-
Kilogram. 450 50 = 9 layers.
Rice. Rice. Layer. 1800 12 = 150 cases.
150* meters.
The first type: 150 stack length, 12 stack width, 2 stack height
The second type: the length of the stack is 90, the width of the stack is 20, and the height of the stack is 2
-
Solution: 4 meters high, the number and weight that can be placed within 1 square meter:
4 layers, 16*4=64 boxes; 64*50kg=3200kg=>3t (load), so only 15 layers can be placed;
Calculate the height of 15 floors:
15*m; Calculate the length and width of 15 layers:
3000 60 = 50, because it is a platform stack, so 50 = 10 * 5, length = 10 meters, width = 5 meters;
To sum up, the length is 10 meters, the width is 5 meters, and the height is meters, which can meet the platform stacking, height limit and load at the same time. The above is for reference!
-
The analysis is as follows:
1) According to what you say.
If the actual volume is less than 50 cubic meters, then the charging ton will be calculated by weight;
2) There is also a question, that is, whether the weight of 50 tons includes the weight of the drum, if it does, this weight must also be added, and the weight must be calculated according to the gross weight;
3) Now assuming that the gross weight is 50 tons, and the basic freight rate is USD 100 freight tons, then the total basic freight is 5000 US dollars. 4) Fuel surcharge (BAF) is increased by 10% according to the basic freight; The Currency Depreciation Surcharge (CAF) is 10% for the base shipping fee, which is $500, and the additional shipping fee is $1,000, for a total shipping fee of $6,000.
-
w= m= w >m1, billing.
Tons is weight tons = 50 tons.
2. Basic freight = USD 100 * 50 tons = 5000 US dollars 3. Additional freight = 5000 US dollars * (10% + 10%) = 1000 US dollars Total freight = 5000 + 1000 = 6000 US dollars.
-
Class B, the whole box integer multiple can save the express cost for customers.
Class C is the most costly for the customer.
I'll recalculate.
Calculated: Class A, total cost = 108
Category B, Total Cost = (Cheapest).
Category C, total cost = 220
-
a---598
Fooling, it should be the most encouraging customer of c, please don't laugh if you're wrong.
-
Election C 1.1 million yuan The question omitted the word "10,000".
If the logistics cost is reduced by 100,000 yuan, you can get a profit of 100,000 yuan. This $100,000 gain is direct.
When the sales volume of the enterprise is 10 million yuan, the logistics cost accounts for about 10% of the sales, that is, 1 million yuan. As the title suggests, the logistics cost is reduced by 100,000 yuan, and to generate a logistics cost of 100,000 yuan, it is necessary to complete the sales of 1 million yuan to achieve. Therefore, the reduction of logistics costs of 100,000 yuan is equivalent to the completion of additional sales of 1 million yuan.
This $1 million is an indirect gain.
100 + 10 = 110 (10,000 yuan).
-
1) Yes, the contract stipulates that the shipment period is from December of the current year to January of the following year. The loading date is February 11, but we have changed the loading date to January 31, and the loading date has exceeded the time limit specified in the contract, so the bill of lading is signed roughly.
2) Backsigning the bill of lading is an act of forging documents, which is a fraudulent act of collusion between the shipper and the shipping company to deceive the consignee, and the corresponding legal responsibility needs to be paid.
3) Under normal circumstances, it is not allowed, in order to catch up with the delivery date, in the case of shipping delays, we will negotiate with the shipping company to sign the bill of lading.
4) You can check the logbook, confirm to the shipping company, and check whether the issuance date of the bill of lading is the time of sailing of the ship.
-
1. A: Delivery period = 1 + 1021 260 + 3 (more than 1000km) + 2 (more than 2 tons) = 11 days.
Start, end.
2. Answer: delivery period = 1 + 1 (less than 250km) + 0 = 2 days But the minimum number of days for cargo transportation in the railway.
The capacity is three days, so the delivery period for this question should be three days.
3. Answer: delivery period = 1 + 19 + 2 + 1 = 23 days.
-
(1) What is the economic order quantity? eoq=200 (pieces) (2) How many times should I order in a year? 50 (3) What is the stock reserve at the order point? 200 No.
-
The first logistics professional calculation question: 8400 6=1400,1400*. 168 square meters of warehouse space is required. The storage quota per unit area is 108kg m2 (. 168/650=。
-
Let the optimal order quantity be x, then the total cost c=8000*100+3*x 2+8000*30 x, CMIN=801200, x=600, the number of annual orders = 8000 600=times, and the interval between each order t=360 days.
Original = [(-6 -4)-(15 -8)] [-2-(-7 -16)]
3 2-15 8] [-2 -7 16] Simplification. >>>More
The resistance of V 60W is 110 * 110 40 according to the principle of voltage division 110V 60W should be divided into 88V voltage, 110V 40W should be divided into 132V, 2, the current in the circuit is: 220 (110 * 110 60 + 110 * 110 40 ) =, power consumption: 88 * of 110V 60W, 132 * of 110V 40W >>>More
I seem to know it, it doesn't seem to know me.
3co2...This conservation of atoms can be seen by looking at it. >>>More
Supplementary conditions: dilute hydrochloric acid is 73g dropwise to be suitable for the reaction completely) Because dilute hydrochloric acid contains 10% HCl, there is HCLN(HCl)=m(HCl) m(HCl)=Na2CO3 + 2HCl=2NaCl + H2O +CO2 x Y Z >>>More