Give some advice for your reference, 1On the one hand, you must ensure your authority, and on the other hand, you must put down your body and blend in with the masses.
You have to do both, and the balance in the middle must be up to you.
If you don't have enough authority, you can't control others, and no one listens to your words. Too much authority can easily provoke rebellion. Bad work push.
If you don't fit in enough, others won't listen to you; Too much incorporation and no authority.
Oh, you have to take advantage of it.
2.Specific actionable recommendations:
When you are idle, you can arrange training, such as the training of the management system of the workshop, the training of 5S, and the training of basic knowledge. The first is that the leader is good-looking, the second is conducive to the standardization of employees, and the third is to establish your authority. In addition, it is really good for the work to be carried out.
Training is a great time for you to cultivate authority and connections, such as the mold technology you are good at, some management knowledge, and some things that you understand that others don't understand, so that others know that you have material and are not nerds.
Get on good terms with the old squad leader, and they will teach you something that is very strong in practical experience. Of course, advice is the main thing, and guidance is supplemented. It must not be forgotten that you are their leader.
Ask your leaders for their thoughts.
The things in the book, such as material knowledge, are not unimportant, but it is more important to deal with people and deal with specific matters. Management is made.
-
Lack of plastic parts: 1. The supply of plastic is not stupid, the temperature is low, and the injection volume is not enough. 2. The injection pressure is small, the injection time is short, and the pressure holding time is short.
3. The injection speed is too fast or too slow. 4. The nozzle temperature is low, the blockage or the aperture is too small, and the temperature of the barrel is low. The size is not as stable as it is:
1. The molding conditions (temperature, pressure, time) are unstable, and the molding cycle is not positively consistent. 2. The performance of the injection molding machine is poor or uneven plasticization. 3. The electrical or hydraulic system of the machine is unstable.
There are bubbles: 1. The material temperature is too high and the heating time is too long. 2. The injection pressure is small.
3. The injection speed is too fast.
-
In terms of rules and regulations, that's all.
Then there is the technical aspect, the achievement of the technical requirements.
To fulfill the requirements of these main duties [Eat Whales].
-
Notes:
Keep the injection molding machine and the surrounding environment clean;
Before starting the machine, first check the safety protection device of the machine;
When the temperature of the barrel does not reach the set value, it is never allowed to rotate the screw to avoid spraining the screw;
When cleaning the mold cavity, the oil pump must be turned off to avoid accidents;
When working, it should be checked whether the mold is installed firmly, and when the product is not completely demolded, the mold should never be allowed to be closed, so as not to damage the cavity. When cleaning the foreign body in the mold, a copper rod must be used, and the action should be light to avoid damage to the cavity;
When clamping and taking the handle, it must be operated by hand with a clamping plier, and it must not be operated by hand;
Flammable and explosive materials such as rust inhibitors are strictly forbidden to be placed on the workbench of the equipment;
The material must be dusted and unpacked before it can be passed into the purification room, and auxiliary tools such as clamping pliers and bins must be disinfected (alcohol wiping) before use;
9. The environment should keep the raw materials clean and dry, and there should be no sundries, and the materials must be placed in the designated place to prevent metal impurities from being mixed in, and crushed in time;
10. After the adjustment of the product parameters of each batch is completed and the self-inspection is qualified.
The first and second molds are tested by the quality inspection department as the first mold, and the process parameters required by the process card are recorded;
11. Qualified parts enter the clean warehouse in time after packing;
12. Make various records and fill in all kinds of ** carefully;
13. After each batch of products or a total of 100,000 products, the wear and tear of the mold should be checked and maintenance records should be made;
14. Maintain injection molding equipment carefully and in a timely manner, and report and deal with problems in a timely manner.
-
Injection molding processing is a 24-hour continuous operation, involving plastic raw materials, injection molds, injection molding machines, peripheral equipment, tooling fixtures, sprays, toners, packaging materials and auxiliary materials, etc., and many positions, complex division of labor, how to make the production and operation of the injection molding workshop smooth, to achieve "high quality, high efficiency, low consumption", is the goal that each injection molding manager expects to achieve, the management of the injection molding workshop directly affects the injection molding production efficiency, defective rate, material consumption, machine manpower, delivery time and production costs. Injection molding production mainly lies in control and management, different injection molding managers, their ideological concepts, management styles and working methods are different, and the benefits brought to the enterprise are completely different, or even very different
The injection molding department is the "leading" department of each enterprise, if the management of the injection molding department is not done well, it will affect the operation of various departments of the enterprise, resulting in the quality delivery time can not meet the requirements of customers and the competitiveness of the enterprise declines.
The management of the injection molding workshop mainly includes: the management of raw materials, toners, nozzle materials, the management of the crushing room, the management of the batching room, the use and management of injection molding machines, the use and management of injection molds, the use and management of tooling and fixtures, staff training and management, the management of safety production, the management of the quality of plastic parts, the management of auxiliary materials, the establishment of operation processes, the formulation of rules and regulations, the formulation of job responsibilities, and the management of model documents.
Shooting lines, bubbles.
The formation of the injection pattern is generally due to the injection starting too quickly, so that the air in the front section of the mold cavity. >>>More
There is no doubt about this, it is absolutely valid.
But what we have to consider is, how does the injection molding machine achieve energy saving, and at the same time, will it have any impact on the injection molding machine? How much energy saving can be achieved in general, that is, how much value can be brought to you. >>>More
The efficiency of the injection molding manipulator is much higher than that of manual work, and it is also more cost-saving, and it only needs power supply to work continuously without rest. The manipulator can pick up the piece for 3 seconds, and it is not afraid of being hot. According to reports, Bronte's injection manipulator has used a lot of patents, and the efficiency is much higher than that of other manufacturers' injection manipulators.
Shrimp: Cumulative back in the chart.
The enterprise is the foothold of safe production.