1. Construction project documents and archives carrier:
1) Paper carrier: paper-based carrier form.
2) Microfilm carrier: based on film, the carrier form of microfilm technology is used to preserve engineering data.
3) CD-ROM carrier: based on CD-ROM and using computer technology to store engineering data.
4) Magnetic carrier: based on magnetic recording materials, the electronic files, sounds, and images of engineering data are stored.
2. Characteristics of construction project documents and archives:
1) Fragmentation and complexity;
2) inheritance and timeliness;
3) comprehensiveness and authenticity;
4) randomness;
5) Rushing to take multi-professional and comprehensive.
3. The management of construction project archives involves construction units, supervision units, construction units, etc., as well as local urban construction archives and management departments.
For a construction project, putting into record has three meanings:
1) Construction, survey, design, construction, supervision and other units will be formed in the process of project construction of the unit to the archives management agency of the unit to hand over;
2) Survey, design, construction, supervision and other units will be formed in the process of project construction of the documents to the construction unit archives management agency to hand over;
3) the construction unit in accordance with the current "construction project documents archiving and sorting specifications" requirements, the summary of the construction project documents and archives to the local urban construction archives management department handover.
-
Archival management.
1. The project archives are part of the project construction process, which should be included in the whole process of construction, special management, and synchronized with the construction of the project. It belongs to the archives and data room to centralize and unify the management of the technical archives of the whole process of the project, supervise and inspect the formation, accumulation, collection and archiving of engineering documents and materials, and is responsible for the reception and transfer of engineering and technical archives.
2. In order to facilitate the connection of various management links, the archives room is equipped with full-time archivists, and in order to better manage the archives, the necessary warehouses, archives equipment, archives protection facilities and office equipment should be configured.
3. During the construction of the project, all kinds of technical data are handed over to the archives and data room for unified management and distribution, and the relevant departments and units designate special personnel to handle the procedures for receiving them.
4. After the equipment arrives, the material group and the relevant departments will open the box and accept it, and the equipment data (filed and sent to the construction unit) will be handed over to the archives and data room for unified management, register and establish a detailed account of receipts and inventions. The overall acceptance of each individual project shall be inspected by the archives and data room for its various technical documents and completion data, and the final payment of the final accounts of the project must be paid by the archives and data room after the completion of the data is signed and qualified.
5. The purchase of technical materials, books and standards shall be uniformly applied for by the archives department, and shall be handled according to the plan after approval, or entrusted to the relevant departments to handle it themselves. All reimbursement vouchers for the purchase of technical materials, books and standards shall be signed by the archives before the reimbursement procedures can be handled.
-
First, first enter the venue to prepare:
1. Project commencement report, construction permit, construction organization design, materials and equipment for review.
2. Concrete mix ratio design and material inspection.
3. On-site acceptance. Temporary facilities (schemes), safe and civilized construction preparations.
4. Engineering survey and positioning records.
Should be all prepared:
Basic information table of construction projects.
Construction approval materials (project approval documents requested from the construction unit).
Construction project planning permit (planning permit requested from the construction unit), notice of winning the bid for the construction project (notice of winning the bid from the construction unit), construction contract (construction contract requested from the construction unit).
Supervision contract (supervision contract requested from the supervision unit).
A copy of the qualification and personnel certificate of the construction unit.
Copies of project supervision institutions and relevant certificates.
A copy of the qualification and personnel certificate of the design unit.
A copy of the qualification and personnel certificate of the survey unit.
Copies of project construction institutions and related certificates (including qualification certificates, personnel employment certificates (project manager, technical leader, constructor, budget officer, quality inspector, safety officer, material officer, surveyor, sampler, data clerk, drainage, heating, electrical engineer).
Drawing triage records and design change documents.
Design documents and design changes before the start of construction.
Construction site quality management inspection records and schedules.
1. A package of quality responsibility system.
2. The main professional types of work operation certificates (tower cranes, scaffolding workers, gantry frames, electric welders, butt welders, straight ribbing, electroslag welders) (ask for each team).
3. The qualification contract of the subcontractor.
4. Construction drawing review (construction drawing review certificate).
5. Geological survey documents.
6. Construction organization design, construction plan and approval.
There are others.,I'm not all out here.,If you need it, you can hit it in the (library) (construction materials first enter the site to prepare) to **a.,All of the above need to be done to enter the site Of course, that is also sent by me = =!
-
It is sold at the architecture bookstore.
First, first enter the venue to prepare:
1. Project commencement report, construction permit, construction organization design, materials and equipment for review. >>>More
First of all, you must ensure your own business level, like the construction industry pays more attention to practical experience, some masters have worked for a lifetime, especially carpenters are more stubborn, you must improve your ability, so that others can convince you that you can manage your people more conveniently, secondly, use different methods for different people, and quietly listen to what others say when they encounter problems that they don't understand, (learn more by themselves) don't talk nonsense for the sake of face, so you will be laughed at by others. I haven't been doing it for long, and anyway, I always remember to learn more.
Typical example questions.
Brainless answers. Here's how to answer it. >>>More
What you mean is to do the plan for review, and I am the supervisor, who specializes in reviewing this. First of all, the company's qualifications should be complete, the on-site environment should be included, the arrangement of personnel, the arrangement of schedule, the on-site management system, safety and fire prevention measures, measures after the delay of the construction period, and so on.
The quality standards of construction projects include: meeting the quality objectives and quality requirements of the project; Comply with the agreed requirements of the signed contract and supplementary agreement; Meet the requirements of design and construction drawings and technical documents; Comply with various norms and standards and quality management rules and regulations of the department; Pass acceptance. >>>More