How to do the completion information of the decoration project

Updated on society 2024-02-20
7 answers
  1. Anonymous users2024-02-06

    There are in the building construction quality specifications.

  2. Anonymous users2024-02-05

    The project acceptance data is divided into the following parts: the first part, the preliminary documents of the project 1Feasibility study report and annex 2Approval opinions of the feasibility study report 3

    Plan task book and approval 4The application documents for the inclusion of the construction project in the annual plan 5The construction project is included in the approval document of the annual plan and the annual plan item list 6

    Approval documents for land requisition, demolition and relocation (including documents for demolition, compensation, etc.), etc. The second part, the project completion acceptance documents. 1.

    Project Overview Table 2Project completion summary 3Unit (sub-unit) project quality completion acceptance record 4

    Unit (sub-unit) project quality control data verification record) 5.Unit (sub-unit) engineering safety and function inspection data verification and main function spot check records. The third part, construction technical documents; Include.

    1. Architectural and Structural Engineering; 2. Building water supply, drainage and heating engineering documents; 3. Building electrical engineering documents. Fourth, intelligent building engineering documents; 5. Ventilation and air conditioning engineering documents 6. Elevator engineering documents. Part IV:

    In addition to the above documents and materials, the fifth part of the supervision documents and materials such as material inspection and engineering inspection: as-built drawings; 1. Building as-built drawings; Second, the structure of the as-built drawing; 3. As-built drawings of water supply and drainage; Fourth, the heating as-built drawing; 5. Electrical as-built drawings; 6. Ventilation and air conditioning as-built drawings. Part VI:

    All kinds of audio-visual materials related to the project (indicating the text description, project name, location, time, construction site, etc.) and other related materials.

  3. Anonymous users2024-02-04

    There are many, such as: contract, enterprise business license, safety production license, enterprise qualification certificate, project completion acceptance form, completion report, unit project delivery acceptance certificate, branch (sub-division) project acceptance record, quality control data, perception quality acceptance, construction organization design application form, concealed inspection and acceptance record, material structure equipment inspection form, test report and certificate of purchased products or materials, engineering inspection batch quality acceptance record, commencement report (or resumption of work application form), If there are additional items, there must be visa forms, design disclosure records, drawing review records, all of which have a fixed style. If Party A has a supervisor of this project, you can communicate with them to determine the content of the completion data.

    The main procedures for the completion and acceptance of the decoration project.

    1), completion and acceptance of the preparation refers to the project delivery and acceptance before the preparation of the project management department specific operation and implementation, the project manager is fully responsible, to establish the completion of the team, do a good job in the self-inspection of the project entity, collect, summarize, sort out the complete project completion data, do a solid job before the completion of the project and the acceptance of the completion of the completion and management of the basic work.

    2) Prepare the completion and acceptance plan, and the plan is the guide to action. The project management department should carefully prepare the completion and acceptance plan, and incorporate it into the construction and production plan of the enterprise for implementation and management. The project manager department shall fill in the project completion report and the project completion inspection form and submit it to the project supervision agency for signature.

    3) Organize on-site acceptance, first of all, the project supervision agency shall carry out pre-acceptance of the project according to the construction drawings, construction and acceptance specifications and quality inspection standards, construction contracts, etc., and submit the project completion and acceptance evaluation report; Then, the employer shall examine and approve the project completion report submitted by the contractor, and organize the relevant units to carry out formal completion and acceptance.

    4) Carry out the completion settlement, and the completion settlement of the project should be synchronized with the completion and acceptance work. After the completion and acceptance report of the project is completed, the contractor shall submit the project settlement report and complete settlement information to the employer within the specified time. The contractor and the issuer shall determine the project price based on the information of the project contract and project changes.

    5) The transfer of completion data, sorting and handing over the completion data is an indispensable and meticulous work in the completion and acceptance stage of the project. The project completion materials handed over by the contractor to the employer shall be complete, complete and accurate, and shall comply with the relevant specifications of the national urban construction archives management and capital construction project (engineering) archives management and construction project documents for archival arrangement.

    6), for delivery procedures, the project has been formally organized for completion of an acceptance, construction, design, construction, supervision and other relevant units have been signed on the project completion and acceptance report, the project completion settlement is completed, the contractor should go through the project handover procedures with the employer, sign the project quality warranty, evacuate the construction site, and formally release the on-site management responsibility.

  4. Anonymous users2024-02-03

    1. Construction organization design: construction organization design application form for inspection (time filling: one or two days before the start of construction) attached:

    Technical documents application form (two units to be stamped with the official seal) (time filled: one or two days before the start of construction) attached: the preparation of the construction organization design, the construction organization design in the preparer is the constructor or site technician, the auditor is the company's chief engineer (chief technical director), the name to be handsigned, can not be printed, the preparation unit to stamp the official seal.

    Time to fill: one or two days before the start of construction) 2, the commencement report: the project commencement of the application form for inspection (time to fill:

    On the day of commencement or the first day) attached: the project commencement report is submitted for inspection and molding, and the project seal can be stamped. (Time filled:.)

    On the day of construction or the first day) 3, qualification inspection: general inspection application form inspection (time filling: Tongdan on the day of construction or the first day) attached:

    Enterprise qualifications, safety construction permits, engineering construction permits, three types of personnel certificates (three types of personnel refer to: the company's chief engineer, the company's chief technical leader, and the chief safety officer), and attached: project manager, technical leader, quality inspector, safety officer, construction officer, data clerk, and other personnel qualification certificates, electricians, mechanical operators, scaffolding workers and other special types of personnel certificates.

    4. Project positioning: (time filling: on the day of commencement) construction survey pay-off inspection application form inspection attached:

    Engineering positioning measurement record inspection. Note: The positioning record should be stamped with the project seal of the construction party and the supervision party.

    5. Project overview: general inspection application form for inspection (time filling: one or two days after the start of construction).

  5. Anonymous users2024-02-02

    According to the provisions of the "Basis of Construction Project Archives Management", it is divided into:

    1. Comprehensive documents, including commencement, resumption of work, completion report, completion acceptance record, mandatory provisions, acceptance form, design change notice, drawing review, construction organization design, etc.

    2. Quality assurance information, including factory certificate, inspection report, retest report, etc.

    3. Divisional engineering records, including technical disclosure, construction records, acceptance records, sub-project records, and inspection batch records.

    4. As-built drawings.

    5. Engineering **, audio and video files.

    In practice, it is generally divided into:

    1. Quality plan information, including start-up, resumption of work, completion report, mandatory provisions, acceptance form, design change notice, drawing review, construction organization design, etc.

    2. Construction quality management data, construction concealment, inspection records, and technical disclosure.

    3. Engineering quality assurance data, material factory certification documents and retest test reports.

    4. Project quality acceptance data, itemization, inspection batch quality acceptance records.

  6. Anonymous users2024-02-01

    The urban home decoration enterprise platform will answer for you: generally divided into: x0d x0aa book:

    Project quality acceptance data; (Itemization, inspection batch quality acceptance record) x0d x0a hope to help you.

  7. Anonymous users2024-01-31

    I am a data clerk who does fine decoration and decoration projects, what information should I do before the completion of the record?

    Project completion acceptance record form; Project completion acceptance report. The completion acceptance report shall include the date of the project application, the construction permit number, the review opinions of the construction vertical drawing design documents, and the quality of the survey, design, construction, engineering supervision and other units signed by the quality of the project. Approval documents or permission documents issued by planning, environmental protection and other departments as stipulated by laws and administrative regulations; The law stipulates that the public security and fire department shall issue a certificate of acceptance of large-scale crowded places and other special construction projects; Project quality warranty signed by the construction unit; Other documents that must be provided by laws and regulations.

Related questions
11 answers2024-02-20

1. Introduction to the project.

2. Project cost. >>>More

7 answers2024-02-20

Collect, archive and sort out various materials such as pre-licenses and contracts for each development project. Collect, archive and sort out all kinds of information such as drawings, supporting facilities, budget and final accounts of various development projects. Arrange the sending and receiving of drawings and materials for construction projects. >>>More

11 answers2024-02-20

In principle, it is a must.

It is estimated that the new project will not be able to run, and it will need to be completed and filed together with the civil engineering. >>>More

4 answers2024-02-20

1. After the completion of the unit (sub-unit) project, the contractor shall organize the relevant personnel to self-inspect according to the quality standards and design drawings, and evaluate the test results, and fill in the "Project Completion Inspection Form" after meeting the requirements and attach the project acceptance report and complete quality data to the project supervision agency to apply for completion pre-acceptance. >>>More

8 answers2024-02-20

All the branch acceptance is qualified and the testing data is complete.