The slope of the bathroom is a problem that needs to be paid attention to at the beginning, the best way is to rework, of course, it is recommended to do a little more if you can't rework now, and the following are a few treatment measures.
Use glass glue and plastic sheets to make your own small partition to block the flow of water by reducing water storage.
It is advisable to make a small sink at the back of the river and drain it to a normal slope position.
It's better to put a mop there to absorb water, or clean it frequently.
-
The slope of the toilet is the angle at which the whole bathroom floor is inclined to the direction of the floor drain, and the slope of the toilet is mainly to make the sewage on the bathroom floor can be smoothly discharged to the floor drain to avoid sewage siltation.
According to the provisions of Article 6 of the General Principles for the Design of Civil Buildings, the ground elevation of the toilet building should be lower than the elevation of the corridor or other rooms by 10, and the slope of the floor should be leaked to the ground.
-
It's best to redo it, and if you really don't want to, see if you can make a water barrier to stop the water from flowing behind the toilet.
-
It is recommended to redo it, and it is not very troublesome. If you don't redo it, you only have to pay for it, and if you don't redo it, you have to pay for it, and the effect is not very beautiful.
Just go to the nearby community to find a worker to make some money, it's a small problem, and it's better to live by yourself once and for all.
If you are looking for a decoration company to decorate, you will find someone else to do it again.
-
In addition to redoing the ground, the only thing is to drag it often.
-
When using the bathroom daily, it is easy to produce a large amount of water, which needs to be discharged in time, which means that in the decoration process of the bathroom, a certain slope needs to be designed. So what is the slope of the bathroom floor, and how to get the slope of the bathroom floor tiles, do you understand? Now let's take a look.
1. What is the slope of the bathroom floor?
The slope of the bathroom floor is generally about 5 degrees, which is also the standard stipulated by the state. When decorating the bathroom, the ground needs to be designed with a certain slope, in order to allow the stagnant water to be discharged smoothly through the floor drain.
Second, how to get the slope of the bathroom floor tile.
1. Before decorating the bathroom, determine the required slope according to the installation position of the floor drain, pay attention to the range should not be too large, not bring too much difference to the vision, and ensure that the floor drain is the lowest point.
2. To determine the standard of laying floor tiles, it is generally to use professional leveling tools to mark the position on the wall. Then use sand to spread a 4cm thickness on the floor of the bathroom, which needs to be even.
3. According to the previous standards, the paving of ceramic tiles needs to be carried out according to strict indicators. The paving of the floor tiles in the bathroom must be neat, and the gaps between the tiles should be even, keeping 1 2mm.
4. The position of installing the floor drain is the lowest point, so it is necessary to cut out the tiles laid around the floor drain, so as to design the best effect.
5. After the tiles of the bathroom are laid, they need to be allowed to dry thoroughly, and it is necessary to wait for about 72 hours here, and it is forbidden to place any heavy objects on the tiles during this time. Once dry, you can move on to the next process.
What is the slope of the bathroom floor, and how to get the slope of the bathroom floor tiles, I will introduce it here, do you understand? In the process of designing the bathroom, there needs to be a certain slope, so that it is conducive to the smooth flow of water generated daily and ensure normal use.
-
Around 5 degrees. Because there is a lot of water in the bathroom, in order to let the water flow into the floor drain as soon as possible, the ground must do a certain slope, and there is no specific regulation on the size of the slope, and the construction party will design the slope according to the requirements of the owner. The owner requires that the toilet is not waterlogged, the slope is low, and the construction is relatively simple.
The owner needs the water to flow away as soon as possible, so the slope of the bathroom is designed to be higher.
The floor elevation of the bathroom should be designed to be 20 50mm lower than that of the interior. The ground is facing the drain, and the drainage slope is 2% and 3% for the first voyage. Toilet backfill, leveling, should be drained as the center to the four directions of radiation, find the slope, scrape with a ruler, plastering surface requirements flat, no pits, no gaps, no sand, no water accumulation.
The slope of the water pipe should also be paid attention to when the water pipe is installed, and the slope of the water supply horizontal pipe should be sloped to the discharge device or water distribution point, and the water supply inlet pipe should have a slope of not less than the slope to the outdoor water supply pipe.
-
In order to make it easier for water to flow into the sewer pipe and avoid water accumulation, it is generally necessary to form a certain slope on the floor of the bathroom, that is, to make the bathroom floor fall into a phenomenon of high on one side and low on the other, so how many centimeters does the slope of the toilet drop? Let's take a look at this article together.
1. The greater the slope between the bathroom floor and the floor drain, the faster the drainage speed of the bathroom floor will be. If the slope of the toilet is not enough, it is easy for the water on the floor of the toilet to flow around, and then it will form water accumulation in some areas of the ground with a relatively small slope, or the drainage will be very slow.
2. The slope of the bathroom is generally about 5 degrees, as long as the slope is within this angle, it is generally in line with the standard, and there will be no problems. In general, the slope of the toilet drain should be set at more than 1%, that is to say, the slope of a one-meter drain pipe should be more than 1cm, and the slope of a two-meter drain pipe should be more than 2cm.
3. There is no fixed answer to the question of how many centimeters the slope of the bathroom is, because the actual area and structure of each bathroom are different. Some owners will set the slope wider in order to make the water flow faster.
4. Under normal circumstances, the slope of the bathroom is within 2%, which is the most suitable pinning hill, that is to say, the slope difference of the bathroom should not exceed 2cm. If the slope of the bathroom is too high, it will cause some impact on other bathroom equipment in the bathroom.
5. We should set the appropriate toilet slope according to the actual area and structure of the bathroom, and the toilet slope should not be set too large or too small. If the slope of the bathroom floor is too large, people will feel uncomfortable when standing on the bathroom floor. Therefore, the slope size should be set to meet the drainage requirements and not accumulate water.
The above is a detailed introduction to the slope drop of a few centimeters in the bathroom, I hope it can help you solve the decoration problem about the slope of the bathroom. It is recommended that you should decide the slope of the bathroom according to the actual situation of the bathroom, and try to make the drop smaller.
-
Summary. Hello, dear, the slope of the toilet ** is as follows, the slope of the toilet is: 1. Determine the slope.
According to the location of the floor drain, the entire bathroom needs to be inclined to the position of the floor drain as a whole, the amplitude is not too large, and the sensory gap is not too large, but to ensure that the floor drain is the lowest point of the bathroom. Ultra-flat, 2, ultra-flat is to draw the standard of paving tiles, is an important preparation for the laying of floor tiles, you can use laser ultra-flat tools, you can also use ultra-flat ruler, after ultra-flat on the wall to mark the position, determine the standard that needs to be glued bricks, 3, fill sand. Lay the prepared sand on the bathroom floor, the general height is about 4cm, and the specific needs to be confirmed according to the thickness of the overall laying of the house, put the sand evenly into the bathroom, lay it flat, 4. Stick bricks.
According to the marks done in the early stage, lay the floor tiles in the bathroom, pay attention to the floor tiles must be laid in strict accordance with the ultra-flat line, the whole needs to be laid neatly, the gaps are even, do not leave too large joints, up to 1-2mm, 5, floor drain treatment. The floor drain is the lowest point of the whole bathroom, when laying the floor tiles, the floor tiles around must be cut, as shown in the figure below, in order to achieve a better effect, 6, drying. After the floor tiles are laid, you need to wait for drying, the time is about 72 hours, do not place heavy objects or step on them during the period, and the laying will be completed after drying, and you can proceed to the next step
Have a happy life, work smoothly, be safe and healthy!
Hello, dear, the slope of the toilet ** is as follows, the slope of the toilet is: 1. Determine the slope. According to the location of the floor drain, the entire bathroom needs to be inclined to the position of the floor drain as a whole, and the amplitude should not be too large, so that the senses can not see that it is too bad to make a big gap, but to ensure that the floor drain is the lowest point of the bathroom.
Ultra-flat, 2, ultra-flat is to draw the standard of paving tiles, is an important preparation for the laying of floor tiles, you can use laser ultra-flat tools, you can also use ultra-flat ruler, after ultra-flat on the wall to mark the position, determine the standard that needs to be glued bricks, 3, fill sand. Lay the prepared sand on the bathroom floor, the general height is about 4cm, and the specific needs to be confirmed according to the thickness of the overall laying of the house, put the sand evenly into the bathroom, lay it flat, 4. Stick bricks. According to the marks done in the early stage, lay the floor tiles in the bathroom, pay attention to the floor tiles must be laid in strict accordance with the ultra-flat line, the whole needs to be laid neatly, the gaps are even, do not leave too large joints, up to 1-2mm, 5, floor drain treatment.
The floor drain is the lowest point of the whole bathroom, when laying the floor tiles, the floor tiles around must be cut, as shown in the figure below, in order to achieve a better effect, 6, drying. After the floor tiles are laid, you need to wait for drying, the time is about 72 hours, do not place heavy objects or trample during the period, wait for the drying to be laid, you can carry out the next step, thank you for your consultation, I am very happy to answer for you, I hope to help you, I wish you: happy life, smooth work, safe and hungry oak Kang Hu stupid!
-
The ground slope of the bathroom is generally to drain the floor drain of the ground, the slope is about 2 to 3%, and the floor height design of the bathroom should be 20 to 50 mm lower than the interior, which is relatively suitable.
How can the bathroom be non-slip?
Bathroom leakage generally does not involve the wall, if you knock on the wall, you only need to pay attention to whether it is a load-bearing wall. However, the waterproofing of the ground should be expanded. The location of the bathroom after expansion must be waterproof!
First, the selection of wooden door repair scheme.
Wooden doors are mostly used as interior doors, and their appearance has a great impact on the effect of the whole home. For the renovation of wooden doors, different solutions need to be taken for different damage situations. >>>More
The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More
Directly on the waterproof paint. And I personally recommend that in the shower room, a position with a lot of water, don't brush to a meter as required, and brush it directly to the top. Stay on the safe side.