For example, if a water conservancy project is divided into 5 unit projects, the unit project codes are: 01; 02;03;04;05
Assuming that the 01 unit project is divided into 6 sub-projects, the sub-project codes are as follows: 01-01; 01-02;01-03;01-04;01-05;01-06
Assuming that the 02 unit project is divided into 5 sub-projects, the sub-project codes are as follows: 02-01; 02-02;02-03;02-04;02-05
Assuming that the 01-01 sub-project is divided into 10 unit projects, the unit project codes are as follows: 01-01-01; 01-01-02;01-01-03;01-01-04;01-01-05;01-01-06;01-01-07;01-01-08;01-01-09;01-01-10
Other Divisional Engineering and Unit Engineering codes and so on.
-
The buddy on the second floor said a little misunderstanding: if you think that the division of the unit is unreasonable, you can divide it yourself and report it to the supervisor for approval.
After the supervision department completes the division of the project, the construction unit shall report to the superior competent part for approval, and the project files shall be sorted out in strict accordance with the approved project division after the approval.
The project code can be compiled with reference to the scientific and technological archives management specifications. Divisions, units and unit projects can be set**!
-
Coding of water conservancy projects.
number for example. Say.
Bright. lgdzsg
Lagon Power Station. Construction.
Subject. Civil.
Water diversion system. As-built drawings.
Sequence number.
-
For example:
Assuming that a water conservancy project is divided into 5 unit projects, the unit project codes are as follows: 01; 02;03;04;05
Assuming that the 01 unit project is divided into 6 sub-projects, the sub-project codes are as follows: 01-01; 01-02;01-03;01-04;01-05;01-06
Assuming that the 02 unit project is divided into 5 sub-projects, the sub-project codes are as follows: 02-01; 02-02;02-03;02-04;02-05
Assuming that the 01-01 sub-project is divided into 10 unit projects, the unit project codes are as follows: 01-01-01; 01-01-02;01-01-03;01-01-04;01-01-05;01-01-06;01-01-07;01-01-08;01-01-09;01-01-10
Other sub-engineering and unit engineering codes and so on.
Generally speaking, the Gebin mesh is mainly based on woven mesh, and the specifications of the common Gebin mesh are mainly as follows: Wire diameter: 2mm-4mm Aperture: >>>More
No matter what the project is, the most important thing in construction is safety, the safety of construction personnel, and the safety of construction quality. As far as water conservancy projects are concerned, the quality and safety control is reflected in the qualification review of construction raw materials, the supervision of construction technology, and the foundation treatment in the early stage of construction. >>>More
Just follow the questions prompted, don't think too complicated. >>>More
The term water resources is defined as a source of surface and underground freshwater that can be replenished by natural precipitation. >>>More
1) The reason why the two major water conservancy projects were built in the Qin State: >>>More