Where there is no wall on the first floor of the frame structure, whether the wall can be built on t

Updated on home 2024-04-19
5 answers
  1. Anonymous users2024-02-08

    Absolutely. However, the following conditions apply.

    1.If it is the design stage, the structure needs to be beamed, that is, the frame structure is not load-bearing by the wall, and it is not necessary to have the wall below to make the wall. Even if there is a wall underneath, the structure needs to be made as a beam to bear the load.

    2.If you want to renovate a building that has already been completed, it is recommended to use lightweight walls. For example, light steel keel gypsum board partition wall system, high-strength cement hollow board system, 60 brick wall or 90 blocks can be.

    However, it depends on whether the span of the location of your construction is relatively large, because sometimes the design is not very conservative, and the load and deflection calculations have already reached the limit, so you need to choose a lighter partition wall system.

    The frame structure is loaded by beams and columns, and the wall only plays the role of filling and enveloping, and does not bear the load. In the construction of frame structure, the construction process of wall masonry first, and then supporting beams and column formwork is wrong. It is not only very difficult to construct, but also leads to construction quality problems and even construction quality accidents.

  2. Anonymous users2024-02-07

    You can make a lightweight wall, if you make a brick wall, it should not work, this is mainly for you to ask, your designers, the design agrees to add the wall, you can add, I am not a professional designer Hehe.

  3. Anonymous users2024-02-06

    Walls with lightweight walls, light steel keel cement boards, gypsum boards, or hollow blocks 100x100 walls.

  4. Anonymous users2024-02-05

    Yes, but choose a lightweight wall based on the load-bearing capacity. It doesn't have to be wall-to-wall.

  5. Anonymous users2024-02-04

    Dear, I'll answer this question for you. Yes, the second floor of the frame structure can be built on the first floor where there is a wall but no beams, but the corresponding conditions must be met, if it is still in the design period, this shows that the local frame structure is not to use the wall to bear the weight, and it does not have to be a wall below to make a wall, even if there is a wall below, the structural beam is needed to bear the gravity. If you want to renovate a building that has already been completed, you should use lightweight walls, such as 60 brick walls or 90 blocks, and take into account the size of the location interval during construction, sometimes the design is very open, such as the load and deflection calculations have reached the limit, and a lightweight partition wall system must be used.

    During the epidemic period, remember to call the bend site for good prevention, wear a mask, try not to go to a large number of places, if you are satisfied with this time, please like it, thank you very much.

Related questions
17 answers2024-04-19

The main advantages of frame construction:

The space separation is flexible and the weight is light, which is conducive to earthquake resistance and material saving; It has the advantage of being able to flexibly match the layout of the building, which is conducive to arranging the building structure that requires a larger space. >>>More

11 answers2024-04-19

Of course, it is a frame structure, the cost of the frame is 700-800 yuan m2, and the brick concrete is 400-500 yuan m2Specific data vary by region.

4 answers2024-04-19

First of all, the frame structure is a mechanical system. Steel-concrete structures are material systems. How do you compare the different systems? >>>More

6 answers2024-04-19

<> such a potato blade is Xanthium. Count the worms.

Such is Manuzedhara. >>>More

12 answers2024-04-19

In the past, I used to hear that many real estate projects are now on the ground floor, so the 3rd to 5th floors will be close to the bottom of the business will have problems such as noise and safety hazards, and the view will also be blocked by the roof of the bottom merchant. These floors are not habitable. Near the ground 30 meters, the pollutants will dissipate downward or horizontally after rising to a certain height with the air current, and the air quality is poor, and this height is exactly 9 to 11 floors, and the other floors are fine. >>>More