When is the most appropriate time to do bathroom waterproofing

Updated on home 2024-03-02
22 answers
  1. Anonymous users2024-02-06

    When the bathroom is waterproof, it is generally best for you to do it when you are about to finish it, and it is best not to do it in the rainy day, so it is said that the waterproof time is in the dry winter, and it is best to do it in November and February.

  2. Anonymous users2024-02-05

    It depends on the specific situation, but in general, it must be done before construction, so it is relatively better.

  3. Anonymous users2024-02-04

    The waterproofing of the bathroom is the most suitable to do before tiling. Before laying tiles, the bathroom should be waterproofed and stored to observe whether there is any water leakage throughout the day. There is no case to re-tile.

  4. Anonymous users2024-02-03

    When is the best time for you to waterproof your bathroom? After overnight, the bathroom is waterproof, and then it is most suitable to do it, so the bathroom waterproofing is whether the bathroom is waterproof, suitable, I am the most suitable.

  5. Anonymous users2024-02-02

    When is the most appropriate time to do bathroom waterproofingBathroom waterproofing is the most suitable to do after the floor tiles are glued first. The south and north bedrooms in the living room, the floor tiles are glued before the waterproof of the bathroom.

  6. Anonymous users2024-02-01

    When is the most appropriate time to do bathroom waterproofingWaterproofing the bathroom before moving in, it's best.

  7. Anonymous users2024-01-31

    It is best to lay floor tiles after waterproofing the bathroom when you are just about to decorate.

  8. Anonymous users2024-01-30

    Bathroom waterproofing should be done before decoration to prevent water seepage during the decoration process.

  9. Anonymous users2024-01-29

    When is the most appropriate time to do bathroom waterproofingThis is different for everyone, of course, for me, it is to do it when I have time? There are also people who are used to looking at the days according to Feng Shui, so you should follow your own customs.

  10. Anonymous users2024-01-28

    The waterproofing of the bathroom is that the waterproofing can be done after the water pipes and electrical pipes are successfully laid.

  11. Anonymous users2024-01-27

    The water pipe is laid, and the wire line can be remodeled to do waterproofing.

  12. Anonymous users2024-01-26

    When is the most appropriate time to do bathroom waterproofingIt is most suitable to occupy the persistence of the living room in the south and north of the living room.

  13. Anonymous users2024-01-25

    Bathroom waterproofing should be done before decoration to see if there is leakage?

  14. Anonymous users2024-01-24

    I think it's best to do it at night if it's hygienic and waterproof.

  15. Anonymous users2024-01-23

    When is the best time to do waterproofing in the bathroom? The most suitable time is May and September.

  16. Anonymous users2024-01-22

    Bathroom waterproofing is very important, so it must be meticulous and the process must be standard.

    First of all, the base layer of the wall is treated, the pit hole is repaired, the grooved place is repaired, and then the dust on the wall is taken care of, cleaned, sprinkled with water to moisten the wall, and then crossed in a cross shape. Brush the waterproof paint twice horizontally and vertically, and the uniform height is 1.8 meters. Then start to put wall tiles.

    The ground is the same, the sill stone must be pasted first, cleaned, and the corner of the sewer pipe root must be reinforced with a plugging spirit. Wet with water and then brush the waterproof paint in a cross shape, and brush the waterproof paint twice horizontally and vertically.

    It takes a total of 3 to 4 days to do a good job of bathroom waterproofing, waterproof steps:

    1. Ground treatment. Before waterproofing, be sure to level the ground, if the ground is uneven, it may affect the effect of waterproofing, and may also cause cracking and leakage caused by uneven thickness of waterproof coating. Floor drains, wall corners, pipe roots and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced, and water seepage is most likely to occur.

    2. Wall treatment. If the bathroom has a shower room, the waterproof should be 180cm, and if there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 30cm higher than the bathtub.

    3. Waterproof dead ends. During construction, it should be noted that the joints between the walls and the ground and the joints between the water and water pipes and the ground are the most likely to cause problems.

    4. Closed water test. After the completion of the waterproof construction, the closed water storage test shall be carried out, and the water at the highest point of the ground shall not be less than 2cm, and no leakage shall be deemed qualified after more than 24 hours. After the installation of the equipment is completed, the secondary water storage test is carried out.

    The basic steps of waterproof construction are generally: base treatment, brushing base treatment agent, coating 2 thick polyurethane waterproof coating, additional layer construction, EPDM coil and base layer coating special glue, drying glue, coil paving, end bonding, coil joint sealing, water storage test, waterproof layer acceptance, and protective layer.

    After the construction of the waterproof layer is completed, a 24-hour water storage test should be done, and the construction of the waterproof protective layer of the next process can be carried out only after inspection and confirmation that there is no water leakage.

    It generally takes 48 hours from the base treatment to the completion of the glue, plus the 24-hour water storage test after the completion of the construction of the waterproof layer, that is to say, the fastest time is about 72 hours (i.e. 3 days), if the floor is wet, the weather is more humid can be extended accordingly.

  17. Anonymous users2024-01-21

    This first depends on the size of the bathroom, if the area is large, it generally takes two weeks to complete the waterproofing of the bathroom. If you have a small area of more than 10 square meters, then it can be done in a week.

  18. Anonymous users2024-01-20

    It can usually be done in a week. Because the bathroom waterproof should be tested for closed water, such waterproofing is very safe.

  19. Anonymous users2024-01-19

    About three days, because during this time, we need to keep experimenting, and we also have to do it just in case, after all, if there is a water leak, or downstairs or ourselves, there are some bad effects.

  20. Anonymous users2024-01-18

    <> after the completion of the renovation of hydropower pipelines. Before the bathroom is waterproofed, the water and electricity pipes need to be renovated, and the waterproof materials can be laid after the base layer is cleaned. The waterproofing of the coating film can be carried out by leveling the ground, and there is no need to destroy the waterproof coating at this time.

    Brush several layers of waterproof paint on the pipe interface and the yin and yang corners, and find 30 cm up to the wall part to achieve the basic waterproofing of the wall in the dry area. After the waterproofing is done, a closed water test is carried out, and only after ensuring that there is no leakage, the protective layer is applied before the tiles are laid.

  21. Anonymous users2024-01-17

    Bathroom waterproofing is a very important part of the entire bathroom decoration, and construction should be carried out as soon as possible to avoid damage to facilities such as water and electricity pipes due to moisture. Generally speaking, the waterproofing construction time of the toilet has the following situations:

    Waterproofing before wall tiles are laid: This can protect the bathroom more comprehensively and prevent moisture and moisture from seeping into the wall, and if the wall tiles are applied on this basis, it can better prevent water retention and disturbance.

    Waterproofing before floor tiles are laid: Floor waterproofing is just as important as wall waterproofing, and slowing down the skin is a practice that ensures that the floor is not soaked in water, preventing the basement from being soaked in bathroom water or leaking into the downstairs neighbors.

    Waterproofing the wall and floor at the same time: This can save time and ensure that both the wall and the floor are fully protected, but you need to pay attention to the treatment of the joints of the wall and floor.

    It should be noted that the waterproof construction of the bathroom should be completed by a professional waterproof master or decoration company, and the construction should be carried out in strict accordance with the instructions for the use of waterproof materials. After the construction is completed, acceptance should be carried out to ensure that the waterproof effect is good. At the same time, during construction and use, it is also necessary to avoid damage to the waterproof layer, maintain a dry and ventilated environment in the bathroom, and try to avoid the accumulation of water vapor.

  22. Anonymous users2024-01-16

    Decoration must not only care about the shape, the good-looking skin is very simple, and the quality of construction is the last word, such as the waterproofing of the bathroom, the top priority is Zheng Xianye.

    If you don't want the downstairs neighbor to knock on your door after moving in, hurry up and take a look at how to do this bathroom waterproofing.

    Ground treatment: 1. Brush the waterproof paint for the first time. Before construction, ensure that the construction site is clean and dry, and the waterproof coating should be coated with no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off. The coating height is consistent, and the thickness should meet the requirements of the product.

    PS: Shouting floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the ground in the bathroom will be displaced and are most prone to water seepage.

    2. Brush the waterproof paint for the second time. Note that there needs to be a certain time interval between the second waterproof coatings, and the second pass can only be carried out after the paint is dry, and the specific time depends on the coating. If the interval is too short, the waterproof effect will be greatly reduced.

    3. Lay a protective layer. In order to prevent the subsequent construction from damaging the waterproof layer, it is necessary to lay a protective layer on the surface of the waterproof coating. The protective layer should be completely covered with the waterproof layer, no omission, firmly combined with the base layer, no cracks, no bubbles, and no falling off.

    4. Closed water test. During the closed water test, the waterline at the ground point should not be less than 2 cm, and it should be stored for at least 24 hours, and it should be qualified only after observing that there is no leakage. If there is a leak, it needs to be redone, and you must not be negligent.

    PS: How to do the closed water test.

    1.Plug the floor drain.

    2.Make a water barrier at the door of the bathroom.

    3.Avoid direct contact with the ground when releasing water, and remember to cushion.

    4.The waterline should not be lower than 2 cm, and it should be marked.

    5.Keep it for at least 24 hours and go downstairs to see if there is any leakage (say hello to your neighbors in advance).

    6.Don't be too troublesome.

    Wall Treatment: 1If the bathroom has a shower room, the waterproof should be 180cm, and if there is a bathtub, the waterproof height of the wall adjacent to the bathtub should be 30cm higher than the bathtub

    2. After the waterproof layer is done, a certain amount of time should be left to make the waterproof layer better integrated with the building, and then the protective layer on the waterproof layer and then paved with floor tiles.

    4. Waterproofing is a systematic project, and the causes and treatment methods are different in each place. Materials are the foundation, construction is the key, and follow-up service is the guarantee.

Related questions
16 answers2024-03-02

Bathroom leakage generally does not involve the wall, if you knock on the wall, you only need to pay attention to whether it is a load-bearing wall. However, the waterproofing of the ground should be expanded. The location of the bathroom after expansion must be waterproof!

6 answers2024-03-02

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

14 answers2024-03-02

First of all, you have to know what is missing.

Only then did I know that I needed to block **. >>>More

14 answers2024-03-02

What places must be paid attention to when making waterproofing in the bathroom? A few days ago, a partner who had just been repaired at home came to me and said that his bathroom had been waterproofed 3 times, thinking that it would be safe, but it didn't take long for the neighbor downstairs to come over and say that there was a leak, and he couldn't figure out which piece of dew it was, so he came to ask what was going on, and after listening to my answer, he suddenly realized. >>>More

7 answers2024-03-02

1. Bathroom waterproof construction steps.

Step 1: You can use slightly coarser cement as a primer first, and wait for the cement to dry before brushing the waterproof coating. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More