The specific content of the construction organization design, and what content is included in the co

Updated on society 2024-04-29
3 answers
  1. Anonymous users2024-02-08

    Chapter I: Notes on the preparation.

    Section 1: Basis for compilation.

    Chapter 2 Project Overview.

    Section 1 Project Characteristics.

    Section 2: Location Characteristics.

    Section 3 Construction Conditions.

    Section 4 Number of main luminaires.

    Chapter 3 General Construction Plan.

    Section 1 Construction objectives of the project.

    Section 2 Project Organization System.

    Section 3: Determination of the project team and construction team.

    Section 4 Construction Sequence.

    Section 5 Overall Construction Plan.

    Chapter 4 Construction Preparation and Layout.

    Section 1: Construction Preparation and Layout.

    Chapter 5 Selection and arrangement of construction machinery.

    Section 1: Selection and Arrangement of Construction Machinery.

    Chapter 6 Main Construction Methods.

    First, the technical management system.

    2. Piping engineering.

    3. Pipeline threading project.

    Fourth, cable laying engineering.

    5. Power distribution equipment installation engineering.

    Chapter VII Construction Progress and Construction Period Guarantee Measures.

    1. Construction progress and construction period guarantee measures.

    Chapter VIII Project Quality Assurance Measures.

    First, the project quality assurance system.

    Second, the implementation of the whole process of quality management.

    3. Strengthen the quality management of materials and equipment.

    Fourth, the project manager and the construction team signed a quality responsibility system, and adopted the principle of reward and punishment measures to improve the quality of construction.

    5. Quality assurance measures.

    Chapter IX Construction Safety Assurance Measures.

    1. Establish installation and production management.

    Chapter 10 Environmental Protection Measures.

    1. Environmental protection measures.

    The lighting design business is looking for Nanchang Casley Landscape Lighting Design Company.

  2. Anonymous users2024-02-07

    The content of the construction organization design includes the formulation of the overall design plan and the formulation of the construction process

    1. Formulation of the overall design plan. The construction organization design needs to formulate the overall plan of the entire construction process, including the overall layout of the project, the division of the construction area, the site selection and supporting facilities of the engineering facilities, etc., so as to carry out the construction smoothly. (as shown in the image below).

    2. Formulation of construction process. The construction organization design needs to formulate a detailed construction slag cover process, including the construction sequence, construction method, operation steps, application and construction cycle of the earthwork, structure, decoration and other projects, so as to ensure that each process is carried out in an orderly manner, and also need to consider issues such as cross operation and resource allocation. (as shown in the image below).

    Precautions for construction:

    1. Personnel entering the construction site must wear safety helmets, and personnel working in the air and at height must wear safety belts. High-altitude and roof maintenance workers are strictly forbidden to hang climbing safety belts on lightning belts.

    2. The construction operation point should be effectively closed. Within the specified construction scope, protective measures such as shielding, enclosure and construction signs shall be not less than 2 meters.

    3. During the construction process, the construction personnel must conscientiously do a good job of cleaning the work after the completion of the construction every day, so that the work is completed, the materials are clean, and the site is clear.

    4. Construction waste is strictly forbidden to be poured into the domestic garbage bin, and must be cleaned up and transported away on the same day, and is not allowed to be stacked on site. <>

  3. Anonymous users2024-02-06

    Chapter I: Basis for Compilation.

    1. Basis for compilation.

    Chapter 2 Project Overview.

    1. Introduction to the project.

    2. Preparation of venue and venue facilities.

    3. Characteristics and difficulties of the project.

    Chapter III Construction Organization.

    1. Establishment of project management organization.

    2. Responsibilities of project leaders and key management personnel.

    Chapter 4 Construction deployment (including manual and mechanical arrangements).

    1. Project objectives and control measures.

    Second, the composition of the engineering task.

    3. The division of construction areas and the control of key construction stages.

    Fourth, the main process flow of each construction stage.

    5. Preparation for construction.

    Chapter 5 Main Civil Construction Techniques.

    1. Surveying engineering.

    Second, the construction process of anti-floating anchor.

    3. Cushion and brick tire mold construction.

    Fourth, the steel bar straight thread sleeve connection.

    Fifth, the main building raft foundation reinforcement binding.

    Sixth, the raft foundation of the main building is built with large-volume concrete pouring and grinding.

    7. Scaffolding works.

    8. Reinforcement engineering.

    9. Concrete works.

    10. Formwork engineering.

    11. Masonry works.

    Twelve, fine stone pure concrete ground.

    13. Cement mortar floor.

    14. Plastering works.

    15. Painting paint.

    15. Unitized glass curtain wall.

    16. Vitrified microbeads are insulated on the exterior wall.

    XVII. Mosaic paving of exterior walls.

    18. Steel structure hoisting.

    Chapter VI Main mechanical and electrical construction technology.

    1. Water supply and drainage system.

    2. Electricity and lighting systems.

    3. Ventilation installation works.

    Chapter VII description of the main materials (materials) invested in the project and the entry plan.

    1. The main materials (materials) invested in the project

    2. The main materials (materials) are planned to enter the site.

    Chapter VIII description of the main construction machinery and equipment invested in the project and the entry plan.

    1. Preparation of construction machinery and equipment.

    2. Machinery and equipment management and quality assurance.

    3. The main construction machinery and equipment plan for entering the site.

    Chapter IX Description of Labor Arrangements.

    1. Organizational preparation of the workforce.

    2. Collaborative arrangements for the workforce.

    Chapter 10 Technical and organizational measures to ensure the quality of the project.

    1. Technical management plan.

    2. Quality management system and quality assurance measures.

    Chapter 11 Technical and organizational measures to ensure safe production.

    1. Construction safety management.

    2. On-site safety protection measures.

    3. Safety supervision and inspection.

    4. Emergency plan and safety technical measures against typhoons, rainstorms and thunderstorms.

    Chapter 12 Technical and organizational measures to ensure civilized construction.

    1. Civilized construction management.

    2. Fire protection management.

    Chapter 13 Technical and organizational measures to ensure the construction period.

    Chapter 14 to be put into the main construction machinery and equipment table.

    Chapter 15 The main labor force to be invested in the schedule.

    Chapter 16 List of main materials to be invested.

    Chapter 17 Construction schedule.

    Chapter 18 General Construction Plan and Temporary Land Surface.

Related questions
1 answers2024-04-29

The basic way of flow construction.

First, wait for the rhythm of the flow of construction. >>>More

6 answers2024-04-29

The preparation procedure for the general design of the construction organization is as follows:1. Collect and be familiar with the relevant materials and drawings required for the general design of the construction organization, and investigate and study the characteristics and construction conditions of the project; >>>More

9 answers2024-04-29

Chapter 1 General Remarks.

Section 1 Project Overview. >>>More

3 answers2024-04-29

There is a forum for the University of Architecture Hall, so go find it.

6 answers2024-04-29

It generally includes the following contents: engineering pay-off, earthwork excavation, concrete pouring, steel bar binding, formwork installation, brick wall masonry, steel (wood) structure manufacturing and installation, stone paving and other decoration, sketches and furniture placement; Terrain arrangement, seedling planting, etc.