How to make an architectural model? How to make an architectural model?

Updated on technology 2024-02-19
4 answers
  1. Anonymous users2024-02-06

    If you want to learn systematically, you can consider signing up for a live online class, and recommend CGWANG's online class. The teacher speaks carefully, you can watch it back after the class, and there are also the same type of recorded classes that you can learn for free (give away lifelong VIP).

    Among the training institutions in the field of "3D modeling", [Wang's Education] is the leader in China, and it does not join the branches, but is a chain campus directly operated by the headquarters. Different from many other large institutions of the same type: each campus of Wang's Education is physically face-to-face, the teachers are hand-in-hand, and there are special class teachers from morning to night, and the liver-bursting learning mode will improve quickly, especially suitable for students with poor foundation.

  2. Anonymous users2024-02-05

    The architectural model not only needs to represent the building's near-real proportions, shapes, colors, textures and planned environment, but also reveals the internal space, interior furnishings and structure, and structure of the key building rooms. Display models are generally made of materials such as wood, plywood, plastic sheets, plexiglass, and metal sheets.

    1.Pre-production planning.

    According to the floor plan, elevation, renderings and model requirements provided by Party A, the model production style is formulated.

    2.Model ** budget.

    The budgeter determines the model fee and signs the production service order according to the architectural style, the scale of the model, the material process and the depth of the drawings.

    3.Triage of production organizations.

    The technician will check the analysis drawings to determine the model material, processing process, production period and effect requirements.

    4.Manufacture of as-built inspections.

    The manager of the quality inspection department and the person in charge of the project shall carry out detailed inspection and adjustment in accordance with the drawings of our company.

    5.Party A's acceptance and fine-tuning.

    The business manager and technical director will assist Party A in making the final acceptance and fine-tuning.

    6.The model was taken at the factory acceptance.

    Professional photographers assist Party A in keeping data and making final factory acceptance.

    7.Model shipping consignment service.

    The company provides professional transportation, assistance in train and plane consignment and technical support.

    8.Model installation and debugging.

    The company's after-sales service personnel debugged, installed and cleaned the model display site on site, and left after reaching Party A's satisfaction.

    In short, the architectural model production is divided into two steps, the first step is the preliminary design, that is, the architectural model in the schematic design stage is called the working model, and the production can be simplified for processing and dismantling. After the preliminary design is completed, the second step of design can be carried out to make a more refined model - the display model for the approval of the design plan. The display model is not only required to show the building's close to real proportions, shapes, colors, textures and planned environment, but also to reveal the internal space, interior furnishings and structure, and structure of the key building rooms.

    In short, the production of architectural models aims to express the idea and conception of design creation.

    In addition, it should be noted that in the production of architectural models, it is necessary to pay attention to the principle of primary and secondary layering of lighting, that is, the allocation of lighting should be carried out according to the characteristics of the scene. In addition, it is necessary to follow the principle of elegant foiling of the handicap.

  3. Anonymous users2024-02-04

    An Jinye Architectural Model Innovation Factory will answer for you.

    First of all, let me introduce the tools:

    Boundary knife, round cutter, 45 degree cutting knife, U glue, cutting board, scissors, ruler, latex, double-sided tape.

    Next, let's talk about the basic materials:

    All kinds of cardboard, ABS board (various specifications), KT board.

    Model airplanes, plastic sticks, transparencies, frosted films, people, grass clippings, colored paper.

    tree, clay, acrylic paint.

    The process of making an architectural model:

    1. Draw a drawing to decompose the façade of the building and the window line protrusion.

    2. Engraving, use the engraving machine to carve out the decomposed façade and protruding window.

    3. Splicing, splicing the carved façade together, it becomes the main frame of an architectural model.

    4. Grinding. 5. Spray paint and color, spray paint and color after the main body of the architectural model is framed.

    6. After the coloring is completed, the bay window balcony is spliced and glued on. Then add glass to the inside. In this way, the whole model is made.

    Let me introduce the model making scenery.

    1. Building wall: Sweden.

    Imported ABS polymer engineering plastics, computer engraving, and cutting effects.

    2. Glass curtain wall.

    Austrian "Delicate" coated reflective glass. (There are many colors).

    3. Granite.

    Marble: imitation stone ABS board made in Japan (a variety of styles).

    4. Glass: Hong Kong semi-reflective translucent colored glass (many colors).

    5. Lawn: Turf machine with lawn paper made in Germany or lawn velvet made in Japan is implanted into the model chassis (waterproof without seams).

    6. Scenery characters: preiser characters made in Germany (each proportion).

    7. Scenery car: Hong Kong-made cars (various proportions).

    8. Greening: all kinds of trees.

    shrubs, dried flowers, etc.

    9. Adhesive: A glue made in Taiwan, U glue made in Germany, chloroform made in China.

    10. Railings and floor tiles: computer engraving color separation (various patterns).

    11. Color: The color of the spray paint is according to Party A's requirements.

    I hope it will be helpful to the landlord, and if you have any questions, please consult Xi'an Jinye Architectural Model Innovation Factory, which has **. Thank you!

  4. Anonymous users2024-02-03

    It is recommended to buy some related books to read.

Related questions
10 answers2024-02-19

The domestic trumpeter is good, ** is relatively cheap, 1:700 seems to be less than 200 yuan. 1: >>>More

3 answers2024-02-19

You can make enzymes from strawberry cubes, sugar, and fermentation vats. Strawberry cubes, sugar and water are mixed into a fermentation vat, fermented for 3 days, the enzyme solution is poured into a glass jar and placed in the refrigerator. Here are the steps: >>>More

4 answers2024-02-19

First of all, it is definitely necessary to leave the border of heaven and earth, it looks better, simply and generously write the theme of the hand-copied newspaper (do not write it below, do not write the oblique title from the bottom to the top, horizontal, vertical, oblique), it is best to be novel and vivid, unless the teacher says to write what is the topic, and then analyze the specific situation in the sub-section, to set off with the theme background, and the specific content is decided according to what kind of hand-copied newspaper to do.

9 answers2024-02-19

The grapes are fermented in alcohol.

13 answers2024-02-19

After the pork skin is cooked, cut into cubes, and then add the soup when the pork skin is added, in winter, if the outside temperature is not very high, you can directly cover it with a piece of gauze and put it outside; If it is unhygienic, you can put it in a container and put it in the refrigerator, in principle, it should be placed in the freezer, about a day, and when you want to eat, take it out and cut it directly, and put some seasoning to adjust it.