What is the process of a decoration company?

Updated on Financial 2024-04-01
7 answers
  1. Anonymous users2024-02-07

    The following is the specific process of the renovation company:

    1. The first step is the main body demolition and reform. The main demolition and reconstruction mainly includes wall demolition, wall masonry, shoveling wall skin, plastic replacement steel windows, etc. In other words, the framework of the construction site is put up first. The precautions for the demolition and modification of the main body are to avoid moving the load-bearing wall.

    2. Carry out the sub-measurement of the cabinet. Before the renovation of the water circuit, the demolition and reconstruction of the main structure will be basically completed. The sub-measurement of the cabinet is completed between the two links of hydropower transformation and main body demolition.

    It should also put forward some relevant suggestions to the homeowner for the location of the water outlet and range hood socket reserved by the developer, such as whether the location of the range hood socket will affect the installation of the range hood in the future; the proper location of the water meter; Whether the location of the water outlet is convenient for installing the sink in the future, etc.

    3. Concealment engineering and waterproof engineering. Concealed engineering refers to the pipeline engineering and structural engineering hidden inside the decorative surface in home decoration, including electrical circuits, water supply and drainage, etc.

    4. Furniture installation. After the above steps are completed, you can install the furniture, which is mainly divided into two parts, one is relatively small furniture such as lamps and sockets, and the other part is large objects such as TVs, refrigerators, sofas, etc.

    5. Home accessories. After the furniture is installed, the decoration steps are basically completed. This is an inspection carried out by the renovation company, and different home accessories will be installed for some details.

  2. Anonymous users2024-02-06

    1. Home improvement consulting:

    The decoration company negotiates with the owner, and the owner informs him of his requirements for decoration;

    2.After receiving the owner's floor plan, the decoration company will go to the site by the designer to familiarize himself with the environment, check the feasibility of the owner's requirements, and give the preliminary selected material samples.

    Two. On-site measurement: The decoration company goes to the site to conduct a survey and design the home decoration according to the comprehensive situation.

    6. Material acceptance: Home improvement materials must be accepted by the owner before the decoration work can be carried out.

    7. Mid-term acceptance: The participants in this link are the owner, the designer, the project supervisor, and the person in charge of the construction, and after the decoration acceptance result is qualified, it is necessary to sign and confirm the quality report.

    8. Final acceptance: The participants include the owner, designer, project supervisor and construction leader, who need to accept the overall acceptance of the materials, design and process quality of the decoration project, and sign and confirm after passing the acceptance.

    9. Completion of the project: After the decoration is completed, the construction site needs to be cleaned and the on-site garbage needs to be cleaned up.

  3. Anonymous users2024-02-05

    The Jinjiu decoration process is for reference only.

    1. Consultation and on-site measurement of decoration matters;

    2. Design the preliminary plan and **;

    3. Sign the decoration contract, improve the design plan, and adjust the budget;

    4. Pay the upfront payment and sign the construction contract;

    5. Construction and acceptance;

    6. After-sales service.

  4. Anonymous users2024-02-04

    The renovation process of Lanting Home is like this:

    1. Consultation and on-site measurement of decoration matters;

    2. Design scheme and decoration**;

    3. Sign the decoration contract, improve the design plan, and adjust the budget;

    4. Construction and acceptance.

    I hope it can help you, and if you still have questions, click on the avatar and wait for you to tease

  5. Anonymous users2024-02-03

    Nowadays, most of the people in the city are office workers, and they don't have much spare time to manage the decoration of their homes, so now they generally entrust the decoration to the decoration company to decorate, and they go to supervise the work on weekends. Decoration construction can be roughly divided into the following stages: 1. Civil engineering stage:

    Enter, tear down the wall, build the wall; Trenching, hydropower renovation and acceptance; Concealed water and electricity renovation project of sealing and burying trunking, waterproofing project, 24-hour closed water test on the floor of bathroom and kitchen; Bathrooms and kitchens are tiled on the walls and floors. 2. Grassroots treatment stage: carpentry approach, hanging ceiling, gypsum corner; Wrapping door covers, window covers, making wooden cabinet frames; Synchronous production of various wooden doors, modeling doors and flat pressure doors; Wooden panels brushed with dustproof paint (clear oil); window sill marble countertop leveling; Wood veneer pasting, line making and fine installation; wall base treatment, grinding, leveling; Furniture, door and window edges are pasted with stickers (protective edges) on the seams.

    3. Detail treatment stage: the wall is painted at least three times; Furniture paint entry, nail holes, paint; treatment of corners, laying of floor tiles, solid or laminate flooring, waterproofing of marble strips, baseboards; installation and commissioning of lamps, switches, sockets, sanitary ware, handles, and door locks; Cleaning and sanitation, floor tile repair, and withdrawal; Preliminary acceptance within the decoration company; The three-party appointment time is formally accepted and delivered to the owner. I won't talk about a lot of decoration company decoration processes here, just simply from the three stages, civil engineering stage, grassroots treatment stage, and detail treatment stage.

    If you want to talk about the detailed decoration process, there are about 20 steps, in fact, you just need to have a general understanding.

  6. Anonymous users2024-02-02

    First: review the legality of the decoration company you have chosen;

    Second, review the use of the design scheme in safety, practicality and aesthetics;

    Third: review and improve the construction technology of decoration;

    Fourthly, the details of each production are approved and noted in the terms;

    Fifth: review the decoration of the bird and guide the calculation of the most reasonable;

    Sixth: Agree on environmental protection materials and purchase sites to prevent counterfeiting and shoddy;

    Seventh: improve the terms of the contract and sign the contract;

    Eighth: notify the construction enterprise of various matters that should be paid attention to in the construction;

    Ninth: on-site technical disclosure points out the problems and preventive measures that should be paid attention to in the project;

    Tenth: technical disclosure of the foundation eradication part;

    Eleventh: The materials are transported to the construction site and accepted according to the brand and quantity agreed in the contract;

    Twelfth: the process production refers to the design description, national standards and local standards;

    Thirteenth: item-by-item acceptance of concealed projects to prevent hidden dangers in safety and quality of oranges;

    Fourteenth: inspect the certificate of the construction personnel during the renovation of water and electricity;

    Fifteenth: mid-term acceptance and completion acceptance to make a qualitative conclusion to the overall project;

    Sixteenth: the owner must not forget to entrust an authoritative testing agency for indoor environment testing;

    Seventeenth: After the completion and acceptance, the warranty contract must be signed to clarify the responsibility;

    Eighteenth: cleaning and clearing, pay attention to observe the details of whether there is any damage to the finished product.

  7. Anonymous users2024-02-01

    After we understand and confirm the qualifications of a decoration company, it is time to start contacting the decoration company. This has a standard process, combined with some novice owners in the background to leave me a message, asking for the specific matters of finding a decoration company, today I will return to you to introduce the process of the decoration company. This article introduces in detail what the process of the decoration company is, and all novice owners must not miss it!

    1. Preliminary contact.

    After choosing a decoration company, it is necessary to make preliminary contact with them, of course, the first thing to talk about is the requirements and **. At present, there are two kinds of decoration companies: one is to quote how much money the customer wants to invest, and the decoration company will start to design and improve in combination with the requirements; Second, the customer puts forward specific requirements for room decoration, and the decoration company reports the first to achieve these requirements.

    2. Communicate with the designer.

    Before decoration, it is necessary to understand the company's designer, because the designer's level and qualifications are directly related to the level of design, so consumers should make detailed inquiries about the designer of the selected company. As for the planning and design of home decoration, the designer is, of course, to meet the premise of the owner. However, if the owner ignores the importance of design and does not have in-depth communication and exchange with the designer, the decoration effect will be greatly reduced.

    It turns out that the more in-depth the communication with the designer, the better the decoration will be, the more satisfied the owner will be, and conversely, regrets will fill all corners of the room.

    3. Sign the decoration contract.

    If the owner is satisfied with the design of the decoration company, you can sign a contract, and the regular decoration company will also sign a construction contract with the consumer. If there is no formal contract, at least a simple agreement should be made to avoid disputes in the future. The contract must specify the specific requirements and completion date of the renovation, indicate the specific brand or model of the decoration materials used, and the warranty clause is essential.

    In addition, the contract must indicate the specific brand, specification and model of the decoration materials used to prevent the decoration company from being shoddy.

Related questions
2 answers2024-04-01

The work content and process of the merchandiser clerk are as follows: >>>More

6 answers2024-04-01

Company deregistration refers to the process in which a company needs to apply to the registration authority for cancellation to terminate the company's legal personality when a company declares bankruptcy, is acquired by another company, does not renew the prescribed business period, or dissolves within the company. Before the company goes through the company cancellation procedure with the registration authority, it must carry out the liquidation of the company in accordance with the law, including the termination of production, operation and sales activities, the settlement of the company's affairs, the settlement of civil lawsuits, the liquidation of creditor's rights and debts, and the distribution of remaining property. The liquidation of a company, regardless of its nature, should follow the following steps: >>>More

13 answers2024-04-01

Hello,The process of registering a Singapore company is as followsThe process of registering a company in Singapore is very simple, name search, signing an agreement, paying a deposit, and delivering Singapore**, and your Singapore company can be successfully handled after 7 working days, and then you only need to wait for the company information to be mailed. >>>More

12 answers2024-04-01

The steps to register a company in the USA are as follows: >>>More

22 answers2024-04-01

1. The deregistration process of a U.S. company is as follows: >>>More