  1. Anonymous users2024-02-06

    I) the personnel with Class B qualification for power transmission and transformation? Substation.

    Electrical) engineering (Grade B) qualification staffing;

    Words) registered electrical (power generation, transmission and transformation) 3 15-180,000 3 years.

    1) 1 second-level registered structural engineer 40,000 3 years.

    8) 1 second-class registered architect 30,000 3 years.

    9) HVAC intermediate engineer 1 7000 per year.

    2) 1 7000 intermediate titles in water supply and drainage per year.

    4) Estimated budget for 1 7000 (5) per year.

    8) Power system senior engineer 1 18000 per year (5).

    5) Communication protection senior engineer 1 18000 per year.

    1) General map senior engineer 1 50,000 per year.

    5) The total number of personnel with Class B qualification for substation engineering (11) is required to handle the qualification process

    1. Industrial and commercial registration;

    2. Purchase the system of the Ministry of Construction or the Department of Construction;

    3. Staffing and registering personnel;

    4. Prepare the reporting materials (online declaration and print to form paper materials);

    5. Submit materials;

    6. Examination and approval (approval process) Municipal Construction Commission - Construction Department - Ministry of Construction - publicity.

  2. Anonymous users2024-02-05

    The personnel required for Class A qualification for power transmission and transformation engineering are as follows:

    6 registered power generation, transmission and transformation.

    3 registered first-level structures.

    1 registered second-class building.

    1 registered secondary structure.

    HVAC Intermediate 1.

    1 intermediate level of water supply and drainage.

    Intermediate budget estimate: 2 people.

    2 senior in power system.

    2 senior communication protection winners.

    2 senior in general drawing.

    Environmental protection intermediate: 1.

    Handle the qualification process.

    The first step is industrial and commercial registration.

    The second book purchases software (Beijing Construction Source Information****) The third step is to allocate personnel and register personnel.

    Step 4: Prepare the reporting materials (apply online and print out the reporting materials), and Step 5: Submit the materials.

    Step 6 Approval (Approval Process) Municipal Construction Committee - Provincial Construction Department.

    The detailed list of qualification declarations is as follows:

    1. Application form for engineering design qualification;

    2. A copy of the business license and the articles of association;

    3. Relevant certificates of enterprise legal person, technical person in charge, registered engineer and non-registered engineer. For example: identity certificates, academic certificates, professional title certificates, performance certificates, etc., which items are needed, and the standard number can be seated, especially pay attention to the social security certificate of professional and technical personnel, which is also within the scope of inspection;

    4. Proof of the company's business premises.

  3. Anonymous users2024-02-04

    Level qualification personnel: 12 (7 registered personnel, 5 professional title personnel).

    1) Registered personnel: 2 first-class architects, 2 first-class structural engineers, 1 registered water supply and drainage, 1 registered HVAC, and 1 registered power supply and distribution.

    2) Professional titles: construction engineer, structural engineer, water supply and drainage engineer, HVAC engineer, electrical engineer (1 each).

  4. Anonymous users2024-02-03

    Personnel of Class B qualification 2113 for power transmission and transformation? Substation.

    Engineering (Grade B) Qualification Staffing;

    3 registered electrical (power generation, transmission and transformation) 15-180,000 3 years, 1 second-level registered structural engineer 40,000 3 years.

    1 second-class registered architect 30,000 3 years.

    HVAC 5261 intermediate engineer 4102 engineer 1 7000 per year water supply and drainage intermediate title 1 7000 per year.

    Estimated budget for 1 7000 workers per year (5).

    1 18,000 senior engineers of power system per year (5) 1 senior engineer of communication protection 18,000 per year.

    1 50,000 senior engineers per year.

    Substation Engineering Class B 1653 Qualification Staffing Total (11) Qualification Process:

    1. Industrial and commercial registration;

    2. Purchase the system of the Ministry of Construction or the Department of Construction;

    3. Staffing and registering personnel;

    4. Quasi-version for reporting materials (online declaration and printing to form paper materials);

    5. Submit materials; Right.

    6. Examination and approval (approval process) Municipal Construction Commission - Construction Department - Ministry of Construction - publicity.

  5. Anonymous users2024-02-02

    Substation engineering (Grade B) qualification staffing; (with evidence).

    Registered electrical (power generation, transmission and transformation) 3 150,000 1 year.

    1 registered first-class structural engineer 130,000 1 year.

    Class II Registered Structural Engineer 1 45000 1 year.

    1 second-class registered architect 30,000 1 year.

    1 HVAC intermediate engineer 7000 per year.

    1 intermediate title of water supply and drainage, 7000 per year.

    The estimated budget is 1 7,000 per year.

    1 18,000 senior engineers in the power system.

    Communication protection senior engineer 1 15000 per year.

    General plan senior engineer 1 50,000 per year substation engineering grade B qualification with a total of personnel (12).

    Handle the qualification process.

    1. Industrial and commercial registration;

    2. Purchase the system of the Ministry of Construction or the Department of Construction;

    3. Staffing and registering personnel;

    4. Prepare the reporting materials (online declaration and print to form paper materials);

    5. Submit materials;

    6. Examination and approval (approval process) Municipal Construction Commission - Construction Department - Ministry of Construction - publicity.

  6. Anonymous users2024-02-01

    Grade C power design qualification for power transmission and transformation requires personnel, and our company can provide all full-time and upright personnel!

    1) It has the qualification of an independent corporate legal person.

    2) Good social reputation, registered capital of not less than 500,000 yuan.

    Grade C qualification for power transmission and substation engineering design.

    Registered electrical power generation and transmission 100,000 a year (1 person).

    Registered Level 2 Structural Engineer 30,000 a year (1 person).

    General Drawing Senior Engineer 20,000 a year (1 person).

    20,000 years of senior engineer in electric power (1 person).

    The estimated budget of the project economy is 20,000 yuan a year (1 person).

    20,000 senior engineers of communication protection (1 person).

    Handle the qualification process.

    1. Industrial and commercial registration;

    2. Purchase the system of the Ministry of Construction or the Department of Construction;

    3. Staffing and registering personnel;

    4. Prepare the reporting materials (online declaration and print to form paper materials);

    5. Submit the information of the qualification applicant;

  7. Anonymous users2024-01-31

    12 personnel are required to handle the power transmission and transformation project in the power industry, as follows:

    3 registered power generation, transmission and transformation.

    1 registered first-level structure.

    1 for Grade 2 building.

    1 for the secondary structure.

    1 registered HVAC intermediate.

    1 intermediate level of water supply and drainage.

    1 intermediate in the estimated budget.

    1 senior in power system.

    1 person for communication protection.

    1 senior in the general picture.

Related questions
12 answers2024-03-13

The engineers required for the C-level qualification for power transmission and transformation in power design are: 1 person for registered power generation, transmission and transformation, 1 person for registered secondary structure, 1 person for estimated budget middle engineer, 1 person for communication senior engineer, 1 person for electric power senior engineer, and 1 senior engineer for general planning. >>>More

10 answers2024-03-13

What is the difference between Grade A and Grade B? Let's take a look at it with Tongbang Information Technology. >>>More

6 answers2024-03-13

1. Grade A qualification for water pollution prevention and control. >>>More

8 answers2024-03-13

Class A qualification certification conditions >>>More

13 answers2024-03-13

The requirements for the qualification of cost consulting class B and the staffing required are as follows: >>>More