-
First of all, what is the prefabricated type:
1. The prefabricated building is a building assembled by prefabricated parts and components on the construction site, which is called a prefabricated building. According to the form and construction method of prefabricated components, it can be divided into five types: block building, plate building, box building, skeleton plate building and slab building.
2. The walls, columns, beams, floors, roofs, etc. that make up the building are prefabricated in the factory and shipped to the site where the building needs to be built.
Advantages of prefabricated buildings.
1. Components: The components can be standardized and mass-produced, almost not affected by weather conditions, and are more reliable in terms of quality;
2. Energy saving and environmental protection: reduce the waste of materials in the construction process, and also greatly reduce the construction waste on the construction site;
3. Shorten the construction period: after the components are produced, the on-site assembly is pulled down, which reduces part of the process and greatly accelerates the construction progress;
4. Labor saving: The components are produced in the factory, which reduces the manpower demand and reduces the labor intensity of the construction personnel;
5. Save the template: because the laminated board is used as the floor bottom film, and the external board is used as the template on one side of the shear wall, a large number of templates are saved.
Disadvantages of prefabricated buildings.
1. The cost is higher: the engineering cost of prefabricated buildings is much higher than that of traditional construction projects;
2. Increased freight: If the component production plant is too far away from the construction site, the transportation cost will increase;
3. Size limitations: due to the limitations of production equipment, components with larger sizes have certain difficulties in production;
4. Small application field: Although the country is vigorously promoting, the current prefabricated building is very limited in the total height and floor height of the building;
5. Poor seismic resistance: the integrity and stiffness of prefabricated buildings are weaker, and the seismic impact resistance is poor.
For the owner, the prefabricated swimming pool has the advantages of fast construction and high cost, and at the same time will have the disadvantage of high cost.
-
The advantage of seeing an equipped swimming pool in the community is that it can bring convenience to the majority of residents and have a place to play.
-
Abstract: Summer is coming, and people like to go to the pool to play in the water and take a shower. Therefore, repairing swimming pools has become a hot business, so do you know what equipment should be included in a perfect swimming pool?
This includes swimming pool circulating water treatment equipment, swimming pool disinfection equipment, constant temperature swimming pool equipment, swimming pool cleaning equipment, swimming pool lighting equipment, swimming pool shore facilities, water quality testing equipment, etc. Let's take a look at the details. What supporting facilities are needed to build a swimming pool.
1. Swimming pool circulating water treatment equipment.
Swimming pool circulating water treatment equipment is one of the basic configurations of a swimming pool, which can be divided into traditional machine room sand tank pump equipment and machine room-less integrated swimming pool equipment.
The traditional machine room sand tank pump equipment is suitable for relatively large swimming pools, such as standard pools, water parks, etc., which require a large number of pipelines, need to build a machine room, and the construction process and time consumption will be very long.
The integrated swimming pool equipment without machine room is more suitable for small and medium-sized swimming pools, such as club swimming pools, hotel swimming pools, real estate garden swimming pools, private villa swimming pools, etc., it does not require machine rooms, pipelines, simple installation, easy operation, filtration accuracy up to 5-15 m, and the management cost is very low, which is now the choice of many swimming pool circulating water treatment.
2. Swimming pool disinfection equipment.
Swimming pool disinfection equipment is also one of the basic configuration of a swimming pool, and swimming pool water treatment is a very important link, which directly affects whether the water quality of the swimming pool is up to standard.
Swimming pool disinfection equipment can be divided into dosing metering pumps, dosing devices, ozone generators, salt and chlorine machines, and copper and silver ion sterilizers.
3. Swimming pool cleaning equipment.
Pool cleaning equipment is also one of the basic configurations of swimming pools. In addition to the basic circulating water treatment equipment and disinfection equipment, a swimming pool also needs to be regularly maintained and cleaned, which is also a way to ensure the water quality of the pool.
Swimming pool cleaning equipment can be divided into 3 types: one is a seven-piece set of cleaning tools (pool brush bridge slide hall, leaf net, telescopic rod, suction pool head, wire brush, etc.); One is a shore-based manual swimming pool suction machine; One is a fully automatic swimming pool suction machine (killer whale pool suction machine, Akport swimming pool suction machine, etc.).
4. Swimming pool lighting equipment.
Underwater lights beautify swimming pools, including pool wall lights, waterproof cables, etc.
5. Constant temperature swimming pool equipment.
Thermostatic swimming pool equipment is to ensure the temperature of the water in the swimming pool. Now more and more swimming pools choose to keep the temperature of the swimming pool, because in this way you can swim in the pool all year round, otherwise when the winter comes, the swimming pool will stop running for a long time, so the constant temperature swimming pool equipment is a good solution to the problem that the pool can swim all year round.
Constant temperature swimming pool equipment can be divided into boiler heating, plate heat exchanger heating, heat pump heating, etc. Generally, there are more heat pumps used for constant temperature heating, and it will be more suitable for boiler heating in cold places such as the north, but there are also special low-temperature heat pump units, but the cost will be very high.
6. Swimming pool shore facilities.
Such as rubber ladders, starting platforms, lifebuoys, lifechairs, beach chairs, coffee tables, sun umbrellas, etc.
7. Water quality testing equipment.
Such as water quality monitors, water test boxes, and water thermometers.
8. Water treatment pipeline fittings.
-
Summary. Kiss, expand knowledge.
1.Standard Swimming Pool Size The size of a general swimming pool is 21 meters * 50 meters, and the water depth is meters. For competitions, you need to have a separate auditorium, and for exercise, you can do without a spectator seat.
2.Standard Gymnastics Pool Size The dimensions are, water depth, with gymnastic high platform and springboard. There are two types: with and without seats. However, the pool specifications and electronic equipment requirements must meet the standards of the event.
3.The size of the international standard swimming pool is generally 50 meters long, the error is +, the time regulator of the electric shock plate needs to be installed at the end of the pool, the specification of the electric shock plate is m * m * m, and the bottom of the immersion water is placed at 30kg on the water surface of the pool wall on both sides
Is there a swimming pool?
Dear, some communities have swimming pools and some don't have yo <>
<> kiss, there are usually two kinds of community swimming pools, one is an open-air landscape swimming pool, and the other is an indoor heated swimming pool. <>
<> dear, the pool is a good item, but it's not cheap to maintain. The toll bridge reform of the community swimming pool for the owners is relatively low, and the income cannot support its maintenance.
Kiss, knowledge expansion 1Standard Swimming Pool Size The size of a general swimming pool is 21 meters * 50 meters, and the water depth is meters. For the first guess contest, a separate auditorium is required, and for exercise, there is no spectator seat.
2.The size of the gymnastic swimming pool is the size of the water depth, with a gymnastic platform and a springboard. There are two types: with and without seats.
However, the pool specifications and electronic equipment requirements must meet the standards of the event. 3.The size of the international standard swimming pool is generally 50 meters long, and the error is Qingqin Li +, and the electric shock plate timer needs to be installed at the end of the pool, and the electric shock plate specification is m * m * m, and the bottom of the soaked water is placed at 30kg on the water surface of the pool wall on both sides of the pool wall
Kiss, I hope mine is helpful to you<>
-
Summary. I once installed a prefabricated swimming pool at home, which can be said to be a very interesting experience. The impact of problem-specific unassembled swimming pools on the site is limited because they are detachable and can be easily moved without causing much damage to the site.
In addition, the installation process of the prefabricated swimming pool is also very simple, does not require too much earthwork, and will not have much impact on the site. In addition, the installation process of the prefabricated swimming pool is also environmentally friendly, which will not produce too much garbage and will not pollute the environment.
I once installed a prefabricated swimming pool at home, but it was a fun experience to go back to the mountains. The impact of problem-specific unassembled swimming pools on the site is limited because they are detachable and can be easily moved without causing too much damage to the site grinding. In addition, the installation process of the leaky prefabricated swimming pool is also very simple, does not require too much earthwork, and will not have much impact on the site.
In addition, the installation process of the prefabricated swimming pool is also environmentally friendly, which will not produce too much garbage and will not pollute the environment.
Excuse me, but please go into more detail?
In response to your questions, we can provide the following solutions:1First of all, you can consider using a prefabricated swimming pool, which can reduce the space occupied by the site, and the size of the swimming pool can be adjusted as needed to adapt to different site spaces.
2.Secondly, a prefabricated swimming pool can be considered, which can reduce the construction cost of the site, and the size of the pool can be adjusted as needed to fit different site spaces. 3.
In addition, prefabricated swimming pools can also effectively reduce the maintenance cost of the site, as they can be easily moved around, and the pool can be sized as needed to suit different site spaces. In short, the use of prefabricated swimming pools can effectively reduce the space occupied, construction and maintenance costs of the site, and save more resources from Li Shensheng. We can also provide you with more solutions according to your needs.
-
The construction process of a home swimming pool: to determine the condition of the site, fire safety and whether all kinds of licenses are complete must be considered. To consider the issue of floor height, the height of the swimming pool can only be achieved above the floor height, and the indoor swimming pool must be reinforced in the early stage.
The floor slab reinforcement part consists of combining the load-bearing columns of the room where the pool is located to form a reinforcement system, which is at least satisfied with the reinforcement load of square meters. There shall be no obstacles affecting the construction of the swimming pool and platform, and the site shall be level, and the flatness shall not exceed 1cm.
The pre-embedding and installation of swimming pool pipes need to be completed before the steel coaming material enters the site, which will not affect the process of subsequent work. Before installing the steel coaming, it is necessary to measure the site and then install it, otherwise it will lead to unsuitable installation and rework.
Install platform walkway trim. Lay waterproof decorative film, site decoration construction and swimming pool construction try not to interfere with each other, and complete the decoration of the top and wall of the pool before the plastic film is laid.
Install and debug swimming pool equipment, ensure adequate lighting and ventilation in the equipment room, and do a good job of waterproofing. After the construction of the swimming pool is completed, the waterproof acceptance shall be carried out, the operation of the swimming pool shall be checked, and the equipment shall be debugged normally and whether there is any water leakage.
Materials for building pools
1. Swimming pool adhesive film: swimming pool waterproof decorative adhesive film, professional name is polyvinyl chloride diaphragm, which is a new type of material specially developed for swimming pool waterproof and decorative applications, and is made of synthetic resin as the main raw material, adding professional additives and stabilizers. It can be used for the laying of the bottom and wall of the pool, and is used for waterproofing and surface decoration in the pool.
2. Special paint for swimming pools: It is a one-component emulsion waterproof coating prepared by adding other additives to pure acrylic polymer emulsion as the base material, also known as waterproof paint and waterproof coating. The waterproof film formed after curing has certain extensibility, elastic plasticity, crack resistance and impermeability, which can play an anti-seepage role.
3. Pool tiles: mainly including glazed tiles, glass mosaics, ceramic mosaics, shell mosaics and other materials. The chemical properties of swimming pool tiles are stable, the service life is long, the corrosion resistance is strong, the cleaning is convenient, and the slip resistance is good; In addition, with rich colors and complete variety, mosaic puzzles can be customized according to the user's requirements to meet the user's pursuit of beauty.
-
In the hot summer, having your own home swimming pool has become a dream for many people. If you're planning to build a swimming pool as well, you first need to understand the various components of a hand-skating pool.
The most basic structure of the swimming pool is the reinforced concrete base, followed by the tiles or non-slip materials of the pool walls and pool bottom, and the selection of suitable filtration systems and water treatment equipment also requires the selection of suitable filtration systems. The shape and size of the swimming pool also needs to be designed according to your own preferences and site conditions, and the common shapes are rectangular, round, oval and custom.
In addition, the construction of swimming pools needs to consider the surrounding environment and safety issues. The ground should be level, the surrounding area should be non-slip, and at the same time, it is necessary to consider whether there are problems such as leakage and anti-theft. In addition, the maintenance and cleaning of the swimming pool is also very important, and it is necessary to check the descaling, clean the filtration system and add disinfectants after the wax imitation period.
In conclusion, building a home swimming pool requires careful consideration of all factors to ensure the safety, health, and comfort of the pool. If you are not sure how to build the world, you can consult a professional swimming pool construction company or consult a swimming pool expert to get a better construction plan.
-
The best way to avoid after-sales is to start from raw materials and quality, Poseidon prefabricated swimming pool, using imported magnesium-plated aluminum-zinc plate, from production to installation without solder joints, in a real sense to achieve disassembly and assembly, to ensure that the interests of investors are not damaged.
-
Prefabricated swimming pools, also known as disassembled swimming pools, are currently mainly divided into two categories:
Steel structure disassembled swimming pool (this type ***** expensive).
PVC material disassembled swimming pool (such poor quality and steel structure, **low) according to their actual situation to choose which material, if the swimming pool intends to use 10 years or even longer, it is recommended to use steel structure swimming, the main structure of the steel structure disassembled swimming pool is galvanized steel, the service life is particularly long. If it is about 5 years, choose PVC material, in addition to the short service life, other aspects and steel structure is not too much, ** very cheap, cost-effective.
When choosing a construction company or unit, it mainly depends on the service and strength of the other party, the cases that have been done, and then you must plan these, and you must ensure the after-sales service in the future, otherwise it will be more troublesome to disassemble and assemble in the later stage.
The golf is designed first, and the site needs to be cleaned up through the drawings, earthworks, rough modeling, fine modeling, sprinkler irrigation, blind rowing, lawn bed, sand laying, and grass planting.
As of January 23, 2020, the construction of chicken greenhouses needs to be built with steel and plastic film in a sunny place, sheltered from the wind, high dryness, good drainage, and free of soil infectious diseases. Because of the material and area, the construction cost is not fixed, roughly 8 yuan per square meter. >>>More
High temperature cold storage (0-5) 4 hp hermetic compressor or 5 hp fully enclosed compressor is acceptable. If it is a medium-temperature cold storage (-15 --18), use a 7-horse fully enclosed compressor or a semi-enclosed 5-horse compressor. Low-temperature cold storage (-20 --35) requires 15 hp semi-hermetic compressor. >>>More
Gateway billing is required, first of all, you have to determine how many households in the community and how many households are expected to be installed. It's good to determine how to purchase equipment.
The daily management of the underground garage in the general community belongs to the property management, and the underground garage has different attributes because of the different contributions and properties. 1. If it is of the nature of civil air defense, whoever invests will benefit, but it cannot be used in violation of anti-laws and regulations, and the general parking space is only the right to use (no more than 20 years); 2. If it is not civil air defense and the construction money is amortized to the total cost of the community, then it is owned by all the owners; 3. If it is invested by the developer itself, the ownership belongs to the developer.