How to compile the management method of pipeline completion data?

Updated on society 2024-02-22
9 answers
  1. Anonymous users2024-02-06

    Hey, I want to know this, too...

  2. Anonymous users2024-02-05

    Hello, you didn't make it clear what your role is, the construction unit, the supervision unit and the construction unit's data personnel all need to do the completion data. If you are the construction unit, then the project must not have been completed, because before the completion of the acceptance of the construction unit should ask the archives management agency to pre-accept the construction data, the construction data is prepared by the construction unit, the preparation and preservation is regulated, the construction data mainly include: construction management data, construction technical documents, material data, measurement and monitoring data, construction records, acceptance data, quality assessment data, etc., construction data should be collected and sorted out in a timely manner with the construction progress, Therefore, you have to sort out the information obtained during the construction process to see if there is any, whether the content is complete, whether the signature and seal are done, and the information generally needs to be made in duplicate, because some should be submitted to the enterprise for safekeeping, and some should be handed over to the construction unit, and the construction unit will be handed over to the as-built drawings, construction drawings review records, design changes, quality certificates of materials and components, concealed engineering inspection and acceptance records, test pieces and test block test inspection records, etc.

  3. Anonymous users2024-02-04

    You'll be given it if you want it? Impolite.

  4. Anonymous users2024-02-03

    The outdoor part of the pipeline needs to be done: if it is directly buried, it needs to be recorded outside the trench and groove inspection, pipeline welding (flaw detection or photography) report and one-line diagram, welding record, suppression record, concealment record, material entry acceptance record, and the corresponding inspection batch.

    If it is overhead, remove the trench and concealment.

    The indoor part of the pipeline needs to be done: the part out of the house needs to be suppressed and concealed, and the indoor part needs to be suppressed (according to the system and building number), if the pipeline is in the shaft, it is necessary to make a concealed acceptance record, as well as the corresponding inspection batch, as well as the record and single-line diagram of flaw detection or photography, wherein: the archive needs to be suppressed and concealed.

    What Party A needs is material entry + suppression, concealment + process data (inspection batch and summary) if you don't understand and ask, you don't understand what you said.

  5. Anonymous users2024-02-02

    It is an open pipe, a dark pipe, a buried pipe, a ground pipe ditch, an indoor pipe, an outdoor pipe, and the quality, quantity, specification, and grade of the materials used in each part meet the requirements of the drawings. Whether the withstand voltage test has been done, whether there has been a problem during the withstand voltage test, and how to deal with it

  6. Anonymous users2024-02-01

    If you want to choose a good material, the plasticity of the tube should be very important.

  7. Anonymous users2024-01-31

    Tell us about the materials you have now and the scale of what you're going to do.

  8. Anonymous users2024-01-30

    You can go to Zhulong.com to check it out.

  9. Anonymous users2024-01-29

    Big Brother learned no. Newbie report. Ask for some experience, if you can, leave QQ

Related questions
10 answers2024-02-22

The preparation unit of the completion settlement is the construction unit. It is the last to ask the construction unit for money to settle the bill. >>>More

7 answers2024-02-22

There are in the building construction quality specifications.

11 answers2024-02-22

In principle, it is a must.

It is estimated that the new project will not be able to run, and it will need to be completed and filed together with the civil engineering. >>>More

9 answers2024-02-22

1. It would be much better if you had a general ledger. The number reflected in the balance sheet is the number of time points, and the number reflected in the income statement is the number of periods. >>>More

20 answers2024-02-22

When the company wants to give you a promotion, there will definitely be an interview, and the salary will be discussed with you casually for the new position and the requirements for you.