How to choose equipment to open a 100 square meter children s park

Updated on Financial 2024-02-25
17 answers
  1. Anonymous users2024-02-06

    There are many choices of amusement facilities in amusement parks, and the most important thing is to make accurate choices according to investment budget, market demand, and amusement park positioning. There are also a few things to pay attention to when buying rides:

    First, only high-quality amusement facilities can give customers a sense of security, amusement facilities as a place for children to play and play, safety is the first place, only solid product quality, in order to have a rock-solid safety guarantee. When choosing amusement facilities, you should not be greedy for temporary convenience and choose defective products.

    Second, consider whether the type positioning of the product is in line with their own needs, the age positioning of children of each type of amusement equipment is more or less different, and should be targeted to purchase, consistent with their main customer sources.

    3. Good after-sales service is not only the corporate image of amusement equipment manufacturers, but also an indirect reflection of product quality. After-sales improvement will save a lot of trouble encountered in the later stage of installation, so you should choose carefully.

    The 100-square-meter children's playground can generally choose to open a children's naughty castle.

  2. Anonymous users2024-02-05

    Amusement equipment is the core of the profit of an indoor children's park, and it is also the largest piece of investment. There are many types of amusement equipment on the market, with different functions and different functions. The 100-square-meter children's playground is recommended to focus on children's naughty castles.

    It has a wealth of projects and strong playability, which is most suitable as an investment project for small children's playgrounds. And Naughty Castle** is generally calculated according to the number of equipment matching. Investors can combine and match amusement equipment according to the analysis of local market conditions.

  3. Anonymous users2024-02-04

    This depends on the specifications of the site and the planning and design of the manufacturer.

  4. Anonymous users2024-02-03

    To open a small and medium-sized children's park, the amusement equipment is as follows:

    Interactive projection smashing balls and slides: Interactive projection smashing balls and slides make Nianchen bend people pleasing to the eye, and suddenly make the venue science and technology feel real, attract people's attention, attract super fire, and is one of the rare hot projects.

    Million Wave Ball Pool: Million Ball Pool is a national, parent-child, interactive entertainment project.

    Children's Naughty Castle: Needle boy bored for children like to drill, climb, slide, roll, shake, swing, jump, shake and other nature, according to the scientific brother oak three-dimensional collocation formed a set of playground equipment, sports, puzzle, fitness and other functions as one of the children's activity center.

  5. Anonymous users2024-02-02

    The following documents are required to apply for an indoor children's park.

    1. Industrial and commercial business license.

    2. National tax and local tax.

    3. Fire fighting. There is a detailed description in the **** blog of Guangzhou City's favorite children's amusement equipment.

  6. Anonymous users2024-02-01

    Safety equipment is a must, while regular entertainment, it is better to visit more than others, and add new content on these foundations. Our children's playground generally has slides, swings, caves, bridges, ball pools, trampolines, sand and so on.

  7. Anonymous users2024-01-31

    Based on the questioner's existing question......

    3rd floor standard answer.

  8. Anonymous users2024-01-30

    The first is safety measures: fire prevention and injury prevention.

  9. Anonymous users2024-01-29

    1. Venue rental.

    The rent of the site is generally 30-40 yuan per month, and the monthly rent of a 100-square-meter site is about 3000-4000 yuan. Of course, the rent is different for different economic location conditions, which is related to the location of the site. For example, in a large number of places, there are more potential customers, and the rent will naturally be higher, such as large shopping malls, supermarkets, kindergartens, etc.

    2. Equipment investment.

    According to conventional estimates, if the site is 100 square meters, it is about 60,000 to 100,000 yuan, and some companies charge by square meters (such as Naughty Castle per square meter, simulated driving school, Zhiyong Daguan) and some are charged by equipment. The investment standard is divided into three levels: high, medium and popular, and the specific investment amount is based on the actual situation of the different equipment products and sites you choose and the different economic levels of the region, and the investment funds will be different. Therefore, if you want to invest in opening an indoor children's park, you must go to the children's amusement equipment manufacturer in person to see the quality of the product and negotiate with all aspects.

    3. Site decoration.

    The site decoration cost is generally 300 square meters, and the site decoration cost of 100 square meters is about 30,000 yuan. The cost of the venue is generally determined by the decoration materials and decoration style, and the decoration materials should be selected to be healthy, environmentally friendly and non-flammable products, after all, the safety of children is the most important. Candy style, ocean style, and forest style are the indoor children's park decoration styles that children prefer.

    Fourth, operating expenses.

    The monthly salary of indoor children's park employees is about 2,500 yuan, and it is best to choose people who have experience in preschool education or graduated from preschool education, which is more professional and attentive, so as to facilitate the later operation and management of indoor children's parks. Of course, there will be other expenses, such as utility bills, taxes and other miscellaneous expenses, which are about 10,000 yuan a year.

    5. Publicity costs.

    Only publicity activities can improve the popularity of indoor children's parks, and it is also the most effective means for the popularity of the park, so a certain amount of publicity funds must be prepared, as for what kind of publicity means you choose according to the publicity effect and the budget of the funds to decide.

  10. Anonymous users2024-01-28

    The investment in a 100-square-meter children's amusement park ranges from 10 to 200,000 yuan, and there are differences.

    First, first of all, it is necessary to determine the venue, and the funds of the venue are also the investment costs of children's amusement parks, which are different from city to city.

    Second, then you need to decorate according to the site, calculate the decoration cost, and the decoration should also depend on the grade of the decoration to decide.

    3. Finally, it is necessary to design the drawings according to the site structure and place the equipment according to the drawings, which is about 700 square meters.

    Note: There are also some staff salaries, publicity budgets, activity budgets, etc., which can be budgeted for a part of the funds.

  11. Anonymous users2024-01-27

    How much does it cost to open a 100 square meter children's park? Take a 100-square-meter children's park as an example: there are various kinds of amusement equipment in the children's amusement park, and different equipment is different, and the equipment cost is the most important cost of investing in an amusement park.

    Naughty Castle is generally popular amusement equipment for children, 100 square meters of indoor children's amusement park is recommended to be based on Naughty Castle, the local consumption level directly determines how much the rent of the children's amusement park, and the consumption level mainly depends on whether it is a first-tier city or a second-tier city, a city or a village or town. Taking a third- or fourth-tier county as an example, the rental cost of a 100-square-meter site is about 2,000 to 3,000 yuan. Of course, the economic situation of each region is different, so it is necessary to calculate according to your local consumption level.

    The initial cost of designing a 100-square-meter indoor children's amusement park is about 60,000-80,000 yuan, including planning, design, packaging, installation, etc.

  12. Anonymous users2024-01-26

    The mid-range is 670,000 yuan, and the playability is still okay.

  13. Anonymous users2024-01-25

    Criteria for the location of children's amusement parks.

  14. Anonymous users2024-01-24

    With the rapid development of the children's entertainment industry, more and more entrepreneurs are finding huge business opportunities in the children's entertainment market. So, many interested investors ask, how much does it cost to open a 100-square-meter children's park? Next, let's take a 100-square-meter children's park as an example to calculate how much it costs to open a 100-square-meter children's park.

    1. Venue fees.

    The first thing to talk about is definitely the cost of renting a venue, which is the largest part of the investment. The economic level of the city, the advantages and disadvantages of the geographical location, the level of consumption, the size of the site area, etc., are important factors that affect the cost of the site. Generally, children's playgrounds are located in shopping malls, supermarkets, communities, kindergartens, schools and other areas with high passenger flow.

    The rent of 100 square meters of space is about 70-120 yuan in the commercial center of the first- and second-tier cities, and 30-70 yuan square meters in the commercial center of the third- and fourth-tier cities.

    Second, the cost of equipment.

    Equipment is the profit core of a children's park, different equipment configuration will bring different effects, different amusement equipment ** is also different, playground equipment ** has two ways to calculate by square and according to the set. For example, the amusement equipment according to the square ** includes cool running trampoline, naughty castle, beach treasure hunt, etc.; The amusement equipment that comes by the set includes tank battles, jungle sniping, magic bubble parks, etc.

    3. Decoration costs.

    Children's paradise is a place for children to play, so the decoration should be in line with children's love, can be decorated into different themes, can be candy style, ocean style, jungle style, ice and snow style and so on. The decoration cost is about 300 square meters, and the decoration cost of 100 square meters of children's paradise is about 30,000 yuan.

    Fourth, staff costs.

    A 100-square-meter children's park needs about 1-2 clerks, and the cost of each employee is roughly 2,500 yuan per month. It is recommended to recruit teachers with experience in early childhood education, so that they can guide children to play correctly.

    5. Other expenses.

    Utilities, office supplies, etc., are about 10,000 yuan per year.

    It can be seen that the total cost of opening a small children's park of 100 square meters is roughly about 10-150,000 yuan.

  15. Anonymous users2024-01-23

    First, the upfront cost.

    1. Site rent.

    The area of children's playgrounds can be large or small, and investors generally choose the area of children's playgrounds according to their capital budget. If you open a 100-square-meter children's playground in the county, the rent of the venue generally ranges from 3000-4000, of course, the economic situation of each region is different, so you should calculate it according to your local consumption level.

    2. Amusement equipment fees.

    After the site is determined, it is necessary to look at the equipment configured in the children's playground plan, the more functions designed in the plan, the more accessories, the higher the **, so this is also an important factor involving **. Amusement equipment is divided into two different pricing methods: per-set pricing and per-square pricing, such as naughty castle equipment** is charged per square.

    3. Decoration costs.

    The decoration grade is high and low, the cost of ordinary decoration is 300 square meters, and the children's playground of 100 square meters is about 30,000 yuan in the early stage.

    4. Other expenses.

    The cost of handling the business license and related business procedures is enough within 1,000 yuan. Pre-opening advertising investment, tickets, membership cards and other expenses. If the advertising investment is large, the cost will definitely be high, but it is not much.

    Second, the cost of the later stage.

    1. Usual equipment maintenance costs.

    If you join the brand, the brand will provide a certain period of free maintenance fees, and if you exceed the store operation period, you will be charged some wearing parts and some store operation costs, which should be understandable for investors. It usually doesn't cost much.

    2. The increase in the cost of new equipment in the later stage.

    With the improvement of business goodness, it is necessary to constantly update new equipment, and if there is no freshness, the passenger flow will become less and less. If you're not running out on money, try changing the placement of your music equipment to create a new combination of equipment.

    3. Employee expenses.

    Recruit the right park staff, and it is recommended to recruit teachers with experience in early childhood education, so that it is enough to guide children to play correctly. The cost of each employee is about 2,000 yuan per month, depending on the size of your children's playground, how many employees are hired, and a 100-square-meter children's playground needs about 1-2 employees.

    4. Other expenses.

    If the scale is small, you can clean it yourself, and find someone to clean it once a week or regularly. It also includes water, electricity, and fire costs. If the funds are sufficient, cameras can be installed in the field, which is not only convenient for management, but also can effectively prevent theft.

  16. Anonymous users2024-01-22

    1. The rent of the site is about 60 yuan per square meter, and the rent is about 12,000 yuan per month.

    2. The equipment purchase is about 300 yuan per square meter, and the equipment amount is 60,000 yuan.

    3. The salary of personnel is 2,000 yuan per person and 4,000 yuan for two people.

    4. Utilities for water and electricity are 1,500 yuan per month.

    5. Decoration 15,000 yuan.

    This customer, has already received the answer I provided for you, huh? Please ask me to provide you with the answer and service are you satisfied, if you have any follow-up questions can send me a private message, I will continue to provide you with high-quality follow-up services. If you think my service attitude is not bad, please take the trouble to like it, thank you, I wish you a happy family, a happy life, all the best, thank you again.

    Ask how much money should be raised to open a children's club like this.

    You can refer to it.

    It is necessary to raise about 200,000 yuan.

    Thank you for your answer.

  17. Anonymous users2024-01-21

    1. Without considering the franchise fee, the cost of opening a children's park is mainly determined by the venue rent, venue decoration cost, amusement equipment cost and other expenses. The rent of the site is mainly determined according to the geographical and economic location of the site, and the rent is higher than the general location if the location conditions are good, the first volume is large, and there are many potential customers. Generally, the rent in second- and third-tier cities is 30-40 yuan per square meter per month, and the rent of a 100-square-meter site is about 3,000-4,000 yuan.

    Second, the cost of venue decoration is mainly determined by the decoration materials and the degree of decoration, specific decoration guidelines children's park design and decoration should pay attention to what problems? Generally, in second- and third-tier cities, the venue decoration fee is 300 yuan per square meter, and the site decoration fee for 100 square meters is about 30,000 yuan. The cost of amusement equipment mainly depends on the type of amusement equipment purchased and **, 100 square meters of the site is recommended to open an 80 square meters of naughty castle children's park, the remaining 20 square meters as a passage and rest area.

    Naughty Castle is calculated according to the area and project richness, generally in 600-800 square meters, so the cost of amusement equipment is 5-70,000 yuan.

    3. Employee salary, water and electricity bills, taxes, etc., the monthly salary of employees is generally 2,500 yuan.

Related questions
2 answers2024-02-25

If you want to start a business, it is recommended that you choose a suitable entrepreneurial project, see if you have the qualifications of the relevant project, and work hard after finding the right project. Of course, capital is also a problem to consider in the process of starting a business, and if you have limited start-up capital, you can solve it through small loans. >>>More

13 answers2024-02-25

The last time I opened it, it cost 13 bucks.

15 answers2024-02-25

To open a rice shop, you first need to apply for the following documents, 1A copy of the store's real estate certificate must be prepared (the rental agreement is also required for the rented house). >>>More

10 answers2024-02-25

It is very important to choose a well-known brand, and also consider the brand support, technical level, operation model, etc. I suggest you join Aurako, who has more than 70 franchise stores around the world, and the franchise system is very complete. I'm very glad you can have me, if you have any questions, you can continue to ask, thank you.

13 answers2024-02-25

A few days ago, I went to the community and found that my neighbor's house was being renovated, and I wanted to go in and have a look, and found that my neighbor's house was all tiled. I thought that my neighbor had really spent a lot of money to renovate the house, but after talking to the neighbor, I realized that it was a project given by the decoration company. >>>More