How can you be a competent building builder

Updated on society 2024-03-13
11 answers
  1. Anonymous users2024-02-06

    1. Work under the direct leadership of the project manager and implement safety first.

    First, the principle of prevention first, according to the provisions of the safety precautions, the implementation of the safety and filial piety of the whole work, so that the efficiency must be stressed, the production must first grasp safety.

    2. Conscientiously familiar with the construction drawings, prepare the construction organization design plan and the construction safety, quality and technical plan, and prepare the individual project schedule and manpower, material resources plan and machine, tool and equipment plan.

    3. Prepare and organize employees to meet and study on schedule, reasonably arrange, scientifically guide, and successfully complete the construction tasks of the project.

    4. Cooperate with the project manager, conscientiously fulfill the terms of the "Construction Contract", ensure the smooth progress of construction, and maintain the reputation and economic interests of the enterprise.

    5. Prepare the implementation plan of the civilized construction site, reasonably plan and lay out the site plan according to the construction site of the project, and implement and create a civilized construction site.

    6. Prepare the general schedule and monthly schedule of the project and the monthly schedule of each construction team.

    7. Do a good job in the cost accounting of the sub-project general contracting (according to the individual item and the sub-item) separately and timely accounting, and notify the management personnel of the contracting department of the accounting results in time, so as to improve the construction plan and plan in time and strive for higher efficiency.

    8. Issue the construction task book and material limit picking list to each team. Work with the project manager.

    9. Supervise the construction materials and equipment to enter the site on time and be in a qualified state to ensure the smooth progress of the project.

    10. Participate in the completion and inspection of the project, and be responsible for the intact protection of the project.

    11. Rationally allocate production factors and strictly organize construction to ensure the progress and quality of the project.

    12. Organize the acceptance of concealed projects and participate in the quality assessment of sub-projects.

    13. Participate in the review of drawings and the preparation of the project schedule.

  2. Anonymous users2024-02-05

    At least you have an internship on the construction site for a period of time, how to make the workers have work and not miss work, prepare the work to be done the next day one day in advance, and then read some books on civil engineering, which are sold in bookstores. Grasp the technology of each floor and handle the relationship with Party A.

  3. Anonymous users2024-02-04

    The words of "more than seventy percent, eighty percent less, and nine achievements can be leaders" on the construction site are actually quite self-deprecating. After a few years of construction, I still have some experience, and it should be a brick throw.

    I would like to talk about some of my construction experiences and learn from you.

    What should a technician do on a construction site?

    In the previous paragraph, there were four college students who applied for employment in our unit, they were very confident and practical at the same time, and told me a lot of lofty ideals and ambitions, and also euphemistically talked about the slight dissatisfaction with the salary, I told them: do their job well, if you want to eat this bowl of rice, you must calm down, look more, ask more, and have more eyes, you can use this experience as a springboard, but you can't take the work seriously. You are allowed to not understand, but you are not allowed to ask when you don't understand and make your own opinions.

    When I was asked what the technician should do on the construction site, I told him: pay-off, material plan, write technical disclosure, sampling and inspection of raw materials, on-site quality inspection, filling in concealed data, review of steel bar cutting list, inspection of formwork size and elevation, etc., but at the beginning, you only need to follow the foreman to complete the tasks assigned by the foreman.

    First of all, the pay-off, the full-time surveyor set the main axis, the elevation control point is done, the technician should master the basic skills of the pendant, can not rely on the theodolite, it is impossible and unrealistic, and then a residential and office building positioning line is much simpler, and the industrial plant is much more complicated.

    When measuring the size of the pay-off, it is necessary to avoid measuring it with a small ruler (3 meters and 5 meters on the construction site), so as to avoid the accumulation of errors. In addition, when the height difference between two points is large, the general slant distance and the height difference between two points are calculated by the Pythagorean theorem and the usual error is much smaller. Remember a few important points that the teacher said when learning to measure:

    First the whole, then the broken part; Frequent review, the previous step of the work has not been reviewed, and the next step of the work cannot be carried out; The measurement is checked step by step.

    Measuring pay-off is especially important during construction, and a little negligence on your part can cause very large financial losses. Now the measurement of the construction site is not as formal as the measurement distance in the school measurement practice, there is a front ruler, a back ruler, a reading, and a record, often the foreman and technician go to the line, and then the site calls a worker to help, which is really not appropriate, you can not ask the project manager to be equipped with enough professionals to accompany you in positioning, but you must be cautious, and run back and forth before the ruler.

    The elevation on the construction site is generally also a technician's business, you look at the level, the ruler is not necessarily who it is, it should be noted that the tower ruler pitch before and after the observation results have a great impact, and another is that the tower ruler is not good to grasp when the non-professional person is not good at the point, if you do not repeatedly admonish, the difference of 3 5 mm is not strange at all.

  4. Anonymous users2024-02-03

    Excellent technology, can drink and play, and can speak

  5. Anonymous users2024-02-02

    Installation, design and construction are sure that they are not responsible! But I still have to say it when I see that there are holes in the design! That's it!

  6. Anonymous users2024-02-01

    The construction worker is also called the foreman.

    It's that eating, drinking, and Lazar are looking for you on the construction site. What kind of coordination, there is no material, calculation. I know how to build. The one who is directly accountable to the project manager is you. That is, the one at the grassroots level.

    Technicians, it's about technology, and it's about going to the construction site to see if it meets the technical requirements.

    In short, the construction staff of the general construction unit is higher than the technician. This is in the case of the difference between the two job titles in your organization. I often combine them into one.

    For example, the project manager and the chief engineer. A tube production, a tube technology, the progress of production, the quality of technology, to find fault with your production. But what makes money for an enterprise is production, and it is impossible for you to find fault and create profits for you.

    Do you understand? If you do a good job as a construction worker, you can develop as a manager in the future. If you do a good job as a technician, you can develop into a chief engineer.

    Of course, many units are not so subdivided. What you are going to do, you will do it in the future. There is no need to be so clear. If you are a newcomer, I recommend that you become a construction worker. More promising than a technician.

  7. Anonymous users2024-01-31

    Job Selection in the Construction Industry Part 1: How about the income of general contractors? This position is not for me.

  8. Anonymous users2024-01-30

    1. Understand the construction process and arrange the personnel and materials for the next process in advance.

    2. Be familiar with the construction drawings.

    3. It is necessary to do a good job in the interpersonal relationship between all parties involved in the construction.

    4. In addition, the constructor must have a certain economic right, otherwise the command will not move.

  9. Anonymous users2024-01-29

    The constructor should inspect the construction site more, find more problems, and solve the problems raised by Party A and the supervisor in a timely manner (this is very important, if you enthusiastically solve the problems they raise, you will be able to deal with many things on the site in the future, such as concealed acceptance, visas, etc.). Communicate and coordinate more with other construction personnel.

    The important process should be inspected more, and the next process construction should be carried out only if there is no problem. There are many more that need to be learned on the construction site, and the most important thing is to improve your professional level.

  10. Anonymous users2024-01-28

    A person who plans, motivates, organizes, and manages team members, and teaches the techniques and techniques necessary to design a product or application.

    Scope of work: Work under the leadership of the project manager and be responsible for the technical work of the entire project.

    Preparation of construction plans and construction plans;

    Preparation of material plans, including monthly plans, and plans for the use of funds;

    Preparation of construction schedules;

    Responsible for the technical disclosure of the parts of the civil engineering, hydropower, and greening and the construction process practices of the sub-projects, and is responsible for coordinating the coordination of the construction process of civil engineering, hydropower, and greening, and the construction personnel of civil engineering, hydropower, and greening cooperate with each other.

    Responsible for the verification of the entry of materials, the quantity and quality acceptance of the sub-project quantity completed by the construction team, and the inspection of progress, safety, quality, on-site management and cost control.

    Responsible for the review and verification of the steel bar cutting of the whole project.

    Responsible for the visa work of Party A's supervision, concealed engineering, design changes, and project additions and decreases.

    According to the company's requirements, do the engineering cost control work of the whole project.

    Responsible for the synchronization of engineering technical data with the progress of the project.

  11. Anonymous users2024-01-27

    One. Conscientiously implement the construction specifications of the Ministry of Construction, and implement the relevant regulations issued by the provinces and municipalities. 2. Responsible for the technical work of the work number, participate in the review of drawings, and participate in the formulation of construction design and construction plans.

    3. Guide the professional teams to carry out construction in strict accordance with the construction specifications according to the requirements of the drawings or design requirements. 4. Assist engineers to solve all kinds of problems encountered in production and construction. Cooperate with the quality inspection personnel to inspect and accept the branch and sub-project to control the quality.

    Fifth, according to the construction specifications and acceptance standards for the division, sub-project quality inspection industry. Sixth, for each subject required to be inspected by the project, we must be prepared to test the customs declaration quality inspection station according to the unified requirements of the state. 7. Before the completion of the project, all the internal data drawings will be sorted out and submitted to the relevant departments according to the standards and requirements.

    8. Conduct regular health and safety inspections on the residences of construction personnel, and resolutely correct those that do not conform to the safety and health conditions. 9. In the preparation of the construction organization design, there should be technical safeguard measures for the health, environmental protection and safety of the building number.

Related questions
4 answers2024-03-13

1. Actively guide students.

As a teacher, you must know how to correctly guide the students in your class, guide them to work hard and struggle in a positive direction, lead them to avoid dangerous and harmful areas, and let them grow up proudly, healthily and strongly. >>>More

12 answers2024-03-13

The way to be a good manager: know people well; Lead by example; learn to communicate; Learn to empower and so on. >>>More

12 answers2024-03-13

The quality of the people on the construction site is not high, and it is really not easy for you to be a girl. >>>More

6 answers2024-03-13

Take a look at "The Legend of the Condor Heroes", and see how Guo Jing changed from a young boy to a general who can lead the three armies, and a great hero who understands righteousness... Hehe, of course, this can only give you some inspiration from the mind, and the real transformation can only let life teach you and hone you! >>>More

6 answers2024-03-13

Eat a reasonable diet, exercise moderately, quit smoking and drinking, and have regular physical examinations.