How many registered cost personnel with professional titles are needed for the B level cost qualific

Updated on society 2024-03-03
13 answers
  1. Anonymous users2024-02-06

    The requirements for the qualification of cost consulting class B and the staffing required are as follows:

    Class B qualification. 1) The technical person in charge has obtained the qualification of cost engineer registration, and has a senior professional and technical title of engineering or economic series, and has been engaged in engineering cost professional work for more than 10 years;

    2) full-time engaged in engineering cost professional work personnel (referred to as full-time professionals) not less than 12 people, including: engineering or economic series of intermediate or above professional and technical titles of not less than 8 people, to obtain the cost engineer registration certificate of not less than 6 people, other personnel have engaged in engineering cost professional work experience;

    3) The registered capital of the enterprise shall not be less than RMB 500,000;

    4) In the temporary period, the cumulative operating income of the enterprise's engineering cost consulting shall not be less than RMB 500,000;

    5) Have a fixed office space, and the per capita office area shall not be less than 10 square meters;

    6) The technical file management system, quality control system and financial management system are complete;

    7) The social endowment insurance procedures for employees are complete;

    8) Full-time professionals meet the professional age stipulated by the state, and the personnel file relationship is managed by the state-recognized personnel organization;

    9) The number of cost engineers among the investors of the enterprise shall not be less than 60%, and the amount of capital contribution shall not be less than 60% of the total registered capital.

    3. The qualification level of the newly established engineering cost consulting enterprise shall be approved according to the lowest level, and a temporary period of 1 year shall be established.

  2. Anonymous users2024-02-05

    Injection with a professional title, occasional exercise is different for different things.

  3. Anonymous users2024-02-04

    You don't need many silver dollars, you can have twenty or thirty.

  4. Anonymous users2024-02-03

    I'm also in a hurry to get out, how many people haven't registered? A few more inches of personnel have been replaced, and I have all of them in my specific analysis. You can go in and take the test.

  5. Anonymous users2024-02-02

    Guarantee and cost resources need a lot of registered cost with professional titles.

  6. Anonymous users2024-02-01

    The cost consulting company needs 10 cost engineers to upgrade to Class A qualification. There are specific document provisions.

    According to the provisions of the "Measures for the Management of Engineering Cost Consulting Enterprises".

    Full-time personnel engaged in engineering cost professional work (hereinafter referred to as full-time professionals) is not less than 20 people, of which there are no less than 16 people with intermediate or above professional and technical titles in engineering or engineering economy; There are no less than 10 people who have obtained the registration certificate of cost engineer, and other personnel have experience in professional work in engineering cost.

    To apply for the qualification of engineering cost consulting enterprises, the following materials shall be submitted and declared online at the same time:

    A) "Engineering Cost Consulting Enterprise Qualification Level Application";

    B) full-time professionals (including technical leaders) of the cost engineer registration certificate, cost qualification certificate, professional and technical title certificate and ID card;

    3) The personnel contract of full-time professionals (including the person in charge of technology) and the voucher of the basic social endowment insurance fee paid by the enterprise for the current year;

    4) The articles of association of the enterprise, the shareholders' capital contribution agreement, and the certificate of the shareholders' capital contribution issued by the industrial and commercial department;

    E) the business tax invoice for the business income of the enterprise or the business tax payment certificate issued by the tax department for the payment of the business income of the project cost consulting; If the operating income of the enterprise includes other business income, it is also necessary to issue a financial audit report on the operating income of the project cost consulting;

    Sixth) engineering cost consulting enterprise qualification certificate;

    7) Business license of the enterprise;

    8) Lease contract or property right certificate of fixed office space;

    9) documents related to the management of enterprise technical files, quality control, financial management and other systems;

    10) Other materials provided for by laws and regulations.

    New application for engineering cost consulting enterprise qualification, do not need to submit the materials listed in the preceding paragraph (5) and (6).

  7. Anonymous users2024-01-31

    The cost consulting company needs no less than 10 personnel to upgrade to Class A qualification.

    Class A qualification requires full-time personnel engaged in engineering cost professional work (hereinafter referred to as full-time professionals) not less than 12 people, of which, with engineering (or engineering economic) intermediate or above professional and technical titlesThe total number of personnel who have obtained the registration certificate of the second-level cost engineer shall not be less than 10; There are no less than 6 people who have obtained the registration certificate of a cost engineerOther personnel have experience in engineering cost professional work;

    Qualification conditions for Class A engineering cost consulting enterprises:

    A) has obtained the qualification certificate of Class B engineering cost consulting enterprise for 3 years;

    2) Among the enterprise investors, the number of registered cost engineers is not less than 60% of the total number of investors, and the amount of capital contribution is not less than 60% of the total registered capital of the enterprise;

    C) the technical person in charge has obtained the cost engineer registration certificate, and has a senior professional and technical title of engineering or engineering economy, and has been engaged in engineering cost professional work for more than 15 years;

    Fourth) full-time engaged in engineering cost professional work personnel (hereinafter referred to as full-time professionals) not less than 12 people, of which, with engineering or engineering economic intermediate professional and technical titles or obtained the secondary cost engineer registration certificate of not less than 10 people; There are no less than 6 people who have obtained the registration certificate of cost engineer, and other personnel have experience in engineering cost professional work;

    5) The enterprise has signed a labor contract with full-time professionals, and the full-time professionals meet the professional age prescribed by the state (except for investors);

    6) The personnel file relationship of full-time professionals shall be managed by a nationally recognized personnel organization;

    7) The registered capital of the enterprise shall not be less than RMB 1 million;

    8) The cumulative operating income of the enterprise in the past 3 years of project cost consulting shall not be less than 5 million yuan;

    9) Have a fixed office space, with an average office floor area of not less than 10 square meters per capita;

    10) The technical file management system, quality control system, and financial management system are complete;

    11) The enterprise handles the basic social endowment insurance procedures for the full-time professionals of the unit is complete;

    12) There are no of the following behaviors within 3 years before the date of application for verification of qualification level:

    1. Altering, reselling, leasing, or lending qualification certificates, or illegally transferring qualification certificates in other forms;

    2. Undertake project cost consulting business beyond the scope of qualification level business;

    3. At the same time, accept the tenderer and the bidder or two or more bidders for the same project project cost consulting business;

    4. Unfair competition by giving kickbacks, maliciously lowering fees, etc.;

    5. Subcontracted project cost consulting business;

    6. Other acts prohibited by laws and regulations.

  8. Anonymous users2024-01-30

    The qualification level of engineering cost consulting enterprises is divided into two levels: Grade A and Grade B.

    The qualification standards for Class A engineering cost consulting enterprises are as follows:

    A) has obtained the qualification certificate of Class B engineering cost consulting enterprise for 3 years;

    2) Among the enterprise investors, the number of registered cost engineers is not less than 60% of the total number of investors, and the amount of capital contribution is not less than 60% of the total registered capital of the enterprise;

    C) the technical person in charge has obtained the cost engineer registration certificate, and has a senior professional and technical title of engineering or engineering economy, and has been engaged in engineering cost professional work for more than 15 years;

    D) full-time engaged in engineering cost professional work personnel (hereinafter referred to as full-time professionals) not less than 20 people, of which, with engineering or engineering economic intermediate professional and technical titles of not less than 16 people; There are no less than 10 people who have obtained the registration certificate of cost engineer, and other personnel have experience in professional work in engineering cost.

    5) The enterprise has signed a labor contract with full-time professionals, and the full-time professionals meet the professional age prescribed by the state (except for investors);

    6) The personnel file relationship of full-time professionals shall be managed by a nationally recognized personnel organization;

    7) The registered capital of the enterprise shall not be less than RMB 1 million;

    8) The cumulative operating income of the enterprise in the past 3 years of project cost consulting shall not be less than 5 million yuan;

    9) Have a fixed office space, with an average office floor area of not less than 10 square meters per capita;

    10) The technical file management system, quality control system, and financial management system are complete;

    11) The enterprise handles the basic social endowment insurance procedures for the full-time professionals of the unit is complete;

    12) within 3 years before the date of application for verification of qualification level, there is no act prohibited by Article 27 of these measures.

  9. Anonymous users2024-01-29

    The qualification standards for Class A engineering cost consulting enterprises are as follows:

    A) has obtained the qualification certificate of Class B engineering cost consulting enterprise for 3 years;

    B) the technical person in charge has obtained a cost engineer registration certificate, and has a senior professional and technical title of engineering or engineering economy, and engaged in engineering cost professional work for more than 15 years;

    C) full-time engaged in engineering cost professional work personnel (hereinafter referred to as full-time professionals) not less than 12 people, of which, with engineering (or engineering economic) intermediate professional and technical titles or obtained a total of not less than 10 people registered as a secondary cost engineer; There are no less than 6 people who have obtained the registration certificate of a cost engineer, and the other personnel have experience in the professional work of engineering cost;

    4) The enterprise has signed a labor contract with full-time professionals, and the full-time professionals meet the professional age prescribed by the state (except for investors);

    5) The cumulative operating income of the enterprise in the past 3 years of project cost consulting shall not be less than 5 million yuan;

    6) The enterprise has completed the basic social endowment insurance procedures for the full-time professionals of the unit;

    7) There are no of the following behaviors within 3 years before the date of application for verification of qualification level:

    1.altering, reselling, renting, or lending qualification certificates, or illegally transferring qualification certificates in other forms;

    2.Beyond the scope of qualification level business to undertake project cost consulting business;

    3.At the same time, accept the tenderer and the bidder or two or more bidders for the same project cost consulting business;

    4.unfair competition by giving kickbacks, maliciously lowering fees, etc.;

    5.subcontracted project cost consulting business;

    6.Other acts prohibited by laws and regulations.

    The qualification standards for Class B engineering cost consulting enterprises are as follows:

    A) the technical person in charge has obtained a cost engineer registration certificate, and has a senior professional and technical title of engineering or engineering economy, and engaged in engineering cost professional work for more than 10 years;

    B) full-time professionals not less than 6 people, of which, with engineering (or engineering economics) intermediate professional and technical titles or obtained the secondary cost engineer registration certificate of the total of not less than 4 people; There are no less than 3 people who have obtained the registration certificate of a cost engineer, and other personnel have experience in engineering cost professional work;

    3) The enterprise has signed a labor contract with a full-time professional, and the full-time professional meets the professional age prescribed by the state (except for investors);

    4) The enterprise has completed the basic social endowment insurance procedures for the full-time professionals of the unit;

    E) the temporary period of project cost consulting business income not less than 500,000 yuan;

    6) There is no act prohibited by Article 25 of these measures before the date of application for verification of qualification level.

  10. Anonymous users2024-01-28

    1) The technical person in charge has obtained the qualification of cost engineer registration, and has a senior professional and technical title of engineering or economic series, and has been engaged in engineering cost professional work for more than 10 years;

    2. Full-time personnel engaged in engineering cost professional work (referred to as full-time professionals) is not less than 12 people, including: no less than 8 people with intermediate or above professional and technical titles in engineering or engineering economic series, no less than 6 people who have obtained the registration certificate of cost engineers, and other personnel have experience in engineering cost professional work;

    3) The registered capital of the enterprise shall not be less than RMB 500,000;

    4) In the temporary period, the cumulative operating income of the enterprise's engineering cost consulting shall not be less than RMB 500,000;

    5. Have a fixed office space, with an average office area of not less than 10 square meters per capita;

    6. Complete technical file management system, quality control system and financial management system;

    7) The social endowment insurance procedures for employees are complete;

    8) Full-time professionals meet the professional age stipulated by the state, and the personnel file relationship is managed by the state-recognized personnel organization;

    9. The number of cost engineers among the investors of the enterprise shall not be less than 60, and the amount of capital contribution shall not be less than 60 of the total registered capital.

  11. Anonymous users2024-01-27

    I remember that our company was 8 at that time, a senior engineer, and the cost clerk did not ask for it, and now I don't know. The registered capital is 500,000 yuan.

  12. Anonymous users2024-01-26

    What personnel need to be equipped with the cost of Class B qualification:

    Technical person in charge - cost engineer registration qualification and with engineering or economic series of senior professional and technical titles, and engaged in engineering cost professional work for more than 10 years;

    Full-time engaged in engineering cost professional work personnel (referred to as full-time professionals) is not less than 12 people, including: engineering or economic series of intermediate or above professional and technical titles of not less than 8 people, obtained the cost engineer registration certificate of no less than 6 people, and other personnel have engaged in engineering cost professional work experience.

    Full-time professionals meet the professional age stipulated by the state, and the personnel file relationship is managed by the state-recognized personnel ** agency.

  13. Anonymous users2024-01-25

    Three registered cost personnel are required to do the cost of grade B, one of whom must be the technical person in charge with a senior title, and the other two are not limited.

Related questions
9 answers2024-03-03

1) Have independent legal personality and have a registered capital of more than 800,000 yuan; >>>More

6 answers2024-03-03

Solid Waste Disposal Level B Personnel Requirements:

Registration: Level 1 Registration Structure 1 Registered Power Supply and Distribution 2 Registered Power 2 Non-Registered: Environmental Protection Intermediate 4 Environmental Protection Senior Engineer 1 Machinery Advanced 1 Automatic Control Advanced 1 Budget Estimate Intermediate 2 Handling Process Step 1 Industrial and Commercial Registration. >>>More

10 answers2024-03-03

Generally speaking, once a qualification has expired, it cannot be renewed. According to the built. >>>More

8 answers2024-03-03

Class A qualification certification conditions >>>More

9 answers2024-03-03

Landscape architecture design grade B qualification personnel: landscape architecture title 6 people (including senior 2 people, intermediate 4 people) secondary structure 1 person secondary structure 1 person registered HVAC 1 person registered water supply and drainage 1 person power supply and distribution 1 person estimated budget 1 person personnel requirements: (1) professional equipment is complete and reasonable, and the major and quantity of main professional and technical personnel meet the provisions of the "main professional and technical personnel allocation table" in the special qualification standards applied. >>>More