have any problems. When building a house, it is important to lay a good foundation, which should be free from flash floods, mudslides, etc. The depth of the foundation can be determined according to the height of the house.

    When building a house, budget for renovations. You need to choose how big a house to build according to your economic strength, and prepare construction materials such as steel, cement, bricks and tiles.

    When buying decoration building materials, you can ask relatives and friends who do decoration to help you choose. When building a house in the countryside, you also need to pay attention to whether it will block the light of your neighbors, so as not to affect the feelings between neighbors. <>

  12. Anonymous users2024-02-05

    1. What aspects of building a house in the countryside need money?

    1. Handle legal handling fees, approval fees, etc. for building a house.

    2. The cost of the overall design drawings of the house.

    3. The cost of building materials required to build a house.

    4. Contractors and workers' labor costs.

    5. The cost of interior decoration of the house.

    2. Land transfer fee and land transfer fee.

    Many people in rural areas tear down their original houses and build new ones, but if they don't have a homestead, there are two solutions:

    1. Go to the person who is willing to transfer the right to use the homestead to buy, which will naturally incur a transfer fee. And this cost may be tens of thousands, or hundreds of thousands, because of the difference caused by different regions and different locations. However, relatives and friends in the countryside transfer to each other, and the ** is generally not elevated.

    In some places, the income from the transfer of homesteads is owned by the collective, which makes ** different.

    2. Declare the homestead to ** and pay the land transfer fee. This fee is about 30% to 40% of the land appraisal**, and the land appraisal** varies from place to place, so you need to consult the local ** department.

    3. Approve the cost of construction application to **.

    According to China's relevant land regulations, rural houses must first be submitted to the local relevant departments for construction approval, which will generate production costs, approval fees, surveying and mapping fees, etc. Among these costs, the cost of production is generally only 5 yuan, and other costs may be somewhat different in each place because of the different housing area and local policies, but in the cost of self-built houses, the cost of approval and construction is a very small part, and the specific cost can be consulted with the relevant departments.

    4. How much does it cost to build a house in the countryside?

    1. Handle legal handling fees, approval fees, etc. for building a house.

    Rural housing needs to have legal procedures, first to the first approval, to pay the cost of work, examination and approval, surveying and mapping fees, etc.

    2. The cost of the overall design drawings of the house.

    If you want the room layout to look good, you need to ask the designer to be involved, etc., and the approximate ** is between 20 yuan and 100 yuan per square meter.

    3. The cost of building materials required to build a house.

    The cost of building materials is the most expensive cost of building houses, the advantages and disadvantages of building materials are also different, calculated by the cost of building materials at a medium level, with a total of 200 square meters of rural houses on two floors as the standard, according to the budget, 200 square meters of self-built houses need about 160,000 building materials costs, but the cost of building materials varies from place to place, and it depends on the local **.

  13. Anonymous users2024-02-04

    It costs about 400,000. Because the current material cost and labor cost are very expensive, if you want to build a 200-square-meter two-story building, at least 400,000 yuan.

  14. Anonymous users2024-02-03

    If the land is your own home, it will cost about 300,000 yuan.

  15. Anonymous users2024-02-02

    Ranging from hundreds of thousands to millions, it depends on how to build and decorate, and the cost of different man-made houses is different.

  16. Anonymous users2024-02-01

    Summary. The design methods of 60 square two-story buildings are: first, select parallel line building structure, and use the design structure of parallel lines to make the space concise; 2. Effectively place decorations, and try to place them below the field of vision when people stand up; 3. Make flexible use of lamps and curtains, small areas of houses are suitable for simple lighting fixtures, and curtains should be as light and thin as possible; 4. Avoid rigid partitions, which will take up more space.

    1. For a 60-square-meter two-story house, the use of parallel line structure for design and decoration can make the overall space appear more concise and spacious, and the visual effect of such a house is not easy to produce visual fatigue, which can bring a fresh and comfortable atmosphere effect. 2. Effectively place decorations because the overall space area of the 60-square-meter house is relatively small, when adding decorative items to such a space, we should pay attention to the appropriate amount, but if the wall itself has rich colors, then such a wall is not recommended to add other decorative items, but it will make the space appear more cluttered, and the indoor decorative items should be placed below the visual level when the human body stands, so as to avoid the obstruction of the decorative items in the line of sight.

    Kiss, almost.

    Rural bungalows. Kiss, enough.

    The design methods of 60 square two-story buildings are: first, select parallel line building structure, and use the design structure of parallel lines to make the space concise; 2. Effectively place decorations, and try to place them below the field of vision when people stand up; 3. Make flexible use of lamps and curtains, small areas of houses are suitable for simple lighting fixtures, and curtains should be as light and thin as possible; 4. Avoid rigid partitions, which will take up more space. 1. For a 60-square-meter two-story house, the use of parallel line structure for design and decoration can make the overall space appear more concise and spacious, and the visual effect of such a house is not easy to produce visual fatigue, which can bring a fresh and comfortable atmosphere effect.

    2. Effectively place decorations because the overall space area of the 60-square-meter house is relatively small, when adding decorative items to such a space, we should pay attention to the appropriate amount, but if the wall itself has rich colors, then such a wall is not recommended to add other decorative items, but it will make the space appear more cluttered, and the indoor decorative items should be placed below the visual level when the human body stands, so as to avoid the obstruction of the decorative items in the line of sight.

    Isn't 30,000 enough?

    Dear, a little nervous, now the prices are in **.

Related questions
14 answers2024-08-12

Find a suitable small room on the first floor of the building and install a water-circulating coal-fired boiler that matches the heating area. 1. The necessary auxiliary equipment of the boiler is about a plastic water storage tank about liters; 2. A boiler feed pump is placed below the water tank; 3. Build a low coal storage hopper (convenient for temporarily placing a small amount of coal); 4. A pipeline pump and drain valve group should be installed on the return pipeline of the boiler; 5. A high-level water tank (about 50 liters); The chimney (consistent with the flue size of the boiler) can be made of welded steel pipes, and the connection between the outdoor vertical pipe of the flue and the horizontal pipe must be connected with a flange tee, and a flange down the tee is blocked with a blind plate to facilitate the ash removal of the flue. 2. Precautions for pipeline installation: >>>More

6 answers2024-08-12

There is a 10-20 mm thick cement mortar stucco layer on the outer surface of the load-bearing column, and the transverse cracks you said only appear within this thickness, which is not actually a crack in the column, but only a crack in the stucco layer (because the stucco layer is caused by crusting or condensation, and the crack is very fine and short, it will not affect the quality of fine decoration), and the internal concrete structure of the real column will not have cracks. >>>More

8 answers2024-08-12

Nowadays, many young people buy a house to buy a small apartment, because it is too high and stressful, so it is not just a small apartment house, if there is not enough space, what should I do? If certain kinds of homes are relatively tall, they can be a small cubicle where they will come out of the space and one floor will become two floors, so you have the feeling of a **room. >>>More

8 answers2024-08-12

It depends on the local building codes and regulations, as well as the design and use of the house. Generally, if a house is built in accordance with local building codes and meets the relevant regulatory requirements, then it is compliant. >>>More

24 answers2024-08-12

It's two stories high, and there's only Lelouch's body, kid, you've seen too much animation.