-
I also do your business, I started as an apprentice on the construction site, and now it has been 15 years, and I am now contracting projects by myself, with an annual income of 15-20w yuan. The so-called 360 lines, the line of champions, depends on your own efforts and persistence. To do our business, one is to do construction, the prospect is better, you can contract it yourself if you have a relationship, and the other is to do Party A, if you have a degree and professional title, you can go directly to Party A to be the person in charge of the hydropower project, and the prospect is also more reliable.
As for supervision, I suggest you don't do it, not to mention the low salary, there is no future, that is a profession for older talents to do, and young people are just too much to do supervision. Even if you work as a construction worker in the construction unit, the salary is 3000-5000 yuan per month, and the treatment is much better than that of the construction unit.
It is recommended that you first master all the techniques of water and electricity installation, and then take a construction engineer certificate, and you do not need to be a builder.
Second, third, and the construction engineer includes the water and electricity installation professional. If you really want to supervise, you must first take a supervision certificate, and you can rely on the supervision engineer to have a bachelor's degree.
-
The future is bright, to have a mechanical and electrical professional builder certificate, than the construction professional builder certificate, now a lot of qualifications need mechanical and electrical professional builders, in no, just work hard to test a first-class architect, a certificate to put other companies, more than 100,000 a year.
-
1, do the prospect of hydropower installation is still OK, I graduated from the Electric Power College, in the state-owned enterprises did three years of construction, now do supervision, feel that the work is relatively easy, and the work is basically not unemployed 2, the construction engineer can test the mechanical and electrical installation, not too difficult, next year I am also ready to take the test 3, it is best to have an intermediate title or above, the intermediate title can be tested after three years of registered supervision engineer, it doesn't matter whether to do supervision or not, but more than one year will be exempted from 2 courses.
-
The installation category includes water and electricity, water supply and drainage, mechanical and electrical, HVAC engineer and other categories, according to the category to go to the provincial personnel examination online has the application conditions for the professional title examination, which is different from province to province.
-
This is what it is like to learn about hydropower now.
When I was 20 years old, I sprayed primer in a furniture factory in Pingshan Town, Shenzhen, and worked until I came home at the age of 25 and got married. With a wife and children to take care of, I can't go out to work anymore, so I paint in a small furniture store in my hometown.
There are a variety of harmful substances in the paint, often in such an environment, gradually I feel unwell, decided to change careers, just my brother opened a water and electricity installation shop, urgently short of manpower, asked me to help, so I changed from a painter to a plumber, this year, I was thirty years old.
Eighteen years have passed, and I have my own plumbing and electrical materials sales department, wholesale and retail, construction and maintenance, and the business is rising step by step.
Saying this, it doesn't seem to match the subject's question, don't worry.
Three years ago, a young man who graduated from a technical school came to my shop, saying that he was majoring in hydropower and that he knew how to theoretical, and wanted to come to me as a plumber and practice well. I gladly accepted this apprentice.
The apprentice is willing to learn, has strong hands-on ability, and makes rapid progress.
Half a year later, he can basically work alone, working with water and electricity. And the blue is better than the blue, and I secretly admire the teacher.
A year later, with the support of a relative, he opened a store in the county building materials market, with water and electricity installation, kitchen and bathroom, and the business was booming
Let's talk about an older guy who works as a security captain in a company in Beijing and earns a considerable income. Later, I don't know what happened, I couldn't come back, so I had to work in my store.
I am not a traitor, I know everything, I teach by word and deed...Now, I recommend him to work as an installer in a friend's kitchen and bathroom shop, earning 300 yuan a day.
In fact, plumbers and electricians, like other types of work, can be champions, can earn money, as long as you have the heart, willing to learn and willing to do not be lazy, support your family or a slight surplus, and then work hard, be a small boss or contractor, build a house to improve the standard of living, or can.
At present, in any city, it is possible to learn plumber technology.
There are now 4 paths to learn plumber technology that can be taken. The choice is yours.
The first. Find acquaintances and friends to introduce the hydropower master to learn from him. The study time is at least half a year to more than one year to become a master.
The second. I went to his construction site with my brother and friend to do small work and entered the industry to study. The minimum study time is 2-3 years to become a master.
The third way is to find news such as apprentices through the Internet group, go to the boss to talk to, and learn from him. The study time is at least half a year to more than one year to become a master.
It's all of the above. In the past, you learned three ways of hydropower, and you have to work hard to achieve such a result.
-
The hydropower installation industry is an industry that can eat for a lifetime. Nowadays, science and technology are changing with each passing day, but the most basic water and electricity of a building still need to be pre-buried and installed manually. The society is developing, there are more and more high-rise buildings, and it also represents more and more opportunities in the hydropower installation industry.
-
The prospect is self-created and everything is the same.
-
As long as you meet the requirements for the second-level constructor examination, you can choose any major to participate in the second-level constructor examination according to the needs of enterprises or individuals.
2.The application conditions for the second-level constructor are as follows:
Those who abide by the law and discipline, have a secondary college degree or above in engineering or engineering economics and have been engaged in construction management of construction projects for more than 2 years can register for the second-level construction engineer qualification examination.
3.The Class II Construction Engineer Qualification Examination is divided into a comprehensive examination and a professional examination.
1) The comprehensive examination includes two subjects: "Construction Management of Construction Projects" and "Construction Engineering Regulations and Related Knowledge", which are the subjects of the unified examination for candidates of various majors.
2) The professional examination is a subject of "Professional Engineering Management and Practice", which is divided into 6 majors, namely: construction engineering, highway engineering, water conservancy and hydropower engineering, mining engineering, mechanical and electrical engineering and municipal public works.
-
Just from your colorful experience, you can apply for the following: construction engineering, municipal utilities, mechanical and electrical and water conservancy and hydropower, 4 more professional secondary constructors, 4 majors are now the most worthless best test is construction engineering, the other 3 majors are popular, but depending on what kind of work you are mainly engaged in now, the main purpose of the examination, on the whole, anyway, several others can be added! Hope to adopt!
I just passed the second-level building this year, and I can also q me if I have any questions.
-
(1) The professional span you are engaged in is relatively large, involving construction, mechanical and electrical, and municipal.
2) You can choose one of the three majors of architecture, mechanical and electrical engineering, and municipal administration.
-
Answer: I am happy to answer your questions, apply for water conservancy and hydropower engineering, it is to cultivate senior engineering and technical personnel who have the knowledge of survey, planning, design, construction, scientific research and management of water conservancy and hydropower projects, and can be engaged in planning, design, construction, scientific research and management in water conservancy, hydropower and other departments.
I hope it helps you and I wish you a happy life!
-
How to calculate the quantity of hydropower engineering?
-
Building and installation engineer is an umbrella term that includes hydropower engineers.
-
To put it simply, hydropower engineers are engaged in drawings and brainpower.
Construction and installation engineers do manual work in the field.
-
Hydropower engineers are engaged in drawings and brainpower.
Construction and installation engineers do manual work in the field.
-
1. Construction and installation engineer is a general term, which includes hydropower engineers.
2. Water conservancy and hydropower engineering cultivates senior engineering and technical talents who have knowledge of survey, planning, design, construction, scientific research and management of water conservancy and hydropower projects, and can be engaged in planning, design, construction, scientific research and management in water conservancy, hydropower and other departments. Students majoring in water conservancy and hydropower engineering mainly learn the basic theories and basic knowledge of mathematics, mechanics and building structure necessary for the construction of water conservancy and hydropower projects, so that students can obtain the basic training of necessary engineering design methods, construction management methods and scientific research methods, and have the basic ability of water conservancy and hydropower engineering survey, planning, design, construction, scientific research and management.
2. The engineering entity completed for the construction work of new, expanded and reconstructed buildings and structures is called construction and installation engineering.
-
Dear, I'm a life assistant hammer! I'm glad to answer for you, and the answer to the whole shout for you is as follows:1
Hydropower installation engineers have a certain electrical technical foundation and are able to install, maintain and repair electrical equipment; 2.Hydropower installation engineers have advanced hydropower technology and are able to operate hydropower installation, commissioning, transformation and other work; 3.Hydropower safety and installation engineers have certain safety and quality inspection capabilities, and can carry out safety and quality inspections of hydropower installation projects; 4.
Hydropower installation engineers have a deep understanding of hydropower systems and their principles, and can proficiently master and apply the technology of hydropower systems; 5.Hydropower installation engineers have good organizational and coordination skills, and can effectively coordinate the relevant personnel and organizations of hydropower installation projects; 6.Hydropower installation engineers have certain computer technical skills and are able to carry out computer design of hydropower installation projects.
-
The difference between a renovation plumber and a construction plumber is very big.
First: from the beginning of entering the industry, the same novice enters the industry, and you can fully learn to decorate water and electricity in 2-6 months. The apprentice at the construction site can be half a year, and he hasn't even touched the edge, because he feels that he is going to the construction site to learn technology, and actually goes to the boss to treat you as a small worker, and arranges simple physical work for you.
It takes at least 2 years to barely be considered a master.
Second: from the income ratio: decoration plumber, do some work for others, a day is more than 300, and their own income is 600-800, construction plumber, no background of the brother at least 3 years, may receive some small work.
In the end, whether the money can be taken or not is another matter.
Third: the boss you face is different. The decoration of the water and electricity master, in the face, home decoration, storefront, office, shopping mall, second-hand housing renovation are all owners, face-to-face bargaining. The work is small and easy to do, and the money is easy to take, while the construction hydropower master is faced with two packs, three packs, and the work that changes hands several times, the work is big, the money is more, and it is not easy to collect.
That's the essential difference
-
There's a lot to remember, and there's not much development. Suggested changed.
How to calculate hydropower installation** Hydropower installation knowledge.
1. Water supply and drainage pre-embedded: casing out of the house, riser through the floor casing (including balcony, toilet, tube well, floor drain, condensate; If there is still air-conditioning water, then it is necessary to add the water supply, backwater, and drainage of the air-conditioner, which are mainly casings that penetrate the wall and the good person wears the floor). 2. Electricity pre-embedded: >>>More
Generally speaking, "small property right house" is a house built on collective land, and according to the current policy, ** is generally not supported, and the property right certificate that can issue this kind of house can only be issued at the township level and village level, so it is "township property right house", also called "small property right house". The so-called small property rights issued by the township ** actually have no real property rights. This kind of house does not have a land use certificate and pre-sale permit issued by the state, and the land and housing management bureau will not file the purchase contract. >>>More
It is indeed better to learn mine construction in a coal mine than to learn mining. If you want to continue your profession, it is recommended to go to a mining construction company. The treatment of mining construction companies is generally good. >>>More
Installation method: Embed the water retaining strip in the floor tile when laying the floor tiles. >>>More